Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH 3 d-e -'-'idzi SEWAGE PLAN REVIEW CHECKLIST /115(' 7 Location: A.M. Lot 71. 3 Zone of Contribution: SC Out Acreage 31' 3 //' Commercial: Residential: ( j Street: // 61fita 2 Village: fr Floor Plan: (__,/"--- # Bedrooms: J Owner: j0' - Zee-/M./9 Installer: S �Z ��S % Address: Phone: D '"j�'d'- -Z1X Phone: Builder: 7- Engineer: Address: Phone: �5 • 3 - ' _ Phone: 1/2-�1- Ptif* ��d�J /r N/A YES r-d- 1. Required#of copies received t./ 2. Date of soils exam and percolation test not older than 2 years 1.___.- 3. 4-5 ft of naturally occurring pervious material, above water table (.---- 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: t _..----- 6. ..-/6. Benchmark indicated and shown-NGVD if near wetlands (...---- 7. Septic tank minimum 10 ft from foundation, deck Var.: id...-- 8. i8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: �----- 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: (_.---- 11. .11. Tank/leaching minimum 10 ft from property line Var.: 3 .,/_ 12. System meets all other setback requirements Var.: r 13. Uses adjustment for maximum high groundwater Var.: 1. 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: C------ 15. /15. System not in top or subsoil(A,B or horizons)`, 5'removal L..------.16.Proposed contours are suitable v-------- 17. System meets slope requirements-min. 1/8", ' "preferred 18. System meets breakout requirements PVC liner: Wall: ✓----"' 19. Specified tee sizes are proper, gas baffle on outlet tee .r.........„- 20. �20. Sewage is under 10,000 gpd for parcel r____/' 21.No garbage disposal L/ 22. System adequately sized for its intended use t_.------ . _.---f. 23.Minimum 6"stone or compacted below tank and dbox C------ 24. /24.Manhole covers within 6"of grade, pump chamber cover to grade L...---"' 25. Inspection port on plastic chambers/leach field tz..---' 26. Electrical permit for pump chamber/Separate meter for duplexes h -- 27. Pump system-2" line,weep hole,check valve,tee in dbox,pump size �.- 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking -�' 30. Buoyancy calculations for tank/pump chamber ✓"-- 31. Engineer to inspect and certify soils: wall: commercial: -- 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ,...-.-- 33. H-20 loading is subject to vehicular traffic, groundwater .....--- 34. Title V Application and permit fee, installer signature �__- 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd , _� 37. Check area lots for groundwater/Label groundwater in Assessor's Map -'" Plan reviewed by: �3 6/03103