HomeMy WebLinkAbout31987-07-21-22-RSc.r.s.i.rev2,02 Concrete Reinforcing Steel Report Briggs Engineering & Testing PROJECT: A Division of PK Associates, Inc.PROJECT#: INSPECTOR: DATE:CODE: PAGE OF TEMP.:H 89F L 74F WIND: H L √HUMID: H √L Reinforcing steel was inspected for arrangement, cleanliness and checked against working drawings and reference specifications of ACI-301 for the following items. Check marks indicate compliance. All items in non-compliance are either corrected during inspection or noted below. Size and location:Clearance to forms: Grade Strength:Extra bars at openings: Splice Lapping:Adequate ties: Spacing:Concrete coverage: Supports:Stirrup spacing: Location and Drawing #:Slab on grade walkway at adult pool Slab on grade bar building at adult pool Sonotube inside adult pool Remarks:A reinforcing steel inspection was performed for the above location. Slab on grade walkway at adult pool: 6x6" Wire mesh lapped and tied= ok. Slab on grade bar building at adult pool 6x6" Wire mesh, slab dowels at top of wall alternated into slab= ok. Sonotube inside adult pool (20) 14" Sonotube and (5) 24" sonotubes. 6 #5 Vert. with stirrups at 12" on center= ok. Please note: no drawing available on this date. Reinforcing steel noted as seen before concrete was placed on this date. Note: All test results and findings contained within this report are limited to the areas indicated. 100 Weymouth St., Unit B-1, Rockland, Ma 02370 100 Pound Rd., Cumberland, RI 02864 Approved: Director of Field Operations:YHSean Skorohod CC INFLATABLE PARK/ W. YARMOUTH 31987 Robert Carter 07/21/22 NA √ Sean Skorohod √ 12" o.c. √√ √ N/A √ √