HomeMy WebLinkAboutEquipment Schedule Protocol 2 7.22.2022EQUIPMENT SCHEDULE Equipment to be utilized include: A pump truck, an Excavator, loader, crane, dump & other specialized trucks, power and hand tools and additional equipment/tools (as necessary), dumpster, port a potty (as may be necessary). In the event of a coastal storm event, all gas powered equipment, port a potty and dumpster shall be removed from site to an area above the base flood elevation. CONSTRUCTION PROTOCOL Disconnection of all utilities from the current structure The existing dwelling and foundation to be demolished with debris placed in dumpsters/trucks to be hauled away from site. Existing septic components to be pumped and removed from site including polluted soils Excavation for the new footings and foundation for the new dwelling Install the footings/foundation for the dwelling, backfill and rough grade area once forms removed. Commence with construction of dwelling with framing, plywood for exterior walls and roof, install windows, make weathertight, interior partitions, rough plumbing and electrical, drywall. Interior work to be completed including but not limited to finish carpentry work, utilities, wiring, plumbing etc. Excavation for new septic system to meet the distances shown on the plan. Installation of the septic system. Inspections of the system with partial backfilling. Revegetation of site and disturbed areas and landscaping Final inspection by Engineer or Land Surveyor of the site for report to Conservation Commission for release of Certificate of Compliance