HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE 0PLAN REVIEW CHECKLIST
Location: A.M. VO Lot 0? Zone of Contribution: In Out-Acreage 1/) L57L
alaZ of ,--�t) /Q �,� � Commercial: Residential: V''Street: ! ,1 f j„."'.------ -Village: Floor Plan: #Bedrooms: ii
H..'
Owner: g p pa r`! Installer: ci rt.-Dui S.
Address: Phone:
Phone:
Builder: Engineer: 4\ 1 m S t ic Desi 5t
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: n
6. Benchmark indicated and shown-NGVD if near wetlands ✓`_...--
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: /5, lr .
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
! 12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal t/
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred V
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal171. r,
y
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
' 24. Manhole covers within 6"of grade, pump chamber cover to grade v'
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed L
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: /,i
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ,;
33.H-20 loading is subject to vehicular traffic, groundwater
j 34.Title V Application and permit fee, installer signature
li k....."
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 01 of