July 18, 2022
Karl Van Hone
Division of Natural Resources
Town of Yarmouth
424 Route 28
Yarmouth, MA 02664
Re: 401 WATER QUALITY CERTIFICATION
Application for BRP WW 07, Major project dredging- Amendment 1
At: Cape Cod Bay and Nantucket Bay, YARMOUTH, and DENNIS
401 WQC Transmittal №: X275379
Wetlands File №: SE83-2325 /SE16-2623
ACoE Application №: NAE-2008-3660
Dear Mr. Van Hone:
The Department has received an electronic communication, dated June 30, 2022, from GEI
Consultant on your behalf, requesting an extension and an amendment to the Town’s current
comprehensive 401 dredge Water Quality Certification (WQC), as referenced above. In
accordance with the provisions of Section 401 of the Federal Clean Water Act as amended (33
U.S.C. §1251 et seq.), MGL c.21, §§ 26-53, and 314 CMR 9.00, it has been determined there is
reasonable assurance the project or activity will be conducted in a manner which will not violate
applicable water quality standards (314 CMR 4.00) and other applicable requirements of state
law.
The expiration date of the current WQC is September 6, 2022. An extension is requested to
match with the expiration date of the Chapter 91 Permit #13113 to 11/20/2026. The amendment
is to remove dredge site No.1, Bass Hole and three nourishment sites, Grove St., site no. 9,
River St., site no. 13 and Wilbur Park, site no. 19. The Department is hereby extending and
amending the current comprehensive 401 in accordance with 314 CMR 9.09(2) and (3).
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 2 of 12
Project Summary Update:
Table 1 – Estimated Dredging Volume Summary (10 Years)
Dredge Site No. and
Description
Prev. Permitted
volume (A)
Est. Dredge
Events (B)
Est Dredge Volume
per event (yd3) (C)
Est Max Dredge
Volume (yd3)
A+(B*C)
20* Pine Island Entrance 2,200 2-3 1000-2000 8,200
21* Englewood Entrance
Channel 300 3-4 200-300 1,500
22/23 Englewood Ramp
and Basin 1,000 2-3 600-1000 4,000
24a* Bass River
Approach Channel 5,000 5-10 1500-3000 35,000
24b* Bass River Inlet
Channel 17,000 2-3 1500-2500 24,500
24c* Bass River
Embayment and Basin 130,000 2-3 800-7000 151,000
28a Parkers River
Approach Channel 8,000
5-10 2500-5000 54,000
28b Parkers River
Embayment 2-3 500-1000 7,000
33* Mill Creek 2,600 3-4 1500-2000 10,600
Total 295,800
*See Condition No. 14
Table 2 – Beach Nourishment Summary
Site Number Site Name Area ft2 Volume Capacity yd3
1* Bass Hole – Gray’s Beach 3,600 125
2 Bay Road 3,210 490
3 Bayview St 302 660
4 Baxter Ave 1,660 950
5 Berry Ave 1,171 65
6 Columbus Ave 2,000 540
7 Crosby St 1,300 200
8 Glenwood St 517 396
10 Homer Ave 1,300 200
11 Malfa Ave 1,207 120
12 New Hampshire Ave 467 50
14* Shore Wharf Creek Beach 4,440 100
15 Akin Ave Town Landing 1,708 305
16 Vermont Ave 665 275
17 Vernon St 796 75
18 Windmill Park 1,036 315
Bass River
25 West Dennis Beach 119,337 22,500
26 South Middle Beach 34,991 5,800
27 Bass River Beach 161,742 18,417
Parkers River
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 3 of 12
Site Number Site Name Area ft2 Volume Capacity yd3
29* Seaview Beach 25,680 5,000
30* Parkers River Beach 50,253 3,000
31* Seagull Beach Dune 112,274 6,700
32* Thatcher Beach 13,937 3,000
34 Colonial Acres Beach 36,217 29,200
Inland Ponds
35* Dennis Pond 6,075 444
36* Little Sandy Pond 1,913 80
37 Wing Grove Park 7,393 507
Total 405,442 95,414
*See Condition No. 14
Table 3 summarized the TOY restrictions recommended by the Division of Marine Fisheries
Site № and Name
