Loading...
HomeMy WebLinkAbout401 WQC major Yarmouth comprehensive dredging nourishment Amendment 1 7.18.2022 Charles D. Baker Governor Karyn E. Polito Lieutenant Governor Bethany Card Secretary Martin Suuberg Commissioner This information is available in alternate format. Contact Michelle Waters-Ekanem, Director of Diversity/Civil Rights at 617-292-5751. TTY# MassRelay Service 1-800-439-2370 MassDEP Website: www.mass.gov/dep Printed on Recycled Paper July 18, 2022 Karl Van Hone Division of Natural Resources Town of Yarmouth 424 Route 28 Yarmouth, MA 02664 Re: 401 WATER QUALITY CERTIFICATION Application for BRP WW 07, Major project dredging- Amendment 1 At: Cape Cod Bay and Nantucket Bay, YARMOUTH, and DENNIS 401 WQC Transmittal №: X275379 Wetlands File №: SE83-2325 /SE16-2623 ACoE Application №: NAE-2008-3660 Dear Mr. Van Hone: The Department has received an electronic communication, dated June 30, 2022, from GEI Consultant on your behalf, requesting an extension and an amendment to the Town’s current comprehensive 401 dredge Water Quality Certification (WQC), as referenced above. In accordance with the provisions of Section 401 of the Federal Clean Water Act as amended (33 U.S.C. §1251 et seq.), MGL c.21, §§ 26-53, and 314 CMR 9.00, it has been determined there is reasonable assurance the project or activity will be conducted in a manner which will not violate applicable water quality standards (314 CMR 4.00) and other applicable requirements of state law. The expiration date of the current WQC is September 6, 2022. An extension is requested to match with the expiration date of the Chapter 91 Permit #13113 to 11/20/2026. The amendment is to remove dredge site No.1, Bass Hole and three nourishment sites, Grove St., site no. 9, River St., site no. 13 and Wilbur Park, site no. 19. The Department is hereby extending and amending the current comprehensive 401 in accordance with 314 CMR 9.09(2) and (3). 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 2 of 12 Project Summary Update: Table 1 – Estimated Dredging Volume Summary (10 Years) Dredge Site No. and Description Prev. Permitted volume (A) Est. Dredge Events (B) Est Dredge Volume per event (yd3) (C) Est Max Dredge Volume (yd3) A+(B*C) 20* Pine Island Entrance 2,200 2-3 1000-2000 8,200 21* Englewood Entrance Channel 300 3-4 200-300 1,500 22/23 Englewood Ramp and Basin 1,000 2-3 600-1000 4,000 24a* Bass River Approach Channel 5,000 5-10 1500-3000 35,000 24b* Bass River Inlet Channel 17,000 2-3 1500-2500 24,500 24c* Bass River Embayment and Basin 130,000 2-3 800-7000 151,000 28a Parkers River Approach Channel 8,000 5-10 2500-5000 54,000 28b Parkers River Embayment 2-3 500-1000 7,000 33* Mill Creek 2,600 3-4 1500-2000 10,600 Total 295,800 *See Condition No. 14 Table 2 – Beach Nourishment Summary Site Number Site Name Area ft2 Volume Capacity yd3 1* Bass Hole – Gray’s Beach 3,600 125 2 Bay Road 3,210 490 3 Bayview St 302 660 4 Baxter Ave 1,660 950 5 Berry Ave 1,171 65 6 Columbus Ave 2,000 540 7 Crosby St 1,300 200 8 Glenwood St 517 396 10 Homer Ave 1,300 200 11 Malfa Ave 1,207 120 12 New Hampshire Ave 467 50 14* Shore Wharf Creek Beach 4,440 100 15 Akin Ave Town Landing 1,708 305 16 Vermont Ave 665 275 17 Vernon St 796 75 18 Windmill Park 1,036 315 Bass River 25 West Dennis Beach 119,337 22,500 26 South Middle Beach 34,991 5,800 27 Bass River Beach 161,742 18,417 Parkers River 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 3 of 12 Site Number Site Name Area ft2 Volume Capacity yd3 29* Seaview Beach 25,680 