Loading...
HomeMy WebLinkAboutEngineer Planr - STANDARD NOTES 1) THIS PLAN IS FOR =INSTALLATION OR REPAIR OF A SEPTIC SYStEM, AND IS NOT INTENDED FOR SURVEYING OR ZONING PURPOSES. TOP OF 2) ALL INSTALLATION PROCEDURES AND MATERIALS SHALL CONFORM TO 310 CMR 15.000, THE STATE EYWRONMENTAL CODE, YOUNDAY70N TITLE 5, AND THE TOWN OF --- _�BJV UBSURFACE'DISPOSAL REGULATIONS. EL 99.5± 3) NO DETERMINATION HAS BEEN MADE AS TO COMPLUNCE OF AVAILABLE PROPERTY INFORMA77ON WITH RECORDED DEEDS OR ZONING REGULATIONS. 4) TOWN WATER SERVICES THIS PROPERTY. 5) THERE ARE NO KNOWN PRIVATE WELLS ON THIS PROPERTY OR WITHIN 100' OF THE PROPOSED SOIL ABSORPTION SYSTEM. 6) ALL COVERS OF SYSTEM COMPONENTS SHALL BE BROUGHT TO WITHN 12" OF FINISHED GRADE, WITH ONE COVER OF THE SEPTIC TANK BROUGHT 07TRIN 6" OF GRADE. 96.83± INVERT RE 7) ALL SYSTEM COMPONENTS SHALL REMAIN ACCESSIBLE FOR INSPECTION. NO STRUCTURES SHALL BE LOCAT'E'D DIRECTLY UPON OR ABOVE THE COMPONENT ACCESS LOCATIONS, WHICH WOULD INTERFERE WITH THE PERFORMANCE, ACCESS, INSPECTION 96.30± INVERT EL PUMPING OR REPAID 8) NO DRIVEWAY, PARKING OR TURNING AREA, OR OTHER IMPERVIOUS AREA SHALL BE LOCATED ABOVE A SOIL ABSORPTIONEL SYSTEM EXCEPT WHEN VENTING HAS BEEN PROVIDED. BOTTOM 9) SEPTIC TANKS; GREASE TRAPS, DOSING CHAMBERS AND DIS7RIBU770N BOXES SHALL BE PLACED ON A 8" STONE BASE TO ENSURE STABILITY AND PREVENT SETTLING. 18'± 10) OUTLET DISTRIBUTION LINES SHALL REMAIN LEVEL FOR A MINIMUM OF THE FIRST TWO FEET OF THEIR LENGTH. 11) ALL SYSTEM COMPONENTS SHALL BE CAPABLE OF WITHSTANDING H-10 LOADEVG UNLESS THEY ARE UNDER OR WITHIN 10' OF DRIVEWAYS OR PARKING OR TURNING AREAS, IN WHICH CASE H-20 COMPONENTS SHALL BE USED. 12) ALL BUILDING SEWER LINES SHALL RAVE AN INNER DIAMETER OF 4" AND SHALL BE CAST-IRON OR SCHEDULE 40 PVC. 13) THE DEPTH OF THE TOP OF ALL SYSTEM COMPONENTS SHALL NOT EXCEED 36" UNLESS VENTING HAS BEEN PROVIDED. 14) IN THE AREAS OF EXCAV4770N, EXISTING GRADES SHALL BE REESTABLISHED UNLESS NOTED AS PROPOSED CONMURS. -AR—S! ENCOUNTERED DbWLW THE EMWITION OF THE 5-01-1 THE DEEP OBSERVATION HOLE LOG, CONTACT THE ENGINEER BEFORE PROCEEDING. 16) CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND U77LITIES. TBM EL = 100.00 Top of Cone. Bnd. 100.00' N 82,08,40" E (99 8) (99.0) nN�. `� N Proposed Leaching Facility (96.1) Two 4'x 45'x 0.5'(deep) Trenches d I l (98.3) (98.6) V1 Propos d 1,500 gal. c z Septic Tank (97.7) Tx 1 NOTE: 131 11'� Location of Existing Cesspool(s) o ,a X/ Unknown D—Box �� µ Pump and Fill or Remove 0 14f (98.) as Necessary l (99. (98.8 9 { COp,C• H- TBM EL = 99.3 BT1Cp 4A Patio Cor. Conc. Patio 98.7) r (98.8 vert EI,98.83t W In Eisting 3 BR (9 .9� .... N douse ' ... ) W (TOP 99,w:) N I WG t- w no d �w WG .W 10 .00' g 