Loading...
HomeMy WebLinkAboutCompleteness Review DPWEngineering 7.15.2022TOWN OF YARMOUTH _ _ MATTACHEESE DEPARTMENT OF PUBLIC WORKS 74 TOWN BROOK ROAD, WEST YARMOUTH MASSACHUSETTS 02673 Telephone (508) 398-2231 ext. 1250 Fax (508) 771-7998 To: Brittany DiRienzo, Conservation Agent From: Amanda Lima, PE, Town EngineerA\"" Cc: Karen Greene, Director of Community Development Jeff Colby, PE, Director of Public Works Kathy Williams, PE, Town Planner Date: 7/ 1512022 Subject: Completeness Review of Stormwater Application — 150 South Street Admin & Lngineering Buildings & Grounds f tighway Waste Management Water &Wastewater Upon receipt of supplemental information for the Stormwater Application at 150 South Street on July 81", DPW Engineering provided a completeness review and has yielded the application is missing the following references in the Stormwater Application submission: • Include descriptions, drawings, and profiles of all swales and their method of stabilization per 2.04 Section (n)(i). • Include description of how the project is consistent with the requirements of 2.05 Section (5). Inclusion of designed removal of 80% TSS, 50% TP, 30% TN nutrients required. a Include calculations with citations of the average nutrient removal over a year using EPA's Region I's BMP Accounting and Tracking Tool (2016) or other BMP performance evaluation tool. 2.05 Section (6). • Include description of how the project is consistent with the requirements for discharges to impaired waterbodies. 2.05 Section (7)(a-b). Thank you!