Loading...
HomeMy WebLinkAboutDYIMS PE Site report 20220714 Architect: Perkins Eastman DPC Distribution: Commodore PMA Consultants Sandra Cashen Mark Grylls File ARCHITECT’S SITE OBSERVATION REPORT DATE OF VISIT: 07/14/2022 PROJECT: Dennis Yarmouth Intermediate Middle School 286 Station Avenue South Yarmouth, MA 02664 DATE OF ISSUE: 08/24/2022 PROJECT NO: 71011 WEATHER CONDITIONS: Sunny, clear, 80s ARCHITECT: Perkins Eastman, DPC 20 Ashburton Street 8th floor Boston, MA The purpose of the Site Observation Report is to record general observations of the work in progress at the time of the Architect’s visit. WORK IN PROGRESS: 1) Interior partition framing, drywall 2) Classroom casework installation 3) Painting and tile 4) Ceiling framing; ceiling installation 5) MEP/FP rough-in and finish work 6) Millwork installation 7) Interior CMU partitions 8) Curtain wall installation 9) Misc. Metals installation 10) GFRC panel and prep (girt/ insulation installation) 11) ACM panel as well as girt/insulation installation 12) Sun shade installation 13) Brick masonry 14) Site work FIELD OBSERVATIONS: PE visited the site on Thursday 07-14, to review ongoing progress. Interior Items 1. At the time of observation Cohn (tile subcontractor) was installing tile in the Area D stairwells (see photo p. 4), as well as wainscots in the corridors of Area C. 2. Bathroom tile installation and epoxy floor finish installation is complete at Area D; still in progress at Area C; 3. Interior millwork and casework installation is ongoing at Area D; Wright has just installed the chair rail at the Area D wainscot. 4. At Area D, Colony is substantially complete with drywall taping in the classroom corridors. 5. At the time of observation, the millwork installer was working on the Krion “portals” at D level 1 (see photo p. 4). 6. Ceiling installation by H. Carr is ongoing at Areas D and C. 7. Finish electrical work is ongoing at Areas D and C. 8. At Area C, Arden is in the process of installing the D-1 diffusers and radiant panels in the classrooms. 9. At Area C, Painting is ongoing, including at the science classrooms in the links; Colony is taping drywall on level 1; millwork and painting are ongoing;. 10. Colony has finished taping the GWB ceiling at the Area B “central commons.” 11. Lighthouse masonry is still installing the CMU for the MEP enclosures in the gymnasium, now about 60-70%; the CMU at the area A kitchen is complete, and United is currently in the process of installing the seismic clips. 12. For Area A, Overhead mechanical and sprinkler work are both ongoing at the auditorium, and MEP rough-in is ongoing at the music rooms. 13. O’Byrne is currently painting the above ceiling areas at the auditorium (Area A). REPORT BY: ABH Page 2 of 4 Exterior items: 1. Arden is installing the condenser units on the roof for the kitchen equipment. 2. PE reviewed and approved the CW back pan installation at the Area A curtain wall (curtain wall type C-1). 3. On 7-14 in the AM Marguerite poured about half the exterior door aprons, including those at the east sides of Areas B-C-D wings and at the NE of Area B. 4. Installation of window sun shades at area C is substantially complete. 5. Lymo (panel contractor) has installed blocking for the building signage on the south side of the gymnasium. 6. Lymo has commenced installing the ACM on the upper curving wall of the auditorium (Area A—see photo below). 7. At the time of observation, Lymo was also in the process of installing GFRC panels at the north side of the gymnasium and ACM at the NE corner, while prepping for GFRC at the East and south sides. 8. At the time of observation Lighthouse was at about 40% with the brick installation at the East and South-east façade of Area A (auditorium lobby area). Site work: 1. RBO has installed the Curbs and the binder course of pavement at the ring road around the building. 2. RBO is in the process of placing concrete at the C-D courtyard (see photo on page 3.) 3. Marguerite is setting the forms for drainage structures at the B-C courtyard. DISCREPANCIES, SPECIAL INSTRUCTIONS New items 7141. Edge detail at C-D stairs. In some cases there is an excessive gap between the stair stringer and the wall; PE asked CB to have United close with a thin 12 gauge plate welded to top of stringer (see photo p. 3). 