HomeMy WebLinkAboutReview Checkllist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. y/ Lot 3 I Zone of Contribution: In Out V Acreage S-C)00
3 Commercial: Residential:
Street: 1 s c
Village: Floor Plan: f #Bedrooms: 7
Owner: V( N / ( 1 U A e i f 7t Installer: N/ C X'e r S o%J
Address: Phone:
Phone:
Builder: Engineer: /3 S C Cr G p
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: f-//
6. Benchmark indicated a .: own-NGVD if near wetlands
7. Septic tank minimu 10 ft ' om foundation de k Var.:
8. Leaching minimum 21 - full, 15 ft crawl 10 ft s4ab Var.: Y -
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: / '
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: V
13.Uses adjustment for maximum high groundwater Var.: c9,,p g
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓�
15. System not in top or subsoil(A,B horizons)or 5' removal ! f
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", ``'A"preferred L//
18. System meets breakout requirements PVC liner: Wall: V
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel ,k/f
21.No garbage disposal \ ;.
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox \.
24. Manhole covers within 6"of grade, pump chamber cover to grade !_
25. Inspection port on plastic chambers/leach field /
266.. /
Electrical permit for pump ehamberiSeparate meter for duplexes t/
27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size V
28. Septic tank/pump chamber to be factory waterproofed ✓ 1
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j
33. H-20 loading is subject to vehicular traffic,groundwater �,
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house /
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map I
Plan reviewed by: ►-I r_ _ •' G o3 o;