82'0,8' 40 'W ...... - - - - - - . (97.8EEN ' r'y TR GROUND SURFACE EL 98.5f ,j �I GROUND SURFACE AL -_98.5f OUTLET PIPE LEVEL FDUT TWO FEET 2.8'± NO VENT REQUIRED 95.7± TOP EL !4N 2' LAYER VOLMLE WASHED 1/6'- 1/L- STONE 0.5' EFFECTIVE 95.20± I SmEwALL INVERT EL 95.48± Leaching 7iench 3/4'- 1 1/2' DOUBLE (7,gpical) WASHED STONE INVERT' EL 5.3'± 94.70± 94.51 BOT7VM AZ AT BOT7YIA(' EL AT 12'± BEGLNN%G OF TRENCH 89.2± END OF TRENG'H I EL EST HIGH GROUNDWATER 45' 1 DESIGN DATA Number of Bedrooms: AN Garbage Grinder: NO Design Flow: i 330 (110 Gal/BB/Day z Number ofl BR) LI UID LEVEL Septic Tank: LE-, 101 (Minimum = Design Flow z 20,0%) on Leaching Area: D- I4" / 96.05± � (4 Sidewalle z 0 - 5 n. z _4jLn) + GAS BAFFLE AT OUTLET NVERT EL 36 95.65± 360 (2 Tranches z __4__n I 45 FL) 10YR616 INVERT EL 6" STONE BASE 1500 Cal . eptic Tank (Sidewall Area + RoHom Area) z LIAR (Typical) I t4'± i SAND ,j �I GROUND SURFACE AL -_98.5f OUTLET PIPE LEVEL FDUT TWO FEET 2.8'± NO VENT REQUIRED 95.7± TOP EL !4N 2' LAYER VOLMLE WASHED 1/6'- 1/L- STONE 0.5' EFFECTIVE 95.20± I SmEwALL INVERT EL 95.48± Leaching 7iench 3/4'- 1 1/2' DOUBLE (7,gpical) WASHED STONE INVERT' EL 5.3'± 94.70± 94.51 BOT7VM AZ AT BOT7YIA(' EL AT 12'± BEGLNN%G OF TRENCH 89.2± END OF TRENG'H I EL EST HIGH GROUNDWATER 45' 1 DESIGN DATA Number of Bedrooms: 3 Garbage Grinder: NO Design Flow: i 330 (110 Gal/BB/Day z Number ofl BR) soil UXtUre Septic Tank: 1, 1500 (Minimum = Design Flow z 20,0%) on Leaching Area: (MameD) Sidewalk•/� 98 � (4 Sidewalle z 0 - 5 n. z _4jLn) + LOAMY SAND (4 Rndwnlls z D--d-Ft z 4-n) 36 Bottom i 360 (2 Tranches z __4__n I 45 FL) 10YR616 Long Term Acceptance Rate (LTAR): Leaching Area Design Capacity: 339 (Sidewall Area + RoHom Area) z LIAR 2.6Y6/6 i} Q of ti LOCUS MAP 38 Evergreen Stre S. Yarmouth, MA DEEP OBSERVATION DOLE LOG Test Hole #1 (EL = 98.7. ±) t�. �>Pn) tt) Ho soil UXtUre soil color on (MameD) 12 97.7-t A LOAMY SAND IOYR31 36 95.71 B LOAMY SAND 10YR616 132 87.71 C FINE -MED 2.6Y6/6 SAND Deep Obs Hole Date: APR 26, 1997 Soil Evaluator. RICHARD LEARNED Witnessed By: R JUDD Pere Rate: < 2 HIN/IN 0 6.6' Soil Survey Description: CARVER -Geologic Material: OU7VASH Depth to Standing Water: 120'• Depth to Weeping Water. NA Depth to Mottling(Color): NA Ist Seasonal High GW: 114" USGS Observation Welk " 29 Date of Last Measurement APR 22. 1997 Comments: PROJECT LOCATION ASSESSORS MAP 29 LOT NI -215 APPLICANT - Andre Camire Princeton Road Sterling, MA 01564 MAY 2 1497 HEA H DEPT PREPARED BY .4 & M Land Services Cape—Tech Environmental 33 Old Main Street P.O. Box 1541 South Yarmouth, MA 02684 Brewster, MA 02831 (608) 398-2121 Fax 394-9842 (508) 896-4898 SCALE 1 " = 20' DATE.• May 19, 1997 REV. DWG. NO. T2037A SHEET 1 OF 1