HomeMy WebLinkAboutCOC requestJune 13, 2022
Kelly Grant
Town of Yar. mouth Conservation Commission
1146 Route 2S
South Yarmouth, 1VIA
RE: SE83-2209
Kelly,
2S0 Union Street Storinwater Installation Order of Conditions
Enclosed is the As Built Plan of this storm water installation per order of conditions
as noted.
.Alton and I were at the site recently and I enclosed his letter of acceptance of the
systems' functionality.
Once you are able to set a date to meet at the site let zne or Alton know and we can
accompany you there.
Sincerely,
Roderick R. Frandino, PLS
cc Alton Stone, via entail
cc Paul Sage, via email.
34 Mountain St. #449 Island Poncl, VT 05846
508-209-1853
�r.:�:����%':�����.������������c��.�������.�����.� --- wvvw.circulnspectlandsurvey.com
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
rab
return
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
DEP File Number:
S�'83-,Z2a9
Provided by DEP
This request is being made by:
�4 uL S4&7
Name
Mailing Address
A)yR�V / Isi1,1�- OZ �c�/
City/Town State Zip Code
Phone Number I
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Applicant
Dated DEP File Number
The project site is located at:
o1-77Z 2-60 117t IMI SS7— m'
Street Address City/Town
/y `?7- /�, / V 13, >-3
Assessors Mdp/Plat Number Parcel/Lot Number
The final Order of Conditions was recorded at the Registry of Deeds for:
�
1,J076V -�
Property
�Owner (if different)
/ . 7
County Book Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
('1 WPA Form 8A — Request for Certificate of Compliance v�-
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
VYes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.aov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-you r-city-or-town. htm I ).