HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST f�
Location: A.M. Lot Zone of Contribution: In Out v Acreage d4)4J
,, D1 61'eci-i �€f et Commercial: Residential: lam.
Street:
Village: ��II ^ Floor Plan: #Bedrooms: '3
__s--7-,,Owner: __s--7-,, Aqr „e ,/,_. et),SaR..di,a- Installer: 1) /Ls ! /
Address: -- Phone:
Phone:
Builder: Engineer: (___)e/ e r 14$s U G i 4 le_I
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 17,
5. Water line 10 ft from septic components Var.:
.Benchmark indicated and shown-NGVD if near wetlands _ _
V
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: >' /
9. Leaching minimum 100 ft from wetlands Var.: � V
10.Leaching minimum 150 ft from drinking we11/25 ft irrigation well Var.: !r
11.Tank/leaching minimum 10 ft from property line Var.:
1 12. System meets all other setback requirements Var.: V
13.Uses adjustment for maximum high groundwater Var.: /
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", `/4"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee t`Y'.
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use j
23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade `�
25. Inspection port on plastic chambers/leach field / I/
26. Electrical permit for pump chamber/Separate meter for duplexes ,�//
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size k/,
28. Septic tank/pump chamber to be factory waterproofed V
29. Vent provided if leaching below 3 feet,under driveway/parking k '•
30. Buoyancy calculations for tank/pump chamber ✓
31. Engineer to insect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V /
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd f
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: or os
45OSScol- 2-