Winter
Flounder
1/15-5/31
Diadromous
Alewife 4/1-6/15
Blueback 4/1-6/30
Eel 3/15-6/30
Perch 4/1-6/15
Tomcod 2/15-4/30
Horseshoe
Crab
Dredge 5/1-
6/30
Fill 5/1-7/31
Mapped
Shellfish
Resource
Combined
TOY
1-Gary’s Beach-fill No No Yes N/A 5/1-7/31
2-Bay Road-fill No No No N/A None
3-Bayview St.-fill No No No N/A None
4-Baxter Ave-fill No No No N/A None
5-Berry Ave-fill No No No N/A None
6-Columbus Ave-fill No No No N/A None
7-Crosby St-fill No No No N/A None
8-Glenwood St-fill No No No N/A None
10-Homer Ave-fill No No No N/A None
11-Malfa Road-fill No No No N/A None
12-New Hampshire Ave-fill No No No N/A None
14-Short Wharf Creek Beach-fill No No No N/A None
15-Akin Ave Town Landing-fill No No No N/A None
16-Vermont Ave-fill No No No N/A None
17-Vernon St-fill No No No N/A None
18-Windmill Park-fill No No Yes N/A 5/1-7/31
20-Pine Island Entrance Ch.-
dredge2 Yes No No Yes 1/15-5/31
21-Englewood Entrance Ch.-
dredge2 Yes No No Yes 1/15-5/31
22/23-Englewood Ramp and
Basin-dredge2 Yes No No Yes 1/15-5/31
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 4 of 12
Site № and Name
Winter
Flounder
1/15-5/31
Diadromous
Alewife 4/1-6/15
Blueback 4/1-6/30
Eel 3/15-6/30
Perch 4/1-6/15
Tomcod 2/15-4/30
Horseshoe
Crab
Dredge 5/1-
6/30
Fill 5/1-7/31
Mapped
Shellfish
Resource
Combined
TOY
24a-Bass River Approach Ch.-
dredge1 Yes
Alewife
Blueback Herring
American Eel
White Perch
Atlantic Tomcod
Yes Yes 2/15-16/30
24b-Bass River Inlet Channel
dredge3 Yes
Alewife
Blueback Herring
American Eel
White Perch
Atlantic Tomcod
Yes Yes 1/15-6/30
24c-River Embayment and
Basin-dredge2
Yes
Alewife
Blueback Herring
American Eel
White Perch
Atlantic Tomcod
Yes
Yes
1/15-6/30
25-West Dennis Beach-fill No No Yes N/A 5/1-7/31
26-South Middle Beach-fill No No Yes N/A 5/1-7/31
27-Bass River Beach-fill No No Yes N/A 5/1-7/31
28a-Parkers River Approach
Ch.-dredge1
No (if
<10,000
yd3)
Alewife
American Eel
White Perch
Atlantic Tomcod
Yes Yes 2/15-6/30
28b-Parkers River Inlet-dredge3 Yes
Alewife
American Eel
White Perch
Atlantic Tomcod
Yes Yes 1/15-6/30
28c-Parkers River Embayment-
dredge2 Yes
Alewife
American Eel
White Perch
Atlantic Tomcod
No Yes 1/15-6/30
29-Seaview Beach-fill No No Yes N/A 5/1-7/31
30-Parkers River Beach-fill No No Yes N/A 5/1-7/31
31-Seagull Beach Dune-fill No No Yes N/A 5/1-7/31
32-Thatchers Beach-fill No No Yes N/A 5/1-7/31
33-Mill Creek-dredge2 Yes
Alewife
American Eel
White Perch
No Yes 1/15-6/30
34-Colonial Acres Beach-fill No No No N/A None
35-Dennis Pond-fill No No No N/A None
36-Little Sandy Pond-fill No No No N/A None
37-Wings Grove Park-fill No No No N/A None
1 Approach Channel 2 Embayment 3 Inlet Channel
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 5 of 12
Table 4
Massachusetts Natural Heritage and Endangered Species Program (NHESP) Sites
Site No. Site Name
1 Gray’s Beach
14 Short Wharf Creek Beach
20 Pine Island Entrance Channel
21 Englewood Entrance
22/23 Englewood Ramp & Basin
24 Bass River
25 West Dennis Beach
26 South Middle Beach
27 Bass River Beach
29 Seaview Beach
30 Parkers River Beach
31 Seagull Beach
32 Thatcher Beach
33 Mill Creek
35 Dennis Pond
36 Little Sandy Pond
In accordance with the provisions of Section 401 of the Federal Clean Water Act as amended
(33 U.S.C. §1251 et seq.), MGL c.21, §§ 26-53, and 314 CMR 9.00, MassDEP has determined
there is reasonable assurance the project or activity will be conducted in a manner which will not
violate applicable water quality standards (314 CMR 4.00).
