Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out Y Acreage Commercial: Residential: �' ' Street: G 0toviu5‹. Village: tit// (��G a-(1 j Floor Plan: #Bedrooms: 7---- Owner: 6-17a / 2� Installer: ,t, /11 Address: Phone: -j NF1 Phone: Builder: Engineer: 7/ 7 ) 6-TD Address: /� Phone: - F S------.2-4.2_r -7 Phone: �/ '7e (- 7 J �6 -2. e) / N/A YES /NO 1.Required# of copies received 2. Date of soils exam and percolation test not older than 2 years 1/- 3. 4-5 ft of naturally occurring pervious material, above water table L-'-- 4. /4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: L _ 6. Benchmark indicated and shown-NGVD if near wetlands L.,- 7. 17. Septic tank minimum 10 ft from foundation, deck Var.: ‘r----- 8. r/8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: -/ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: �-- 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable _ 17. System meets slope requirements-min. 1/8", '/4"preferred L_------ 1.8. System meets breakout requirements PVC liner: Wall: �.----' 19. Specified tee sizes are proper, gas baffle on outlet tee ti�/ 20. Sewage is under 10,000 gpd for parcel `/ 21.No garbage disposal 4,, 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox ;,/ 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03