HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. .4,3 Lot a_a____ Zone of Contribution: In Out /Acreage /3/6c
Commercial: Residential: 1/'
Street: /1')/ ?Q w Kai.)N Q
Village: Floor Plan: #Bedrooms: a„.,
Owner t.sI- - 6.,i a•.Q w. /4 2 Z.Q.rQ Installer: 04.,r
Address: Phone:
Phone:
Builder: Engineer: 3 C g„,.5 i N e eT/10.-z5
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received .-
2. Date of soils exam and percolation test not older than 2 years
17-
3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: lC
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: LV,
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: %.
9. Leaching minimum 100 ft from wetlands Var.: ✓
10.Leaching minimum 150 ft from drinking 1,vell/25 ft irrigation well Var.: V
11.Tank/leaching minimum 10 ft from property line Var.:
1 12. System meets all other setback requirements Var.: 1 ✓
13. Uses adjustor t for maximum high groundwater ' Var.: N,14. Leaching seL4 5 ft above adj. water or bottom of test hole Var.: yf' v"
15. System not in top or subsoil(A,B horizons)or 5' removal t/
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/4"preferred V
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use id '"'"' , 6'PD
23.Minimum 6"stone or compacted below tank and dbox V
' 24. Manhole covers within 6"of grade, pump chamber cover to grade V
25. Inspection port on plastic chambers/leach field 1/,,,
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size (/
28. Septic tank/pump chamber to be factory waterproofed V
29. Vent provided if leaching below 3 feet,under driveway/parking -I/
30. Buoyancy calculations for tank/pump chamber ai
31. Engineer to inspect and certify soils: wall: commercial: V
32. Engineer/Registered Sanitarian and Land Surveyor stam s/signature
33. H-20 loading is subject to vehicular traffic, groundwater - 0
34.Title V Application and permit fee, installer signature L.
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
. 37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: _c7/0- o;of
1 el 7-a 2-