This letter serves as Amendment #11of 401 WQC, Transmittal # X275379. All Conditions
included in the original 401 WQC for this project shall remain in force. Failure to comply with
this Certification and Permit is grounds for enforcement, including civil and criminal penalties,
under MGL c.21 §42, 314 CMR 9.00, MGL c. 21A §16, 310 CMR 5.00, MGL c.91, 310 CMR
9.00 or other possible actions/penalties as authorized by the General Laws of the
Commonwealth.
If you have questions on this decision, please contact David Wong at Davidw.wong@mass.gov
or 617-292-5893.
Sincerely,
Lisa Rhodes
Wetlands Program Chief
enclosure: Communication for Non-English Speaking Parties – 310 CMR 1.03(5)(a)
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 6 of 12
cc: Paul Maniccia, Regulatory/Enforcement Division, U.S. Army Corps of Engineers, 696 Virginia Road,
Concord, MA 01742-2751
Robert Boeri, CZM, 251 Causeway Street, Suite 800, Boston, MA 02114
Simi Harrison, DMF, 836 S. Rodney French Blvd, New Bedford, MA 02744-6694
Daniel Gilmore, Brandan Mullaney, DEP SERO
Kelly Grant, Yarmouth Conservation Commission, 1146 Route 28, South Yarmouth, MA 02664
Bradford Saunders, GEI Consultant, 124 Grove Street, Suite 300, Franklin, MA 02038-3156
KC/X275379
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 7 of 12
Appendix
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 8 of 12
Table 5
Summary of Project Figures
Figure Title Date
A Yarmouth Locus Map 11/16/21
1. Site 1- Bass Hole/Gray’s Beach 11/16/21 rev 3/17/22
2. Site 1- Bass Hole/Gray’s Beach Section 11/16/21
3. Site 2-Bay Road at Hedge Shore 11/16/21 rev 3/17/22
4. Site 2-Bay Road at Hedge Shore Section 11/16/21
5. Site 3- Bayview Street Beach 11/16/21 rev 3/17/22
6. Site 3- Bayview Street Beach Section 11/16/21 rev 3/17/22
7. Site 4- Baxter Ave 11/16/21 rev 3/17/22
8. Site 4- Baxter Ave Section 11/16/21
9. Site 5-Berry Ave 11/16/21 rev 3/17/22
10. Site 5-Berry Ave Section 11/16/21
11. Site 6-Columbus Ave 11/16/21 rev 3/17/22
12. Site 6-Columbus Ave Section 11/16/21
13. Site 7-Crosby Ave 11/16/21 rev 3/17/22
14. Site 7-Crosby Ave Section 11/16/21
15. Site 8-Glenwood Street 11/16/21 rev 3/17/22
16. Site 8-Glenwood Street Section 11/16/21
17. Site 9-Grove Street 11/16/21 rev 3/17/22
18. Site 9-Grove Street Section 11/16/21
19. Site 10-Homer Ave 11/16/21 rev 3/17/22
20. Site 10-Homer Ave Section 11/16/21
21. Site 11-Malfa Road 11/16/21 rev 3/17/22
22. Site 11-Malfa Road Section 11/16/21
23. Site 12-New Hampshire Avenue 11/16/21 rev 3/17/22
24. Site 12-New Hampshire Avenue Section 11/16/21
25. Site 13-River Street 11/16/21 rev 3/17/22
26. Site 13-River Street Section 11/16/21
27. Site 14-Short Wharf Creek 11/16/21 rev 3/17/22
28. Site 14-Short Wharf Creek Section 11/16/21
29. Site 15-Akin Ave Town Landing 11/16/21 rev 3/17/22
30. Site 15-Akin Ave Town Landing Section 11/16/21
31. Site 16-Vermont Avenue 11/16/21 rev 3/17/22
32. Site 16-Vermont Ave Typical Section 11/16/21
33. Site 17-Vernon Street 11/16/21 rev 3/17/22
34. Site 17-Vernon Street Section 11/16/21
35. Site 18-Winmill Park 11/16/21 rev 3/17/22
36. Site 18-Winmill Park Section 11/16/21
37. Site 19-Wilbur Park at Highbank Road 11/16/21 rev 3/17/22
38. Site 19-Wilbur Park at Highbank Road Section 11/16/21
39. Site 20-Pine Island Entrance Channel 11/16/21 rev 3/17/22
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 9 of 12
40. Site 20-Pine Island Entrance Channel Section 11/16/21
41. Site 21-Englewood Entrance Channel 11/16/21 rev 3/17/22
42. Site 21-Englewood Entrance Channel Section 11/16/21