5,000 30* Parkers River Beach 50,253 3,000 31* Seagull Beach Dune 112,274 6,700 32* Thatcher Beach 13,937 3,000 34 Colonial Acres Beach 36,217 29,200 Inland Ponds 35* Dennis Pond 6,075 444 36* Little Sandy Pond 1,913 80 37 Wing Grove Park 7,393 507 Total 405,442 95,414 *See Condition No. 14 Table 3 summarized the TOY restrictions recommended by the Division of Marine Fisheries Site № and Name Winter Flounder 1/15-5/31 Diadromous Alewife 4/1-6/15 Blueback 4/1-6/30 Eel 3/15-6/30 Perch 4/1-6/15 Tomcod 2/15-4/30 Horseshoe Crab Dredge 5/1- 6/30 Fill 5/1-7/31 Mapped Shellfish Resource Combined TOY 1-Gary’s Beach-fill No No Yes N/A 5/1-7/31 2-Bay Road-fill No No No N/A None 3-Bayview St.-fill No No No N/A None 4-Baxter Ave-fill No No No N/A None 5-Berry Ave-fill No No No N/A None 6-Columbus Ave-fill No No No N/A None 7-Crosby St-fill No No No N/A None 8-Glenwood St-fill No No No N/A None 10-Homer Ave-fill No No No N/A None 11-Malfa Road-fill No No No N/A None 12-New Hampshire Ave-fill No No No N/A None 14-Short Wharf Creek Beach-fill No No No N/A None 15-Akin Ave Town Landing-fill No No No N/A None 16-Vermont Ave-fill No No No N/A None 17-Vernon St-fill No No No N/A None 18-Windmill Park-fill No No Yes N/A 5/1-7/31 20-Pine Island Entrance Ch.- dredge2 Yes No No Yes 1/15-5/31 21-Englewood Entrance Ch.- dredge2 Yes No No Yes 1/15-5/31 22/23-Englewood Ramp and Basin-dredge2 Yes No No Yes 1/15-5/31 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 4 of 12 Site № and Name Winter Flounder 1/15-5/31 Diadromous Alewife 4/1-6/15 Blueback 4/1-6/30 Eel 3/15-6/30 Perch 4/1-6/15 Tomcod 2/15-4/30 Horseshoe Crab Dredge 5/1- 6/30 Fill 5/1-7/31 Mapped Shellfish Resource Combined TOY 24a-Bass River Approach Ch.- dredge1 Yes Alewife Blueback Herring American Eel White Perch Atlantic Tomcod Yes Yes 2/15-16/30 24b-Bass River Inlet Channel dredge3 Yes Alewife Blueback Herring American Eel White Perch Atlantic Tomcod Yes Yes 1/15-6/30 24c-River Embayment and Basin-dredge2 Yes Alewife Blueback Herring American Eel White Perch Atlantic Tomcod Yes Yes 1/15-6/30 25-West Dennis Beach-fill No No Yes N/A 5/1-7/31 26-South Middle Beach-fill No No Yes N/A 5/1-7/31 27-Bass River Beach-fill No No Yes N/A 5/1-7/31 28a-Parkers River Approach Ch.-dredge1 No (if <10,000 yd3) Alewife American Eel White Perch Atlantic Tomcod Yes Yes 2/15-6/30 28b-Parkers River Inlet-dredge3 Yes Alewife American Eel White Perch Atlantic Tomcod Yes Yes 1/15-6/30 28c-Parkers River Embayment- dredge2 Yes Alewife American Eel White Perch Atlantic Tomcod No Yes 1/15-6/30 29-Seaview Beach-fill No No Yes N/A 5/1-7/31 30-Parkers River Beach-fill No No Yes N/A 5/1-7/31 31-Seagull Beach Dune-fill No No Yes N/A 5/1-7/31 32-Thatchers Beach-fill No No Yes N/A 5/1-7/31 33-Mill Creek-dredge2 Yes Alewife American Eel White Perch No Yes 1/15-6/30 34-Colonial Acres Beach-fill No No No N/A None 35-Dennis Pond-fill No No No N/A None 36-Little Sandy Pond-fill No No No N/A None 37-Wings Grove Park-fill No No No N/A None 1 Approach Channel 2 Embayment 3 Inlet Channel 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 5 of 12 Table 4 Massachusetts Natural Heritage and Endangered Species Program (NHESP) Sites Site No. Site Name 1 Gray’s Beach 14 Short Wharf Creek Beach 20 Pine Island Entrance Channel 21 Englewood Entrance 22/23 Englewood Ramp & Basin 24 Bass River 25 West Dennis Beach 26 South Middle Beach 27 Bass River Beach 29 Seaview Beach 30 Parkers River Beach 31 Seagull Beach 32 Thatcher Beach 33 Mill Creek 35 Dennis Pond 36 Little Sandy Pond