7142. MAAB issue with Interior door frames. PE inventoried 13 instances of 3’ wide interior doors that conflict with MAAB 26.6.2 because the face of the door will be recessed 8” from the face of the frame (so that the MAAB clearance rectangle shown in 26.6.4 is not within 6” of the door, strictly speaking. Bulletin to follow. Prior items 7072. (from 07 07 site report) DD-1 diffusers. In some cases the DD-1 diffusers need to be plumbed so that they are orthogonal with the millwork at the window seats. still open 6301. (from 06 30 site report) Distortion in some panels of CW IGUs. CB, PE, and PMA are in discussion regarding the acceptability of this distortion. still open 6162. (from 06 16 site report) Detail at DD-1 diffusers. Update: this is being addressed--to be closed. 6163. (from 06 16 site report) Parapet ends at links. Still open 6091. (from 06 09 site report) mortar ‘spalling’ at locker room entrance door head. Update: this has been addressed--to be closed. 6305. (from 04 21 site report) Steel protrusion at auditorium. Still open. 1131. (From 01-13 site report): Guard rail welds at D & C stairs - United still needs to grind welds for the guards at academic stairs. Still open. Attachments · RJK Field Report 13 from 7-01 · RJK Field Report 14 from 7-08 · RJK Tracking Log from 7-08 SITE PHOTOS VIEW FROM SOUTH - WEST (AREA A) REPORT BY: ABH Page 3 of 4 COURYARD CONCRETE (AREA C-D) ACM PANEL INSTALLATION (GYM) COMPLETED SUN SHADES (AREA C) MAIN CENTRAL COMMONS (AREA B) CHAIR RAIL INSTALLATION (AREA D) GAP AT STAIR STRINGERS (AREA D) REPORT BY: ABH Page 4 of 4 STAIR TILE INSTALLATION (AREA D LEVEL 2) COMPLETED EPOXY FLOOR IN BATHROOM (AREA D LEVEL 1) KRION PORTAL INSTALLATION (AREA D LEVEL 1) FIELD REPORT RJK discussed the issues with CB and Beacon before leaving the site. Work Observed • Air and Vapor Barrier (AVB) Installation • Various Cladding Installation • Window Installation Observations • Part B, north and east elevations top of wall transition, second floor line, Grid Lines J.7 and B33 - GCP Perm-A-Barrier Aluminum AVB was installed by Beacon. The membrane was installed in a water shedding fashion lapping onto the through wall flashing. (Figure 1 and Figure 2) • Part A, south and east elevation rising walls, Grid Lines A15 and V - Exterior wall penetrations are detailed utilizing DOWSIL 795 Silicone Building Sealant. (Figure 3) • Part A, south and east elevations base detail, Grid Lines A15 and V -Hohmann & Bernard Thermal 2- Seal Wing Nut Anchors are installed through 2 inch extruded polystyrene insulation. Precast concrete bases were installed onto the foundation, supported by the masonry anchors. (Figure 4) • Part A, east and south elevations base detail, Grid Lines A15 - B11 - Solid grout fill was installed between precast concrete bases and extruded polystyrene insulation. (Figure 5) • Part A, west and east elevations base detail, Grid Lines A15 and A2 - Metal through-wall flashing was installed over the precast concrete base, set in Sika Sarnafil Sikaflex-1A polyurethane joint sealant prior to RJK’s arrival on site. The metal was fastened utilizing a termination bar and screws spaced at 16 inches on-center. The through-wall flashing was stripped in at the rising wall and at metal joints utilizing GCP Perm-A-Barrier Aluminum AVB and the edges are detailed with DOWSIL 795 Silicone Building Sealant. (Figure 6) • Part A, east elevation rising walls, Grid Line A15 - Hohmann & Bernard Thermal 2-Seal Wing Nut Anchors are installed through 6 inch ROCKWOOL insulation. (Figure 7) • Part A, east elevation rising walls, Grid Line A15 - Window flanges are stripped in utilizing self- adhered aluminum flashing in a water shedding fashion. Dow Sil 795 Sealant was applied to the membrane edges. (Figure 8) Project: Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number: FR-13 Property Address: 276 Station Avenue, South Yarmouth, MA 02664 Client: Perkins Eastman Date of Site Visit: Friday, July 1, 2022 Report Date: Thursday, July 7, 2022 Weather: Sunny 80 °F, 4 mph winds Purpose of Visit: Observe Building Enclosure Construction On-Site During Visit: Michael Groome - R. J. Kenney Associates, Inc. (RJK) Ken - Beacon Waterproofing and Restoration, Inc. (Beacon) Report By: Michael Groome Report Attachments: Detailed Photographs Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number: FR-13 7/7/2022 Report Narrative G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 2 of 11 • Part A, south elevation rising wall exterior window sealant joints, Grid Line W - Backer rod was installed without twist or dent and DOWSIL 795 Silicone Building Sealant was gun applied onto the backer rod. The sealant was then tooled in to complete the concave shape and promote adhesion to the frame and metal. (Figure 9) • Part B, west elevation courtyard rising wall, Grid Line B15 and east elevation rising wall, Grid Line B24 - Insulation was set between horizontal GreenGirt. (Figure 10) • Part B, west elevation courtyard rising wall, Grid Line B1 - LYMO 2000 ACM panels were installed, fastened utilizing panel clips to the horizontal GreenGirt. (Figure 11) • Part B, north, south, east and west elevation rising walls, Grid Lines B21, B24, B33, P.1 and J.7 - Knight MFI ThermaBracket S-Series wall ties were installed, wet set in GCP Perm-A-Barrier S100 Sealant, and fastened utilizing screws wet set in the sealant. (Figure 12) • Part B, north and east elevation rising walls, Grid Lines B21 and J.7 - S-rails were fastened vertically between the Knight MFI ThermaBracket S-Series wall ties. Insulation is set between the ties and held in place by friction and the rails. Horizontal galvanized hat channel is installed, fastened to vertical Knight S-Rails. (Figures 13 and 14) • Part B, east elevation rising wall, Grid Line B21 - Rieder Öko Skin high performance cementitious wall panels were installed and are fastened to the horizontal galvanized hat channel with screws. (Figure 15) • Part A, east elevation curtain wall systems, Grid Line B13 - Individual insulated glazing units are installed, temporarily fastened utilizing intermittent pressure plate sections. (Figures 16 and 17) Discussions 13.1 End Dams at Through Wall - Part B, East Elevation, Grid Line B33 - Top of brick through-wall flashing does not have end dams extending 2 inches high, per Specification 076200, 2.8, A. End dams to be added unless condition has been approved by the design team. (Figures 1 and 2) END OF REPORT RJK has no contractual responsibility in the design or actual construction of the project and is acting solely in a consultant and/or in an advisory capacity to the Client. Any and all modifications, changes, recommendations, suggestions, etc., relating to the design and/or construction, should be forwarded, reviewed, and approved by the designer of record prior to implementation. RJK reserves the right to change or amend this report as new information becomes available. Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 3 of 11 Callouts: 1. GCP Perm-A-Barrier Aluminum AVB 2. No End Dam Comments: 0701 109 R. J. Kenney Associates, Inc. Figure 1 ‐ Sheet-Applied AVB Over Through-Wall at Top of Brick Callouts: 1. No End Dam Comments: 0701 106 R. J. Kenney Associates, Inc. Figure 2 ‐ AVB Over Through-Wall at Top of Brick 1 2 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 4 of 11 Callouts: 1. DOWSIL 795 Silicone Building Sealant Comments: 0701 040 R. J. Kenney Associates, Inc. Figure 3 ‐ AVB Penetration Detailing Callouts: Comments: 0701 039 R. J. Kenney Associates, Inc. Figure 4 ‐ Precast Concrete Bases 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 5 of 11 Callouts: 1. Solid Fill Grout Comments: 0701 038 R. J. Kenney Associates, Inc. Figure 5 ‐ Solid Grout Fill at Precast Concrete Bases Callouts: 1. AVB Lapping Through- Wall Flashing 2. Flashing 3. Sika Sarnafil Sikaflex-1A Polyurethane Joint Sealant Comments: 0701 058 R. J. Kenney Associates, Inc. Figure 6 ‐ Stripped in Through-Wall Flashing 1 1 2 3 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 6 of 11 Callouts: 1. Hohmann & Bernard Thermal 2-Seal Wing Nut Anchor 2. 