August 5, 2022
Brittany DiRienzo
Conservation Administrator
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
RE: Request Certificate of Compliance, 74 White Cedar Road, West Yarmouth,
Massachusetts, DEP File #SE83-1621; BSC Job #50629.01
Dear Ms. DiRienzo and Members of the Conservation Commission:
BSC Group, Inc. (BSC) is pleased to submit this Request for an Certificate of Compliance (RCOC)
for DEP File #SE83-1621 forthe project authorized in the Order of Conditions (OOC) issued by the
Town of Yarmouth, DEP File #SE83-1621, for the property at 74 White Cedar Point Road (the Site).
The OOC was issued on February 12, 2003.
April 8, 2022, BSC conducted an inspection to confirm the current condition of the site. The
above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work
regulated by it was never started.
Enclosed please find the following information:
1. WPA Form 8A -Request for Certificate of Compliance Form
2. OOC SE83-1621
Please review this Request for a Certificate of Compliance documenting that the OOC has
lapsed, is therefore no longer valid, and the work regulated by it was never started. Please
inform me if you have any questions or require additional information at (508)778 - 8919.
Very truly yours,
BSC GROUP, IN
r
Kieran J. Healy,
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 /508-778-8919
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
SE83-1621
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Kieran Healy
Name
349 Route 28, Unid D
Mailing Address
West Yarmouth
City/Town
MA
State
02673
Zip Code
617-896-4586
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Colin S. Phipps
Applicant
2/12/2003
Dated
SE83-1621
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
74 White Cedar Road
Street Address
West Yarmouth
City/Town
9
Assessors Map/Plat Number
6
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
Book
Page
119726
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
SE83-1621
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).