HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out VAerea_e . 33 n e t V S
Street:
3 - kr. Commercial: Residential: lam.
Village: dr Floor Plan: I . # Bedrooms: 3
Owner: -..5aN _- lc ei&4 I Installer: i3 1 a
Address: - Phone:
Phone: /
Builder: Engineer: f,L Q Ler t% E^, V:r-v,..J M t ICI
Address: Phone:
Phone:
N/A YES I NO
1. Required#of copies received
l.//-
2.
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
-\./;
4. Foundation 2 ft above high point of road H.P.: End: Var.:
5. Water line 10 ft from septic components Var.: AA
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: I
9
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: I ---
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: IV'
13. q
Uses adjustment for maximum high groundwater Var.: \/..
14. Leaching set t 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A.B horizons) or 5' removal
16. Pro sosed contours are suitable
17. System meets slope requirements-nun. 1/8", !!"preferred
18. System meets breakout requirements PVC liner: Wall: f
19. Specified tee sizes are proper, gas baffle on outlet tee 1/;.--
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal
22. System adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dboxV i
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field ` /
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2" line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed t_J
29. Vent provided if leaching below 3 feet,under driveway/parking
�
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify - soils: wall: commercial: 1
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j __]
33. H-20 loading is subject to vehicular traffic, groundwater /
L/
34. Title V Application and permit fee, installer signatureC:
35. Foundation footing min. 2 feet above adjusted ground water for new house /
36. Deed Restriction required max. #bedrooms: max. flow: _ gpd `
37. Check area lots for groundwater/Label groundwater in Assessor's Map 1
Plan reviewed bv: „6+ C • c1 ,. .
e o:
J S /c L