6 Inch ROCKWOOL Insulation Comments: 0701 025 R. J. Kenney Associates, Inc. Figure 7 ‐ Wall Insulation Callouts: Comments: 0701 046 R. J. Kenney Associates, Inc. Figure 8 ‐ Lentil Strip In 1 2 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 7 of 11 Callouts: 1. Sealant Knife Comments: 0701 050 R. J. Kenney Associates, Inc. Figure 9 ‐ Tooled in Sealant Callouts: Comments: 0701 021 R. J. Kenney Associates, Inc. Figure 10 ‐ Green Girt and Insulation 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 8 of 11 Callouts: Comments: 0701 073 R. J. Kenney Associates, Inc. Figure 11 ‐ LYMO 2000 ACM panels Callouts: Comments: 0701 121 R. J. Kenney Associates, Inc. Figure 12 ‐ Knight MFI ThermaBracket S-Series Wall Ties Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 9 of 11 Callouts: Comments: 0701 093 R. J. Kenney Associates, Inc. Figure 13 ‐ Wall Insulation at ThermaBracket Ties Callouts: Comments: 0701 123 R. J. Kenney Associates, Inc. Figure 14 ‐ Horizontal Hat Channel Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 10 of 11 Callouts: Comments: 0701 124 R. J. Kenney Associates, Inc. Figure 15 ‐ Rieder Öko Skin High Performance Cementitious Wall Panels Callouts: Comments: 0701 129 R. J. Kenney Associates, Inc. Figure 16 ‐ Curtain Wall IGU Installation Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-13 7/7/2022 Appendix A G:\RJK\WORD\32042 Q504 Mattacheese DYIMS Yarmouth FR13 Report 7-01-22.docx Page 11 of 11 Callouts: Comments: 0701 130 R. J. Kenney Associates, Inc. Figure 17 ‐ Temporary Clip Fastening FIELD REPORT RJK discussed the issues with CB and Beacon before leaving the site. Work Observed • Air and Vapor Barrier (AVB) Installation • Various Cladding Installation • Window Installation Observations • Part B, south elevation, second floor line, entrance canopy, Grid Lines A17 and B29 - GCP Perm-A- Barrier Aluminum AVB was installed by Beacon prior to RJK’s arrival on site. The membrane was installed in a water shedding fashion with sealant at the angle change. (Figure 1) • Part B, courtyard east elevation base detail, Grid Line B22 - Hohmann & Bernard Thermal 2-Seal Wing Nut Anchors are installed through 2 inch extruded polystyrene insulation. Precast concrete bases were installed onto the foundation, supported by the masonry anchors. Solid grout fill was installed between precast concrete bases and extruded polystyrene insulation. (Figure 2) • Part A, south elevations base detail, Grid Lines A18 and A19 - Metal drip flashing was installed over the precast concrete base at the radial wall, set in Sika Sarnafil Sikaflex-1A polyurethane joint sealant. The metal was fastened utilizing concrete anchors hammered into pre-drilled holes. (Figures 3 - 5) • Part A, south elevations base detail, Grid Lines A17 and A18 - Through-wall flashing was installed lapping onto the exterior wall and onto the drip flashing set in sealant. (Figure 6) • Part A, west elevation base detail, Grid Lines R - U - Through-wall flashing was stripped in at the rising wall and at metal joints utilizing GCP Perm-A-Barrier Aluminum AVB and the edges are detailed with DOWSIL 795 Silicone Building Sealant. (Figure 7) • Part A, north elevation rising walls, Grid Lines B4-B13 - Hohmann & Bernard Thermal 2-Seal Wing Nut Anchors are installed through 6 inch ROCKWOOL insulation. (Figure 8) • Part B, south elevation rising wall, Grid lines B10-B13, and Part A, south elevation rising wall, Grid Lines A1-A6 - GreenGirt was installed set in GCP Perm-A-Barrier S100 Sealant. (Figure 9) Project: Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number: FR-14 Property Address: 276 Station Avenue, South Yarmouth, MA 02664 Client: Perkins Eastman Date of Site Visit: Friday, July 8, 2022 Report Date: Monday, July 18, 2022 Weather: Sunny 74 °F Purpose of Visit: Observe Building Enclosure Construction On-Site During Visit: Michael Groome - R. J. Kenney Associates, Inc. (RJK) Ryan DiRico - Commodore Builders (CB) Ken - Beacon Waterproofing and Restoration, Inc. (Beacon) Report By: Michael Groome Report Attachments: Detailed Photographs Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number: FR-14 7/18/2022 Report Narrative G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 