HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST /
Location: A.M. I Lot__ 3 0 Zone of Contribution: In Out v Acreage
Commercial: Residential:
Street: ci - ( S IV6 i-Ta N r-i 13 --t--
Village: SD viml Floor Plan: NU #Bedrooms:
6-4 Zc-t>ed 5 cs?moi GE
Owner: /-F U( H-R-.&_) Installer: (7(9S S
Address: Phone:
Phone:
Builder: Engineer: 3 5(--
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received /
2.Date of soils exam and percolation test not older than 2 years 7
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓
5.Water line 10 ft from septic components Var.: V
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimu. 1 ft from foundation,deck Var.: ,
8.Leaching minim 20 ft 'ill, 15 ft crawl, 10 ft slab Var.: `f7 V .
9.Leaching minimum i 1 ft from wetlands Var.: 7
10. Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.: V
11.Tank/leaching minimum 10 ft from property line Var.: S' r &. 7' S SS t/
12. System meets all other setback requirements Var.: ✓
13.Uses adjustment for maximum high groundwater Var.: ,/
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.
15. System not in top or subsoil(A,B horizons)or 5'removal I
16.Proposed contours are suitable 1/
17. System meets slope requirements-min. 1/8", 1/"preferred V
18. System meets breakout requirements PVC liner: Wall: 1
19. Specified tee sizes are proper,gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel V
21.No garbage disposal ✓
22_ System adequately sized for its intended use /
23.Minimum 6"stone or compacted below tank and dbox V
24. Manhole covers within 6"of grade,pump chamber cover to grade ✓
25. Inspection port on plastic chambers/leach field V
26. Electrical permit for pump chamber/Separate meter for duplexes ✓
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size •,./
28. Septic tank/pump chamber to be factory waterproofed /
29.Vent provided if leaching below 3 feet,under driveway/parking ✓
30.Buoyancy calculations for tank/pump chamber /
31. Engineer to inspect and certify soils: wall: commercial: ,✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature I
✓
33.H-20 loading is subject to vehicular traffic, groundwater 7
34.Title V Application and permit fee,installer signature ,/'
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ /
37.Check area lots for groundwater/Label groundwat r in ssessor's Map
Plan reviewed by: /4 4 Z 2o 2 Z
.„/. 5 . .. 01 ,, ) z.