Loading...
HomeMy WebLinkAboutEngineer PlanTAP iX- i OUtiDA.TION i`'_. EL=iQ3.92 INSTALL INLET TEE IF ONE DOES NOT EXIST COVER 9" MINIMUM 11, OF4' SCH 40 j 1G" L EXS ilh 1,500 GAl i t„V 14- RENF 1 FI TEE WITH GAS BAFFLE (CENTERED IN TANK OPENING) SEXISTING SEPTIC SYSTEM PROFILE TANK NOT TO SCALE RISER ON D -BOX TO BE BROUGHT TO WITHIN 6" OF GRADE r PROVIDE SPEED LEVELERS ON OUTLETS V OF 4' SCH 40 LEVEL STAB BASE CONSISTING OF 6" RUSHED STONE TO BE GRADED SUCH THAT COVER DOES NOT EXCEED 36" MAX FINISHED GRADE ELEV=103.7 MIN FINISHED GRADE ELEV=101.5 INSPECTION PORT ON CHAMBERS TO COVER BE BROUGHT TO WITHIN 9" MINIMUM 3" OF GRADE 2" OF I' PEASTONE OR 36" MAXIMUM 8 OZ. NON WOVEN GEOTEXTLE E LN=10076 - TOP CHAMBER 10' DEPTH OF W - 1 r DOUBLE I. .. �- WASHED CRUSHED STONE (SEE SITE PLAN FOR ORIENTATION) (4) -HI CAPACITY H2O INFILTRATORS PROPOSED SOIL ABSORPTION SYSTEM .._ `+ 101.74 _. 101.11 E TING ED� r" -_P A VF MIF, fJT _. I JOSHUA BAKER RU ca I' 40' WIDE R.O.W. N 54'34'40' W 100.00' _ 100.62._. AD J _ -... _ -..___ + 100.58 _ FINE SAND 7 5YR 6/6 EM., r1iin fired for LOOT BENCHMARK SQ.86 MAG NAIL IN PAVEMENT ELEV.=101.34 D.24 ACRES± �! (ASSUMED) / OF MAO 102.06 +102.75 ! : ASP, J. WimIZ . i f / '. o CNIL U NQ 52669 IONPL <a 101.42 0 EM + wSZa< om\ a ZMOf< EXISTING in T n \ �"DWELLING 0 -'r'>< 101.97 M '^ TOP OF FOUNDATION OM ELEV. = 103.92' (ASSUMED) FULL FOUNDATION 3 - BEDROOM \ SLAB FNDN 102.56 I >5' SEPARATION TO SEASONAL HIGH GROUNDWATER ADJUSTED HIGI GROUNDWATER ELEV =93.82 LOCUS SCALE 1"=1000' 0" 18" 26" 45" � ^ Permit valid for REPAIR OiA�3EF71C o 102.02 !, ! EXISTING 1,500 GALLON .ONLY, due to State and Local septic v CONCRETE SEPTIC 'TANK 's Board of Health review end approval 1 req (TO BE RE -USED) _' 101,82 p future additionstrenovation ALEXAN slit:Fa�tt ADBTYNAN 20 SHU�1E BAKER lent 23 JO AE®XDtoui4 HeaRk Department MAP 39. PARCEL 132 N --- - - - - L APPROVED GW z '. { E 1 µ EXISTING w l DISTRIBUTION O { { BOX o { { (TO BE REMOVED) N LIMIT OF OVERDIG I II LIMIT OF n N me EXISTING EXISTING { -101 97 CRUSHED STONE TP --1 - HTM A'MySAND 7.5YR 4/2 B LOAMY FINE SAND 7.5YR 4/6 C FINE SAND 7 5YR 6/6 EM., r1iin fired for 101.95 100.46 99.79 96.12 2 ADJ =93.62 �7- OBS.=92.12 91.96 NONE IED 0 118" ? MIN./IN. 1Mte H JUJILN I_�./ �, MAPLE TREE �� I LEGEND MAGNOLIA M SOIL PROFILES . TH-1 _ _ � s J-.3- - - - - ®� 101.66 TREE - -- 101.96 `'' DATE• JULY 4 2022 � 102.23 ` PROPERTY UNE ,, / i- PERFORMED BY 1 RICK JUDD 36.00 q RELOCATED -_ --- -- EXISTING CONTOUR SHED TO BE WITNESSED BJAY GARDINER INSPECTION PORT T (TYP OF '2) I - 4-F-- EXISTING FENCE NOT TO SCALE I tYo i I 101.44 - G - EXISTING UNDERGROUND GAS SERVICE x:10, IJ I E--- EXISTING OVERHEAD UTILITIES 