2 of 10 • Part A, south elevation rising wall, Grid Lines A1 - A6 - Insulation was set between horizontal GreenGirt. (Figure 10) • Part A, south elevation rising wall, Grid Lines A6-A12 - LYMO 2000 ACM panels were installed, fastened utilizing panel clips to the horizontal GreenGirt. (Figure 11) • Part B, east elevation and Part C, south elevation rising walls, Grid Lines B24, H - Backer rod and sealant were installed between the brick cladding and LYMO 2000 ACM panels prior to RJK’s arrival on site. (Figure 12) • Part B, east and north elevation rising walls, Grid Lines B33 and J.7 - Knight MFI ThermaBracket S- Series wall ties were installed, wet set in GCP Perm-A-Barrier S100 Sealant and fastened utilizing screws. (Figure 13) • Part B, east elevation rising wall, Grid Lines B33 - Z-metal is installed directly on the AVB membrane at the parapet due to the change in plane between block and gypsum per Ryan DiRico (CB). (Figure 14) • Part B, north and east elevation rising walls, Grid Lines B33 and J.7 - S-rails were fastened vertically between the Knight MFI ThermaBracket S-Series wall ties. Insulation is set between the ties and held in place by friction and the rails. Horizontal galvanized hat channel is installed, fastened to vertical Knight S-Rails. (Figure 15) • Part B, north elevation rising wall, Grid Line J.7 - Rieder Öko Skin high performance cementitious wall panels were installed and are fastened to the horizontal galvanized hat channel with color matched screws. (Figure 16) END OF REPORT RJK has no contractual responsibility in the design or actual construction of the project and is acting solely in a consultant and/or in an advisory capacity to the Client. Any and all modifications, changes, recommendations, suggestions, etc., relating to the design and/or construction, should be forwarded, reviewed, and approved by the designer of record prior to implementation. RJK reserves the right to change or amend this report as new information becomes available. Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 3 of 10 Callouts: 1. GCP Perm-A-Barrier Aluminum AVB Comments: 0708 033 R. J. Kenney Associates, Inc. Figure 1 ‐ Sheet-Applied AVB Over Parapet Wall Callouts: Comments: 0708 100 R. J. Kenney Associates, Inc. Figure 2 ‐ Precast Concrete Bases 1 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 4 of 10 Callouts: 1. AVB Lapping Through- Wall Flashing 2. Flashing 3. Sika Sarnafil Sikaflex-1A Polyurethane Joint Sealant Comments: 0708 022 R. J. Kenney Associates, Inc. Figure 3 ‐ Stripped in Through-Wall Flashing Callouts: Comments: 0708 027 R. J. Kenney Associates, Inc. Figure 4 ‐ Drip Flashing at Precast Concrete Bases 1 2 3 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 5 of 10 Callouts: Comments: 0708 045 R. J. Kenney Associates, Inc. Figure 5 ‐ Drip Metal Fastened Callouts: Comments: 0708 057 R. J. Kenney Associates, Inc. Figure 6 ‐ Through-Wall Flashing Over Drip Metal Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 6 of 10 Callouts: Comments: 0708 126 R. J. Kenney Associates, Inc. Figure 7 ‐ Through-Wall Flashing Stripped In Callouts: 1. Hohmann & Bernard Thermal 2-Seal Wing Nut Anchor 2. 6 Inch ROCKWOOL Insulation Comments: 0708 115 R. J. Kenney Associates, Inc. Figure 8 ‐ Wall Insulation 1 2 Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 7 of 10 Callouts: Comments: 0708 070 R. J. Kenney Associates, Inc. Figure 9 ‐ GreenGirt Installation Callouts: Comments: 0708 006 R. J. Kenney Associates, Inc. Figure 10 ‐ Insulation at GreenGirt Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 8 of 10 Callouts: Comments: 0708 004 R. J. Kenney Associates, Inc. Figure 11 ‐ LYMO 2000 ACM panels Callouts: Comments: 0708 090 R. J. Kenney Associates, Inc. Figure 12 ‐ Sealant Between Brick and Metal Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 9 of 10 Callouts: Comments: 0708 075 R. J. Kenney Associates, Inc. Figure 13 ‐ Knight MFI ThermaBracket S-Series Wall Ties Callouts: Comments: 0708 078 R. J. Kenney Associates, Inc. Figure 14 ‐ Variant Z-Metal at Substrate Transition Q504 - Mattacheese, Dennis-Yarmouth Intermediate Middle School Report Number FR-14 7/18/2022 