Loading...
HomeMy WebLinkAboutCOC request August 18, 2022 C18543.00 Yarmouth Conservation Commission By Hand Delivery Attn: Brittany DiRienzo 1146 Route 28 South Yarmouth, MA 02664 Re: Certificate of Compliance Filing Package Proposed Site Development Mill Cove Associates 183 Route 28 West Yarmouth, MA Map 37, Parcel 72.1 DEP File NO: SE 83-487 OOC Book 4151, Book 79 Dear Ms. DiRienzo and Commission Members: On behalf of our client The Cove at Yarmouth Associates, we are submitting a Certificate of Compliance Filing Package. The following items are enclosed: • Yarmouth Conservation COC Administrative Checklist • WPA Form 8A – Request for a Certificate of Compliance • Engineer’s Statement of Compliance • Copy of $75.00 check made payable to Town of Yarmouth for filing fee Please schedule this for the September 1, 2022 public hearing. If you have any questions or require additional information, please give our office a call. Thank you. Sincerely, COASTAL ENGINEERING CO., INC. Carla A. Davis Enclosures: as stated cc: The Cove at Yarmouth Associates Limited Partnership Sean M. Riley, Project Manager Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • kgrant@yarmouth.ma.us Rev 8/2021 Administrative Checklist Certificate of Compliance General Information: All filings must be made on Town of Yarmouth forms. All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. Contact the Conservation Office if you need assistance. Submitting an Application: 1 complete original application, plan/sketch, and other supporting information to the Conservation Division - mailed to/dropped off at Town Hall. 1 complete pdf of application, plan/sketch, and other supporting information emailed to kgrant@yarmouth.ma.us. Statement from Engineer and/or stamped As-Built plan if required under the Order of Conditions to be included with both original and pdf application. Refer to 310 CMR 10.05(9)(d). Local filing fee. Refer to Fee Schedule. Make check payable to “Town of Yarmouth” and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Filing-Forms. CONSERVATION DIVISION X X X X wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE 83-487 Provided by DEP A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. This request is being made by: The Cove at Yarmouth Associates Limited Partnership Name 183 Route 28 Mailing Address West Yarmouth City/Town MA State 02673 Zip Code Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Mill Cove Assosciates Applicant June 8, 1984 Dated SE 83-487 DEP File Number Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 3. The project site is located at: 183 Route 28 Street Address West Yarmouth City/Town 37 Assessors Map/Plat Number 72.1 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Mill Cove Assosciates Property Owner (if different) Barnstable County 4151 Book 79 Page Certificate (if registered land) 5. This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE 83-487 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). August 18, 2022 C18543.00 Yarmouth Conservation Commission By Hand Delivery Attn: Brittany DiRienzo 1146 Route 28 South Yarmouth, MA 02664 Re: Statement of Compliance Proposed Site Development Mill Cove Associates 183 Route 28 West Yarmouth, MA Map 37, Parcel 72.1 DEP File NO: SE 83-487 OOC Book 4151, Book 79 Dear Ms. DiRienzo and Commission Members, We have reviewed the original plan submitted under the above referenced DEP File No. from May 18, 1984. Coastal Engineering Company (CEC) has conducted a site inspection of the referenced property and find the work to be in relatively substantial conformance with the plan, “Mill Creek Cove Site Plan”, Revised 5/18/1984 and Order of Conditions issued on June 8, 1984. An as-built plan showing current conditions as well as proposed restoration improvements (which are to be filed under a separate after-the-fact NOI application) has been provided. Therefore, on behalf of The Cove at Yarmouth Associates Limited Partnership, we respectfully request a Certificate of Compliance be issued for this project. Please contact me if you have any questions or require additional information. Sincerely, COASTAL ENGINEERING CO., INC. Sean M. Riley, P.E. cc: The Cove at Yarmouth Associates Limited Partnership