23.5'1 W EXISTING WATER UNE LL - e ` - - - J / 10' MIN.1-6 \ _ TO PROPERTY TP -1 LOCATION OF TEST i PIT PERC TEST - - -" _ _ '- - '� - - � LINE EXISTING + 101.63 OAK TREE PROPOSED PROPOSED S.E 3 -OUTLET (4) H-20 HIGH CAPAC DISTRIBUTION BOX INFILTRATORS WITH OF STONE AROL 100.98 EXISTING FENCE 101.34 PROPERTY LINE (TYP.) N 54734'40" W 92.50HOLLY HANSEN 16 CHECKERBERRY MAP 39, PARCEL FLOOR PLAN NOT TO SCALE FRONT F• 99.76 X EXISTING SPOT ELEVATION I LIVING ROOM 101.43 BH BULKHEAD EXISTING FLOW DIF LEACH FIELD (TO BE REMOVED) E RCH 101.441J101 39 SITE INFORMATION ADDRESS: 19 JOSHUA BAKER ROAD, WEST YARMOUTH MAP/LOT: 39/133 DEED REFERENCE: 18483/79 DESIGN CALCULATIONS DESIGN FLQW 110 GALLONS/DAY/BEDROOM X 3 BEDROOMS=330 GALLONS/DAY TANK CAPACITY 2009 DAILY FLOW = 660 GALLONS; USE EXISTING 1,500 GALLON TANK REQUIRED LEACHING CAPACITY DESIGN PERC RATE _ < 5 MIN/INCH 330 GPD / 0.74 GPD PER SQ. FT. 445.95 SQ. FT. PROVIDED LEACHING CAPACITY BOTTOM AREA = 36.00' X 11.00' = 396.00 SQ. FT. SIDE AREA = 94.00' X 0.83' = 78.09 SO, FT. 474.02 SQ. FT. CTPD PROVIDED = 350.77 GPD GENERAL NOTES: 1. THE SUBJECT PROPERTY IS WITHIN A FEMA FLOOD HAZARD ZONE X AS SHOWN ON PANEL NO. 25001CO588J, EFFECTIVE DATE JULY 16, 2014. 2. THE SITE IS NOT LOCATED WITHIN A ZONE II AREA. 3. THERE ARE NO STREAMS OR WETLANDS WITHIN 100 -FEET OF THE PROPOSED SUBSURFACE SEWAGE DISPOSAL SYSTEM. 4. VERTICAL DATUM IS ASSUMED 5. ALL CONSTRUCTION MEANS AND METHODS SHALL CONFORM TO 310 CMR 15.00 STATE REGULATIONS AND LOCAL BOARD OF HEALTH AND BUILDING DEPARTMENT REGULATIONS. 6. ALL JOINTS IN THE TANK AND DISTRIBUTION BOX SHALL BE MADE WATERTIGHT THROUGH THE USE OF ASPHALT OR SYNTHETIC POLYMER SEALERS OR HYDRAULIC CEMENT. 7. DIGSAFE AND LOCAL UTILITY COMPANIES SHALL BE CONTACTED PRIOR TO ANY EXCAVATION OCCURRING. B. LOCATION OF UTILITIES ON THIS PLAN ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD. 9. THE SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE DESIGN ENGINEER 2 DAYS PRIOR TO BEGINNING INSTALLATION OF THE SYSTEM TO ALLOW FOR SCHEDULING OF INSPECTIONS 10. WHERE APPLICABLE, UNSUITABLE MATERIAL (A & B HORIZONS) ENCOUNTERED BELOW THE INVERT OF THE INLET TO THE SOIL ABSORPTION SYSTEM, SHALL BE REMOVED TO A DISTANCE 5' AROUND THE SYSTEM AND BROUGHT BACK TO THE APPROPRIATE ELEVATION WITH CLEAN SAND PER MASSACHUSETTS 310 CMR 15.00 REGULATIONS. 11. THIS DESIGN DOES NOT ALLOW FOR THE USE OF A GARBAGE GRINDER 12. EXISTING CONDITIONS SURVEY PERFORMED BY PAUL E. SWEETSER, PLS ON OR AROUND JULY 2022. JUI. 2 8 2022 1 HEALTH DE -FT 11 F TE DESI Residential 101I' DINING KITCHEN I BATH I BEDROOM 4 CRESTVIEW DRIVE EAST SANDWICH, MA 02537 PHONE: (508) 400-2365 N. LLC Site Design and Permitting