In accordance with the provisions of Section 401 of the Federal Clean Water Act as amended (33 U.S.C. §1251 et seq.), MGL c.21, §§ 26-53, and 314 CMR 9.00, MassDEP has determined there is reasonable assurance the project or activity will be conducted in a manner which will not violate applicable water quality standards (314 CMR 4.00). This letter serves as Amendment #11of 401 WQC, Transmittal # X275379. All Conditions included in the original 401 WQC for this project shall remain in force. Failure to comply with this Certification and Permit is grounds for enforcement, including civil and criminal penalties, under MGL c.21 §42, 314 CMR 9.00, MGL c. 21A §16, 310 CMR 5.00, MGL c.91, 310 CMR 9.00 or other possible actions/penalties as authorized by the General Laws of the Commonwealth. If you have questions on this decision, please contact David Wong at Davidw.wong@mass.gov or 617-292-5893. Sincerely, Lisa Rhodes Wetlands Program Chief enclosure: Communication for Non-English Speaking Parties – 310 CMR 1.03(5)(a) 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 6 of 12 cc: Paul Maniccia, Regulatory/Enforcement Division, U.S. Army Corps of Engineers, 696 Virginia Road, Concord, MA 01742-2751 Robert Boeri, CZM, 251 Causeway Street, Suite 800, Boston, MA 02114 Simi Harrison, DMF, 836 S. Rodney French Blvd, New Bedford, MA 02744-6694 Daniel Gilmore, Brandan Mullaney, DEP SERO Kelly Grant, Yarmouth Conservation Commission, 1146 Route 28, South Yarmouth, MA 02664 Bradford Saunders, GEI Consultant, 124 Grove Street, Suite 300, Franklin, MA 02038-3156 KC/X275379 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 7 of 12 Appendix 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 8 of 12 Table 5 Summary of Project Figures Figure Title Date A Yarmouth Locus Map 11/16/21 1. Site 1- Bass Hole/Gray’s Beach 11/16/21 rev 3/17/22 2. Site 1- Bass Hole/Gray’s Beach Section 11/16/21 3. Site 2-Bay Road at Hedge Shore 11/16/21 rev 3/17/22 4. Site 2-Bay Road at Hedge Shore Section 11/16/21 5. Site 3- Bayview Street Beach 11/16/21 rev 3/17/22 6. Site 3- Bayview Street Beach Section 11/16/21 rev 3/17/22 7. Site 4- Baxter Ave 11/16/21 rev 3/17/22 8. Site 4- Baxter Ave Section 11/16/21 9. Site 5-Berry Ave 11/16/21 rev 3/17/22 10. Site 5-Berry Ave Section 11/16/21 11. Site 6-Columbus Ave 11/16/21 rev 3/17/22 12. Site 6-Columbus Ave Section 11/16/21 13. Site 7-Crosby Ave 11/16/21 rev 3/17/22 14. Site 7-Crosby Ave Section 11/16/21 15. Site 8-Glenwood Street 11/16/21 rev 3/17/22 16. Site 8-Glenwood Street Section 11/16/21 17. Site 9-Grove Street 11/16/21 rev 3/17/22 18. Site 9-Grove Street Section 11/16/21 19. Site 10-Homer Ave 11/16/21 rev 3/17/22 20. Site 10-Homer Ave Section 11/16/21 21. Site 11-Malfa Road 11/16/21 rev 3/17/22 22. Site 11-Malfa Road Section 11/16/21 23. Site 12-New Hampshire Avenue 11/16/21 rev 3/17/22 24. Site 12-New Hampshire Avenue Section 11/16/21 25. Site 13-River Street 11/16/21 rev 3/17/22 26. Site 13-River Street Section 11/16/21 27. Site 14-Short Wharf Creek 11/16/21 rev 3/17/22 28. Site 14-Short Wharf Creek Section 11/16/21 29. Site 15-Akin Ave Town Landing 11/16/21 rev 3/17/22 30. Site 15-Akin Ave Town Landing Section 11/16/21 31. Site 16-Vermont Avenue 11/16/21 rev 3/17/22 32. Site 16-Vermont Ave Typical Section 11/16/21 33. Site 17-Vernon Street 11/16/21 rev 3/17/22 34. Site 17-Vernon Street Section 11/16/21 35. Site 18-Winmill Park 11/16/21 rev 3/17/22 36. Site 18-Winmill Park Section 11/16/21 37. Site 19-Wilbur Park at Highbank Road 11/16/21 rev 3/17/22 