HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTHfl-v (, ��
//"'
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. (1 Lot (P Zone of Contribution: InC Out Acreage
Commercial: Residential:
- Street: 7/ W LE. 6 a,( j, (.....) #Village: �! Gd L2,:��� / Floor Plan: Bedrooms:
Owner: 6,C// S Installer: T
Address: Phone:
Phone:
Builder: Engineer: / h re-{ r /Gee4/-
Address: Z Phone: --36 } _ �l S 9
Phone: Wtii�. _ `i vcaevcuS`
-��(f� �' S� -14 (7011 isS j r1.
YES ' Nb
1. Required# of copies received v
2. Date of soils exam and percolation test not older than 2 years +../
3. 4-5 ft of naturally occurring pervious material, above water table 1/
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1...---
5.
�5. Water line 10 ft from septic components Var.: (.
6. Benchmark indicated and shown-NGVD if near wetlands t/
7. Septic tank minimum 10 ft from foundation, deck Var.: L/
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: / ��
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well, Var.: J l ( h� \ t�
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: t/
13. Uses adjustment for maximum high groundwater Var.: i/
14. Leaching set 4-5 ft above adj. water or bottom/of test hole"Var.: ,-,
15. System not in top or subsoil(A,B horizons)4\5' removal � i z'( y�,,,t;,.y- f G,/
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", VI"preferred
18. System meets breakout requirements PVC liner: Wall: ✓�
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel k/'
21.No garbage disposal l�
22. System adequately sized for its intended use 1/
23. Minimum 6"stone or compacted below tank and dbox l�
24. Manhole covers within 6"of grade, pump chamber cover to grade I
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03