Loading...
HomeMy WebLinkAboutEngineer PlanB.M. T.O.F 103.4 (Asomod) JJ 10" TEE. / II 00.0 14"TEE WITH GAS B AFFLE 1500 GALLON H-10 EXISTING SEPTIC TANK 7 2ND FLOOR NOT TO SCALE BATH BEDROOM BEDROOM 2 f o Z cn � MUER�i-' r N6 WCKPpEE �P' � CN� a I PROPOSED SEPTIC SYSTEM REPAIR PROFILE COVER TO WITHIN 6" OF FINISHED GRADE -------- I - ' PIPE TO BE LEVEL FOR 2' OUT OF D -BOX 98.7 ,\ 98.53 IH -10 D -Box NEW CBOX 5 -HOLE H-20 6" CO PACT STONE SEPTIC SAS R no SEPTIC SAS UPGRADE 30' Tk9 NI, 17 -- r__a 101 _ --------- 102 --102 CHIC KADEE LANE 01.7 2.7' MINIMUM 2" PEASTONE OR GEOTEXTILE FABRIC 11 1 TOP R 99.0 00 ooc®c®� ONO coo 00 980 0 o0' 000�oo Sogg �� ooc o00 ooc BOTTOM 0 96.0 (2) 500 GAL DRYWELL H-10 WITH 3/4" -1 1/2' OF DOUBLE WASHED STONE 4' ON ENDS AND 3.85' ON SIDES 5.2 12' X 25' 90.8 BOTTOM OF #1 TEST HOLE NO WATER ENCOUNTERED w 0 TEST HOLE LOG RATE: 7/2/03 TEST BY: SWEETER ENGINEERING WITNESS: D. FLAHERTY PERC RATE: < 2 MIN./INCH TEST HOLE # 1 TEST HOLE 2 0._ 100.8 EL rr 101.8 EL Ap LOAMY SAND AP LOAMY SAND 9" tOY. 3/2 100.05 EL 8' 10Y 3/4 101.14 EL Bw LOAMY SAND BwLOAMY SAND t0Y 5/8 98,61 EL 10Y 6/8 99.3 EL Cl MEDIUM SAND C7 .MEDIUM SAND 2.5Y 7/6 2.5Y 8/4. 120"1 190.8 EL 90.8 EL BOTTOM OF PERC. 48" NO WATER - C HORIZON < 2 MINS/INCH ENCOUNTERED NO WATER ENCOUNTERED GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, OVERHEAD & UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM IS TO BE INSTALLED IN COMPLIANCE WITH 310. CMR 15.00:TITLE V. 3. THIS PLAN IS NOT TO BE USED FOR: PROPERTY LINE DETERMINATION, 4. IF AN OVERDIG IS REQUIRED, DESIGNER TO INSPECT & CERTIFY THE OVER -DIG BEFORE BACKFILL 5. DESIGNER TO COMPLETE FINAL INSPECTION FOR CERTIFICATION BEFORE BACKFILL. 6. CONTRACTOR TO PROVIDE 48 HOUR NOTICE FOR. ANY REQUIRED INSPECTIONS. 7, THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 8. THE. TOP OF ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED: 9. IF SOILS ARE FOUND UNSUITABLE OR DIFFERING FROM THOSE FOUND IN SOIL LOG, CONTACT DESIGNER AND THE HEALTH DEPT. 10. IF AN OVERDIG IS REQUIRED, OR IF UNSUITABLE SOIL FOUND. CLEAN GRANULAR SAND MEETING 310CMR 15.255(3) SHOULD BE USED AS FILL MATERIAL, 5' AROUND AND UNDER S.A.S. 11. ALL 4" PIPE CONNECTIONS AT SEPTIC TANK AND D -BOX SHALL BE MORTARED IN PLACE. IF USING 18' PLASTIC RISER PIPES, THESE TOO SHALL BE MORTARED IN PLACE. DESIGN DATA NO GARBAGE DISPOSAL DAILY FLOM9: EXISTING (3) BEDROOMS X.110 GPD = 3.30 GPD SEPTIC TANK: 330 GPD X 2 = 660 GPD USE: EXISTING 1,500 GALLON H-10 SEPTIC TANK DISTRIBUTION BOX: USE: DB -5 H-20 SOIL ABSORPTION SYSTEM: USE: (2) 500 GALS. DRYWELLS WITH STONE. LEACHING AREA REQUIRED: 330 GPD a .74 = 445.95 SQ PROPOSSED BOTTOM:12' X 25'= 300 SQ,FT. PROPOSSED SIDEWALL: 2' X 74'= 148 SQ.FT. TOTAL SQ.FT. 448 SQ.FT. LQr P ApR'4 - NOTES •. 32 $�( 68 1. LEAVE EXISTING SAS IN PLACE, TO BE TIED INTO NEW D -BOX FOR FUTURE USE . 2. TEST HOLES AND PERC. TEST USED TO PREPARE THIS PLAN ARE FROM SWEETSTER ENGINEERING PROPOSED SITE PLAN DATED 7/7/03 AND FOUNDATION LOCATION FROM CERTIFIED PLOT PLAN PREPARED BY BSC GROUP INC DATED 10/30/03. 'ova""uh 3. INSTALL (2) 18" RISERS MOTARED IN PLACE ON LEACHING UNITS. ry ✓ I .. .... HEALTH AGENT APPROVAL DATE SURVEY BY: SEP nC PLAN ENGINEER: STEPHEN HAAS LacAT1oN: 6 CHICKADEE LAME WEST YARMOUTH, MA PREPARED FOR: PETER JONES '- ----_ SC ALE: 1" = 30' 6/24/22 " tat NUMBER: SHEET NUMBER: 1 MAP: 74 PARCEL: 68 Scale: I'.30' J. O'LOUGHLIN INC. -� 0 30 60 714 MAIN STREET, YARMOUTH PORT, MA 02675 (508) 362-4942 �Z¢/LvzZ