Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot S1S2 Zone of Contribution: InOut / Acreage A�QOu -t- Commercial: Residential:_i____ Street: e97___Ccae______Dp___r r- Village: Floor Plan: # Bedrooms: Owner:EI /$P 2 ; Z iJO M it Installer: Sc 157,4 Ccri r\pb.,I/ Address: Phone: I Phone: Builder: Engineer: A AI, CP e S it' G Address: Phone: 1 Phone: - - N/A F YES NO -- 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years ✓ 3. 4-5 ft of naturally occurring pervious material, above water table N/ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: <„,. 5. Water line 10 ft from septic components Var.: I 6. Benchmark indicated and shown-NGVD if near wetlands I - 7. Septic tank minimum 10 ft from foundation, deck Var.: I -1� 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well- Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: ~✓ 13. Uses adjustment for maximum high groundwater Var.: /_' 14. Leaching set 4-5 ft above adj. water or bottom of test hole aV r.: I. 9 ' 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Prososed contours are suitable J 1 -;,,,... , 17. System meets slope requirements min. 1/8", V"preferred 18. System meets breakout requirements PVC liner: Wall: f ‘.,/ 19. Specified tee sizes are proper, gas baffle on outlet tee _ 20. Sewage is under 10,000 gpd for parcel j 1/' 21. No garbage disposal 22. System ade uately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox _ 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field ` - - 1 26. Electrical permit for pump chamber/Separate meter for duplexes !/ 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size _f 28. Se.tic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking V 30. Buo ancy calculations for tank/pump chamber t/ _ _ -- 31. Engineer to inspect and certify soils: wall: commercial: I a/ 32. En ineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater l....--j 34. Title V Application and permit fee, installer signature J ./ in 35. Foundation footing m . 2 feet above adjusted ground water for new house _ / 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's.Map Plan reviewed by: t 60:0: