Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 39 Lot p2,4c6-- Zone of Contribution: In __ Out c.--- Acreage /0720o Commercial: Residential: r',-- Street: G Sc ,.,p 1/ Village: Floor Plan: 3_ � # Bedrooms: Owner: Installer: 5 9 /3 Address: _ Phone: Phone: Builder: Engineer: /7 8 S /,ti U i ro 10 w..<N4C-1 Address: Phone: Phone: • N/A YES I NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table - 4. Foundation 2 ft above high point of road H.P.: End: Var.: ✓ 5. Water line 10 ft from septic components Var.: ✓/ 6. Benchmark indicated and shown-NGVD if near wetlands V 7. Septic tank minimum 10 ft from foundation, deck Var.: i 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I - _ 9. Leaching minimum 100 ft from wetlands Var.:r. - Var.: _ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V I 11. Tank/leaching minimum 10 ft from property line Var.: I Via// 12. System meets all other setback requirements Var.: V 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons) or 5' removal 16. Pro.osed contours are suitable 17. System meets slope requirements-nun. 1/8", 1 preferred �J - 18. System meets breakout requirements PVC liner: _ Wall: I 19. Specified tee sizes are proper, gas baffle on outlet tee ,`// lF 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System adequately sized for its intended use I - 23. Minimum 6"stone or compacted below tank and dbox ✓/ I 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes V. 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size tf 2S. Septic tank/pump chamber to be factory waterproofed , j 29. Vent provided if leaching below 3 feet,under driveway/parking I - 30. Buoyancy calculations for tank/pump chamber - - 31. Engineer to inspect_and certify soils: wall: commercial: 7 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j 33. H-20 loading is subject to vehicular traffic, groundwater _ 34. Title V Application and permit fee, installer signature t� in 35. Foundation footing m . 2 feet above adjusted ground water for new house _ / 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map I Plan reviewed by: t It- /6 -a Z