Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST / Location: A.M. I Lot__ 3 0 Zone of Contribution: In Out v Acreage Commercial: Residential: Street: ci - ( S IV6 i-Ta N r-i 13 --t-- Village: SD viml Floor Plan: NU #Bedrooms: 6-4 Zc-t>ed 5 cs?moi GE Owner: /-F U( H-R-.&_) Installer: (7(9S S Address: Phone: Phone: Builder: Engineer: 3 5(-- Address: Phone: Phone: N/A YES NO 1. Required#of copies received / 2.Date of soils exam and percolation test not older than 2 years 7 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5.Water line 10 ft from septic components Var.: V 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimu. 1 ft from foundation,deck Var.: , 8.Leaching minim 20 ft 'ill, 15 ft crawl, 10 ft slab Var.: `f7 V . 9.Leaching minimum i 1 ft from wetlands Var.: 7 10. Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.: V 11.Tank/leaching minimum 10 ft from property line Var.: S' r &. 7' S SS t/ 12. System meets all other setback requirements Var.: ✓ 13.Uses adjustment for maximum high groundwater Var.: ,/ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var. 15. System not in top or subsoil(A,B horizons)or 5'removal I 16.Proposed contours are suitable 1/ 17. System meets slope requirements-min. 1/8", 1/"preferred V 18. System meets breakout requirements PVC liner: Wall: 1 19. Specified tee sizes are proper,gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel V 21.No garbage disposal ✓ 22_ System adequately sized for its intended use / 23.Minimum 6"stone or compacted below tank and dbox V 24. Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size •,./ 28. Septic tank/pump chamber to be factory waterproofed / 29.Vent provided if leaching below 3 feet,under driveway/parking ✓ 30.Buoyancy calculations for tank/pump chamber / 31. Engineer to inspect and certify soils: wall: commercial: ,✓ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature I ✓ 33.H-20 loading is subject to vehicular traffic, groundwater 7 34.Title V Application and permit fee,installer signature ,/' 35.Foundation footing min.2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ / 37.Check area lots for groundwater/Label groundwat r in ssessor's Map Plan reviewed by: /4 4 Z 2o 2 Z .„/. 5 . .. 01 ,, ) z.