Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST / Location: A.M. 3Lf Lot 2-0l Zone of Contribution: In Out--✓ Acreage tl1c(-) 5 F Commercial: Residential: V Street: S .1---4-71)."4-k-- Si Village: Floor Plan: #Bedrooms: 2- Owner: Owner: -'n 1 Installer: C vit- Address: _ Phone: Phone: Builder: Engineer: &-1-' • wow -5 Address: Phone: Phone: N/A YES NO 1. Required#of copies received V" 2. Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5.Water line 10 ft from septic components Var.: ✓ 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: G�1YT ✓ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: ✓ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well _ Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: `coTR 14. Leaching s- CP• ft above adj. water or bottom of test hole Var.! / ' 15. System not in top or subsoil(A,B horizons) loyal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred ✓ 18. System meets breakout requirements Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel V 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade ✓ 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed ✓ 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ,/ 33. H-20 loading is subject to vehicular traffic, groundwater '/ 34.Title V Application and permit fee,installer signature ✓ 35.Foundation footing min. 2 feet above adjusted ground water for new house ✓/ 36.Deed Restriction required max. #bedrooms: max. flow: gpd V 37. Check area lots for groundwater/Label groundwater in Assessor's Map V Plan reviewed by: f fITO 1- ZZ . 6 03 01