Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM LOT/J 2"..ST Date of Subdivision Apprt val / Street 3 g �*/La ., - .'_ Zone of Contribution: In iN, . Village �s0 / /it, Commercial Commercial i2f�eesi ential Owner: �/'' �l�11/G Installer , (4 r Builder: Engineer Vek--2/.2-/ ‘ 9( N/A YES NO 1. Required number of copies received. X 2. Date of soils exam and percolation test not older than 2 years. v 3. 4 feet of naturally occurring pervious material, above water table(new construction) x 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. se 6. Benchmark indicated and shown-NGVD if near wetlands. ? . 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. X 9. Leaching a minimum of 20 feet from house and 10 feet from deck. X 10. Leaching a minimum of 100 feet from wetlands. >( 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. X 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. X 16. Proposed contours are suitable. ,X 17. System meets slope requirements - min. 1/8". 1/4" preferred. -18. System meets breakout requirements - peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper. gas baffle on outlet tee. 20. Sewage flow under 10.000 gpd for parcel. 1/421. No garbage disposal. 22. System adequately sized for its intended use. )( 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. X 26. Pump system- 2" line,weep hole. check valve, sanitary in d-box. alarm on separate circuit.X 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule )( c. commercial system X 30. Engineer and Land Surveyor stamp and signature. X 31. H2O loading when system subject to vehicular traffic. ')G 32. Title V application and fee signed by a licensed installer. jc 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31. 1986 - Nitrate Loading. 35. Subdivided prior to April 7. 1989 - Phosphorus Zone 300'. .;.. . Plan reviewed by: ;i