Appendix A G:\RJK\WORD\32043 Q504 Mattacheese DYIMS Yarmouth FR14 Report 7-08-22.docx Page 10 of 10 Callouts: Comments: 0708 135 R. J. Kenney Associates, Inc. Figure 15 ‐ Wall Insulation at ThermaBracket Ties Callouts: Comments: 0708 134 R. J. Kenney Associates, Inc. Figure 16 ‐ Rieder Öko Skin High Performance Cementitious Wall Panels Building Envelope Field Report Tracking Log Q504 - Mattacheese DYMIS Yarmouth Tracking Log 7/08/2022 Item #Issue Location Contractors Response Owner's Project Rep RJK Comments Status 2.2 Insulation Offset Part D Roof 05/17/22: Photos of the correction will close the item. Open 2.3 Wetted Polyisocyanurate Insulation Part D Roof Open 2.4 Upside Down Insulation Part D Roof 05/17/22: Written approval from the manufacturer that the orientation is acceptable for the assembly will close the item, otherwise correction of installation methods. Open 3.4 Wet Polyisocyanurate Insulation and Cover Board Is Installed Part C 05/12/22: Testing will be necessary to confirm materials are dry and without organic growth. Open 3.5 Incomplete Night Tie-In Part C 05/17/22: Testing should be conducted at the location to ensure no moisture intrusion occurred at the incomplete tie in. Open 4.3 Interior Air Barrier Seal at Windows Part D 04/28/22: Please provide approved direction for the issue. Open 4.4 Window Fastening Part D 04/28/22: Please provide photos of sealant at fasteners. Open FR-1, 12/15/2021 FR-3, 12/28/2021 FR-2, 12/22/2021 FR-4, 1/6/2022 G:\RJK\WORD\32044 Q504 Mattacheese DYIMS Yarmouth FR Tracking Log 7-08-22 1 of 4 Building Envelope Field Report Tracking Log Q504 - Mattacheese DYMIS Yarmouth Tracking Log 7/08/2022 Item #Issue Location Contractors Response Owner's Project Rep RJK Comments Status 4.5 Wet Polyisocyanurate Insulation and Cover Board Is Installed Part C and Part D Roofs 05/12/22: Testing will be necessary to confirm materials are dry and without organic growth. Open 4.6 Pitch Pocket Detail Part C 04/28/22: No change.Open 4.7 Uncut Clamping Rings Part C 04/07/22: Multiple clamping rings still left uncut at Part C. 04/28/22: No change. Open 6.1 Voids in Damproofing From Damage Part D and Part C Open 6.3 Roof Debris Typical 04/28/22: Some large equipment is on plywood, although screws, pipes and other debris are still observed on the membrane. Open 6.4 Roof Ponding Part C to Part B 04/28/22: Additional ponding is observed at the west breezeway. 05/12/22: Ponding is continuously observed at both locations. Open 6.5 PVC In Contact with Asphalt Part B Penthouse 04/28/22: Membrane is still in contact, and through wall flashing is installed. 05/12/22: No change observed. Open FR-6, 4/7/2022 FR-5, 3/21/2022 FR-8, 5/12/2022 FR-7, 4/28/2022 No New Issues G:\RJK\WORD\32044 Q504 Mattacheese DYIMS Yarmouth FR Tracking Log 7-08-22 2 of 4 Building Envelope Field Report Tracking Log Q504 - Mattacheese DYMIS Yarmouth Tracking Log 7/08/2022 Item #Issue Location Contractors Response Owner's Project Rep RJK Comments Status 8.1 Missing AVB Part B, Level 1 Rising Wall to Parapet Transition 06/10/22: AVB membrane and sealant was installed. Closed 8.2 Discontinued AVB at Curtain Wall Column Part B, East Elevation Rising Wall, Grid Lines M.9-L Open 8.3 Missing Insulation Behind Brick Part B, North Elevation Rising Wall, Grid Lines B32 06/10/22: Insulation was observed at the location. Closed 8.4 Roof Discontinuation Between Vapor Barrier and PVC Membrane Part B, Gymnasium Roof, Grid Lines B24 - B25 Open 10.1 AVB Above Brick Cladding Part B, Gridlines A17-A22, P.7 06/16/22: The steel was cleaned and air barrier applied. Closed FR-12, 6/21/2022 No New Issues FR-11, 6/16/2022 FR-13, 7/1/2022 FR-9, 5/17/2022 No New Issues FR-10, 6/10/2022 No New Issues G:\RJK\WORD\32044 Q504 Mattacheese DYIMS Yarmouth FR Tracking Log 7-08-22 3 of 4 Building Envelope Field Report Tracking Log Q504 - Mattacheese DYMIS Yarmouth Tracking Log 7/08/2022 Item #Issue Location Contractors Response Owner's Project Rep RJK Comments Status 13.1 End Dams at Through-Wall Part B, East Elevation, Grid Line B33 Open No New Issues FR-14, 7/8/2022 G:\RJK\WORD\32044 Q504 Mattacheese DYIMS Yarmouth FR Tracking Log 7-08-22 4 of 4