Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 57 Lot if Zone of Contribution: In Out /Acreage , 0 8 Ac r r.s 3 12} Commercial:C 1 Commercial: Residential: Street: /, 0 t/€ Village: _ Floor Plan: 1/ # Bedrooms: 3 Owner: `Mar/ 6E1 X erg M.0N41ae^•' Installer: 6 Address: / Phone: Phone: Builder: Engineer: // g ,C GZ d rN Lii r-a N rv«ti�Q Address: _ Phone: Phone: N'A YES I NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table V 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: `�� 6. Benchmark indicated and shown-NGVD if near wetlands , _- 7. Septic tank minimum 10 ft from foundation, deck Var.: _ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: /Q F-C J✓ 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking we11/25 ft irrigation well Var.: _V ! 11. Tank/leaching minimum 10 ft from property line Var.: - 12. System meets all other setback requirements Var.: -I q � 13. Uses adjustment for maximum high groundwater Var.: . 'V/V � 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: _ 15. System not in top or subsoil (A,B horizons) or 5' removal 1 16. ro.osed contours are suitable - / 17. System meets slope requirements-min. 1/8", !4 "preferred 18. System meets breakout requirements PVC liner: Wall: i 1 19. Specified tee sizes are proper, gas baffle on outlet tee ✓20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox grad ✓ 24. Manhole covers within 6"of grade, pump chamber cover to grade `\ 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size -"__\,, 28. Septic tank/pump chamber to be factory waterproofed `l 29. Vent provided if leaching below 3 feet,under driveway/parking V 30. Buoyancy calculations for tank pump chamber 31. Engineer to inspect and certify soils: wall: commercial: I V 32. Engineer.'Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater _ 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house _ t/ 36. Deed Restriction required max. #bedrooms: max. flow: _ gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: , J, ;