HomeMy WebLinkAboutCompleteness Review DPWEngineering 7.15.2022TOWN OF YARMOUTH
_ _
MATTACHEESE
DEPARTMENT OF PUBLIC WORKS
74 TOWN BROOK ROAD, WEST YARMOUTH MASSACHUSETTS 02673
Telephone (508) 398-2231 ext. 1250 Fax (508) 771-7998
To: Brittany DiRienzo, Conservation Agent
From: Amanda Lima, PE, Town EngineerA\""
Cc: Karen Greene, Director of Community Development
Jeff Colby, PE, Director of Public Works
Kathy Williams, PE, Town Planner
Date: 7/ 1512022
Subject: Completeness Review of Stormwater Application — 150 South Street
Admin & Lngineering
Buildings & Grounds
f tighway
Waste Management
Water &Wastewater
Upon receipt of supplemental information for the Stormwater Application at 150 South Street on
July 81", DPW Engineering provided a completeness review and has yielded the application is
missing the following references in the Stormwater Application submission:
• Include descriptions, drawings, and profiles of all swales and their method of
stabilization per 2.04 Section (n)(i).
• Include description of how the project is consistent with the requirements of 2.05
Section (5). Inclusion of designed removal of 80% TSS, 50% TP, 30% TN nutrients
required.
a Include calculations with citations of the average nutrient removal over a year using
EPA's Region I's BMP Accounting and Tracking Tool (2016) or other BMP
performance evaluation tool. 2.05 Section (6).
• Include description of how the project is consistent with the requirements for discharges
to impaired waterbodies. 2.05 Section (7)(a-b).
Thank you!