38. Site 19-Wilbur Park at Highbank Road Section 11/16/21 39. Site 20-Pine Island Entrance Channel 11/16/21 rev 3/17/22 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 9 of 12 40. Site 20-Pine Island Entrance Channel Section 11/16/21 41. Site 21-Englewood Entrance Channel 11/16/21 rev 3/17/22 42. Site 21-Englewood Entrance Channel Section 11/16/21 43. Site 22 & 23-Englewood Basin & Boat Ramp 11/16/21 rev 3/17/22 44. Site 22 & 23-Englewood Basin #2 & Boat Ramp Section 11/16/21 45. Site 23-Englewood Basin & Boat Ramp Section 11/16/21 46. Site 24- Bass River Channel & Mooring Basin 11/16/21 47. Site 24- Bass River Channel [Dredging Area A-A] 11/16/21 48. Site 24- Bass River Channel [Dredging Area B-B] 11/16/21 49. Site 24- Bass River Channel [Dredging Area C-C] 11/16/21 50. Site 24- Bass River Channel [Dredging Area D-D] 11/16/21 51. Site 24- Bass River Channel [Dredging Area E-E] 11/16/21 52. Site 24- Bass River Channel [Dredging Area F-F] 11/16/21 53. Site 24- Bass River Channel [Dredging Area G-G] 11/16/21 54. Site 24- Bass River Channel [Dredging Area End] 11/16/21 55. Site 24- Spur Channel 11/16/21 56. Site 24- Bass River Channel Section 11/16/21 57. Site 25 West Dennis Bach 11/16/21 58. Site 25 West Dennis Bach Section 11/16/21 59. Site 26-South Middle Beach 11/16/21 rev 3/17/22 60. Site 26-South Middle Beach Section 11/16/21 61. Site 27-Bass River Beach 11/16/21 rec 3/17/22 62. Site 27-Bass River Beach Section 11/16/21 63. Site 28-Parker’s River (locus) 11/16/21 64. Site 28-Parker’s River [Dredge A-A] 11/16/21 65. Site 28-Parker’s River [Dredge B-B] 11/16/21 66. Site 28-Parker’s River [Dredge End] 11/16/21 67. Site 28-Parker’s River Dredge Section 11/16/21 68. Site 29-Seaview Beach 11/16/21 rev 3/17/22 69. Site 29-Seaview Beach Section 11/16/21 70. Site 30-Parker’s River Beach 11/16/21 rev 3/17/22 71. Site 30-Parker’s River Beach Section 11/16/21 72. Site 91-Sea Gull Beach Dune 11/16/21 rev 3/17/22 73. Site 91-Sea Gull Beach Dune Section 11/16/21 74. Site 32-Thachers Beach 11/16/21 rev 3/17/22 75. Site 32-Thachers Beach Section 11/16/21 76. Site 33-Mill Creek 11/16/21 rev 3/17/22 77. Site 33-Mill Creek Section 11/16/21 78. Site 34-Colonial Acres Beach 11/16/21 rev 3/17/22 79. Site 34-Colonial Acres Beach Section 11/16/21 80. Site 35-Dennis Pond 11/16/21 rev 3/17/22 81. Site 35-Dennis Pond Section 11/16/21 82. Site 36-Little Sandy Pond 11/16/21 rev 3/17/22 83. Site 36-Little Sandy Pond Section 11/16/21 84. Site 37- Wings Grove Park 11/16/21 85. Site 37- Wings Grove Park at Long Pond Section 11/16/21 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 10 of 12 Massachusetts Department of Environmental Protection One Winter Street, Boston MA 02108 • Phone: 617-292-5751 Communication For Non-English Speaking Parties - 310 CMR 1.03(5)(a) 1 English: This document is important and should be translated immediately. If you need this document translated, please contact MassDEP’s Diversity Director at the telephone numbers listed below. 2 Español (Spanish): Este documento es importante y debe ser traducido inmediatamente. Si necesita este documento traducido, por favor póngase en contacto con el Director de Diversidad MassDEP a los números de teléfono que aparecen más abajo. 3 Português (Portuguese): Este documento é importante e deve ser traduzida imediatamente. Se você precisa deste documento traduzido, por favor, entre em contato com Diretor de Diversidade da MassDEP para os números de telefone listados abaixo. 4(a) 中國(傳統)(Chinese (Traditional): 本文件非常重要,應立即翻譯。