Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST f� Location: A.M. Lot Zone of Contribution: In Out v Acreage d4)4J ,, D1 61'eci-i �€f et Commercial: Residential: lam. Street: Village: ��II ^ Floor Plan: #Bedrooms: '3 __s--7-,,Owner: __s--7-,, Aqr „e ,/,_. et),SaR..di,a- Installer: 1) /Ls ! / Address: -- Phone: Phone: Builder: Engineer: (___)e/ e r 14$s U G i 4 le_I Address: Phone: Phone: N/A YES NO 1. Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 17, 5. Water line 10 ft from septic components Var.: .Benchmark indicated and shown-NGVD if near wetlands _ _ V 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: >' / 9. Leaching minimum 100 ft from wetlands Var.: � V 10.Leaching minimum 150 ft from drinking we11/25 ft irrigation well Var.: !r 11.Tank/leaching minimum 10 ft from property line Var.: 1 12. System meets all other setback requirements Var.: V 13.Uses adjustment for maximum high groundwater Var.: / 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", `/4"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee t`Y'. 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use j 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade `� 25. Inspection port on plastic chambers/leach field / I/ 26. Electrical permit for pump chamber/Separate meter for duplexes ,�// 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size k/, 28. Septic tank/pump chamber to be factory waterproofed V 29. Vent provided if leaching below 3 feet,under driveway/parking k '• 30. Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to insect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V / 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd f 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: or os 45OSScol- 2-