43. Site 22 & 23-Englewood Basin & Boat Ramp 11/16/21 rev 3/17/22
44. Site 22 & 23-Englewood Basin #2 & Boat Ramp Section 11/16/21
45. Site 23-Englewood Basin & Boat Ramp Section 11/16/21
46. Site 24- Bass River Channel & Mooring Basin 11/16/21
47. Site 24- Bass River Channel [Dredging Area A-A] 11/16/21
48. Site 24- Bass River Channel [Dredging Area B-B] 11/16/21
49. Site 24- Bass River Channel [Dredging Area C-C] 11/16/21
50. Site 24- Bass River Channel [Dredging Area D-D] 11/16/21
51. Site 24- Bass River Channel [Dredging Area E-E] 11/16/21
52. Site 24- Bass River Channel [Dredging Area F-F] 11/16/21
53. Site 24- Bass River Channel [Dredging Area G-G] 11/16/21
54. Site 24- Bass River Channel [Dredging Area End] 11/16/21
55. Site 24- Spur Channel 11/16/21
56. Site 24- Bass River Channel Section 11/16/21
57. Site 25 West Dennis Bach 11/16/21
58. Site 25 West Dennis Bach Section 11/16/21
59. Site 26-South Middle Beach 11/16/21 rev 3/17/22
60. Site 26-South Middle Beach Section 11/16/21
61. Site 27-Bass River Beach 11/16/21 rec 3/17/22
62. Site 27-Bass River Beach Section 11/16/21
63. Site 28-Parker’s River (locus) 11/16/21
64. Site 28-Parker’s River [Dredge A-A] 11/16/21
65. Site 28-Parker’s River [Dredge B-B] 11/16/21
66. Site 28-Parker’s River [Dredge End] 11/16/21
67. Site 28-Parker’s River Dredge Section 11/16/21
68. Site 29-Seaview Beach 11/16/21 rev 3/17/22
69. Site 29-Seaview Beach Section 11/16/21
70. Site 30-Parker’s River Beach 11/16/21 rev 3/17/22
71. Site 30-Parker’s River Beach Section 11/16/21
72. Site 91-Sea Gull Beach Dune 11/16/21 rev 3/17/22
73. Site 91-Sea Gull Beach Dune Section 11/16/21
74. Site 32-Thachers Beach 11/16/21 rev 3/17/22
75. Site 32-Thachers Beach Section 11/16/21
76. Site 33-Mill Creek 11/16/21 rev 3/17/22
77. Site 33-Mill Creek Section 11/16/21
78. Site 34-Colonial Acres Beach 11/16/21 rev 3/17/22
79. Site 34-Colonial Acres Beach Section 11/16/21
80. Site 35-Dennis Pond 11/16/21 rev 3/17/22
81. Site 35-Dennis Pond Section 11/16/21
82. Site 36-Little Sandy Pond 11/16/21 rev 3/17/22
83. Site 36-Little Sandy Pond Section 11/16/21
84. Site 37- Wings Grove Park 11/16/21
85. Site 37- Wings Grove Park at Long Pond Section 11/16/21
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 10 of 12
Massachusetts Department of Environmental Protection
One Winter Street, Boston MA 02108 • Phone: 617-292-5751
Communication For Non-English Speaking Parties -
310 CMR 1.03(5)(a)
1 English:
This document is important and should be translated immediately. If you
need this document translated, please contact MassDEP’s Diversity
Director at the telephone numbers listed below.
2 Español (Spanish):
Este documento es importante y debe ser traducido inmediatamente. Si
necesita este documento traducido, por favor póngase en contacto con el
Director de Diversidad MassDEP a los números de teléfono que aparecen
más abajo.
3 Português (Portuguese):
Este documento é importante e deve ser traduzida imediatamente. Se
você precisa deste documento traduzido, por favor, entre em contato com
Diretor de Diversidade da MassDEP para os números de telefone listados
abaixo.
4(a) 中國(傳統)(Chinese (Traditional):
本文件非常重要,應立即翻譯。如果您需要翻譯這份文件,請用下面列出的
電話號碼與MassDEP的多樣性總監聯繫。
4(b) 中国(简体中文)(Chinese (Simplified):
本文件非常重要,应立即翻译。如果您需要翻译这份文件,请用下面列出的
电话号码与MassDEP的多样性总监联系。
5 Ayisyen (franse kreyòl) (Haitian) (French Creole):
Dokiman sa-a se yon bagay enpòtan epi yo ta dwe tradui imedyatman. Si
ou bezwen dokiman sa a tradui, tanpri kontakte Divèsite Direktè MassDEP
a nan nimewo telefòn ki nan lis pi ba a.