如果您需要翻譯這份文件,請用下面列出的 電話號碼與MassDEP的多樣性總監聯繫。 4(b) 中国(简体中文)(Chinese (Simplified): 本文件非常重要,应立即翻译。如果您需要翻译这份文件,请用下面列出的 电话号码与MassDEP的多样性总监联系。 5 Ayisyen (franse kreyòl) (Haitian) (French Creole): Dokiman sa-a se yon bagay enpòtan epi yo ta dwe tradui imedyatman. Si ou bezwen dokiman sa a tradui, tanpri kontakte Divèsite Direktè MassDEP a nan nimewo telefòn ki nan lis pi ba a. 6 Việt (Vietnamese): Tài liệu này là rất quan trọng và cần được dịch ngay lập tức. Nếu bạn cần dịch tài liệu này, xin vui lòng liên hệ với Giám đốc MassDEP đa dạng tại các số điện thoại được liệt kê dưới đây. 7 ្ររបេសកម្ព ុជា (Kmer (Cambodian): ឯកសាបប េះគឺមា សាបៈសំខា ់ ិងគួប្ររូវបា រក្ទ្ររភ្លា ម្។ ្ររសិ បរើអ្នក្ររូវ បា រក្ទ្ររឯកសាបប េះសូម្េំនាក់េំ ងបនន រជានាយក MassDEP បៅ បេខេូបស័ព្ទ្ទែេបា រាយខាងប្រោម្។ 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 11 of 12 8 Kriolu Kabuverdianu (Cape Verdean): Es documento é importante e deve ser traduzido imidiatamente. Se bo precisa des documento traduzido, por favor contacta Director de Diversidade na MassDEP’s pa es numero indicode li d’boche. 9 Pусский язык (Russian): Этот документ является важным и должно быть переведено сразу. Если вам нужен этот документ переведенный, пожалуйста, свяжитесь с директором разнообразия MassDEP по адресу телефонных номеров, указанных ниже. 10 ةيبرعلا (Arabic): هذه ةقيثولا و ةماهلا مجرتت نأ يغبني.روفلا ىلع ىلا ةجاحب تنك اذا هذه ةمجرتملا ةقيثولا لاصتلاا ىجري ، ريدم عونتلا يف MassDEPفتاوهلا ماقرأ ىلع .هاندأ ةجردملا 11 한국어 (Korean): 이 문서는 중요하고 즉시 번역해야합니다. 당신이 번역이 문서가 필요하면 아래의 전화 번호로 MassDEP의 다양성 감독에 문의하시기 바랍니다 12 հայերեն (Armenian): Այս փաստաթուղթը շատ կարեւոր է եւ պետք է թարգմանել անմիջապես. Եթե Ձեզ անհրաժեշտ է այս փաստաթուղթը թարգմանվել դիմել MassDEP բազմազանությունը տնօրեն է հեռախոսահամարների թվարկված են ստորեւ. 13 یسراف (Farsi (Persian): دنس نيا تسا مهم اروف دياب و .تسا هدش همجرت هب زاين امش رگا دنس نيا هدش همجرت ،سامت ام اب افطل عونت ريدم MassDEP رد یاه نفلت هرامش رکذ ريز رد هدش . 14 Français (French): Ce document est important et devrait être traduit immédiatement. Si vous avez besoin de ce document traduit, s'il vous plaît communiquer avec le directeur de la diversité MassDEP aux numéros de téléphone indiqués ci- dessous. 15 Deutsch (German): Dieses Dokument ist wichtig und sollte sofort übersetzt werden. Wenn Sie dieses Dokument übersetzt benötigen, wenden Sie sich bitte Diversity Director MassDEP die in den unten aufgeführten Telefonnummern. 401 Water Quality Certification, Town of Yarmouth comprehensive maintenance dredging and beach nourishment permit, Cape Cod Bay, and Nantucket Bay – Amendment 1 Transmittal №: X275379 Page 12 of 12 16 Ελληνική (Greek): Το έγγραφο αυτό είναι σημαντικό και θα πρέπει να μεταφραστούν αμέσως. Αν χρειάζεστε αυτό το έγγραφο μεταφράζεται, παρακαλούμε επικοινωνήστε Diversity Director MassDEP κατά τους αριθμούς τηλεφώνου που αναγράφεται πιο κάτω. 17 Italiano (Italian): Questo documento è importante e dovrebbe essere tradotto immediatamente. Se avete bisogno di questo documento tradotto, si prega di contattare la diversità Direttore di MassDEP ai numeri di telefono elencati di seguito. 18 Język Polski (Polish): Dokument ten jest ważny i powinien być natychmiast przetłumaczone. Jeśli potrzebujesz tego dokumentu tłumaczone, prosimy o kontakt z Dyrektorem MassDEP w różnorodności na numery telefonów wymienionych poniżej. 19 हिन्दी (Hindi): यि दस्तावेज मित्वपूर्ण िै और तुरंत अनुवाद हिया जाना चाहिए. आप अनुवाद इस दस्तावेज़ िी जरूरत िै, नीचे सूचीबद्ध फोन नंबरों पर MassDEP िी हवहवधता हनदेशि से संपिण िरें.