6 Việt (Vietnamese):
Tài liệu này là rất quan trọng và cần được dịch ngay lập tức. Nếu bạn cần
dịch tài liệu này, xin vui lòng liên hệ với Giám đốc MassDEP đa dạng tại
các số điện thoại được liệt kê dưới đây.
7 ្ររបេសកម្ព ុជា (Kmer (Cambodian):
ឯកសាបប េះគឺមា សាបៈសំខា ់ ិងគួប្ររូវបា រក្ទ្ររភ្លា ម្។ ្ររសិ បរើអ្នក្ររូវ
បា រក្ទ្ររឯកសាបប េះសូម្េំនាក់េំ ងបនន រជានាយក MassDEP បៅ
បេខេូបស័ព្ទ្ទែេបា រាយខាងប្រោម្។
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 11 of 12
8 Kriolu Kabuverdianu (Cape Verdean):
Es documento é importante e deve ser traduzido imidiatamente. Se bo
precisa des documento traduzido, por favor contacta Director de
Diversidade na MassDEP’s pa es numero indicode li d’boche.
9 Pусский язык (Russian):
Этот документ является важным и должно быть переведено сразу.
Если вам нужен этот документ переведенный, пожалуйста, свяжитесь
с директором разнообразия MassDEP по адресу телефонных
номеров, указанных ниже.
10 ةيبرعلا (Arabic):
هذه ةقيثولا و ةماهلا مجرتت نأ يغبني.روفلا ىلع ىلا ةجاحب تنك اذا هذه ةمجرتملا ةقيثولا لاصتلاا ىجري ،
ريدم عونتلا يف MassDEPفتاوهلا ماقرأ ىلع .هاندأ ةجردملا
11 한국어 (Korean):
이 문서는 중요하고 즉시 번역해야합니다. 당신이 번역이 문서가 필요하면
아래의 전화 번호로 MassDEP의 다양성 감독에 문의하시기 바랍니다
12 հայերեն (Armenian):
Այս փաստաթուղթը շատ կարեւոր է եւ պետք է թարգմանել
անմիջապես. Եթե Ձեզ անհրաժեշտ է այս փաստաթուղթը թարգմանվել
դիմել MassDEP բազմազանությունը տնօրեն է հեռախոսահամարների
թվարկված են ստորեւ.
13 یسراف (Farsi (Persian):
دنس نيا تسا مهم اروف دياب و .تسا هدش همجرت
هب زاين امش رگا دنس نيا هدش همجرت ،سامت ام اب افطل عونت ريدم MassDEP رد یاه نفلت هرامش رکذ
ريز رد هدش .
14 Français (French):
Ce document est important et devrait être traduit immédiatement. Si vous
avez besoin de ce document traduit, s'il vous plaît communiquer avec le
directeur de la diversité MassDEP aux numéros de téléphone indiqués ci-
dessous.
15 Deutsch (German):
Dieses Dokument ist wichtig und sollte sofort übersetzt werden. Wenn Sie
dieses Dokument übersetzt benötigen, wenden Sie sich bitte Diversity
Director MassDEP die in den unten aufgeführten Telefonnummern.
401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment
permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379
Page 12 of 12
16 Ελληνική (Greek):
Το έγγραφο αυτό είναι σημαντικό και θα πρέπει να μεταφραστούν αμέσως.
Αν χρειάζεστε αυτό το έγγραφο μεταφράζεται, παρακαλούμε
επικοινωνήστε Diversity Director MassDEP κατά τους αριθμούς τηλεφώνου
που αναγράφεται πιο κάτω.
17 Italiano (Italian):
Questo documento è importante e dovrebbe essere tradotto
immediatamente. Se avete bisogno di questo documento tradotto, si prega
di contattare la diversità Direttore di MassDEP ai numeri di telefono
elencati di seguito.
18 Język Polski (Polish):
Dokument ten jest ważny i powinien być natychmiast przetłumaczone. Jeśli
potrzebujesz tego dokumentu tłumaczone, prosimy o kontakt z Dyrektorem
MassDEP w różnorodności na numery telefonów wymienionych poniżej.
19 हिन्दी (Hindi):
यि दस्तावेज मित्वपूर्ण िै और तुरंत अनुवाद हिया जाना चाहिए. आप अनुवाद इस
दस्तावेज़ िी जरूरत िै, नीचे सूचीबद्ध फोन नंबरों पर MassDEP िी हवहवधता हनदेशि
से संपिण िरें.