Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. / Lot oO Zone of Contribution: In_ Out Acreage /o 'JAT� J , Commercial: _ Residential: 4 �r Street: J 1 Ak r44: A.,' Av -4- Village: Floor Plan: ' 1 -_ V # Bedrooms: Owner: Installer: cOz,few 474sC' Address: Phone: Phone: - - Builder: Engineer: Mc`,.e I- f ._caw_ . Address: _ Phone: Phone: N/A YES NO 1 1. Required# of copies received 2. Date of soils exam and percolation test not older than 2 years I 3. 4-5 ft of naturally occurring pervious material, above water table - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: _ . 5. Water line 10 ft from septic components Var.: _ 6. Benchmark indicated and shown-NGVD if near wetlands / 7. Septic tank minimum 10 ft from foundation, deck Var.: t/ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab 'Var.: [ \/ 9. Leaching minimum 100 ft from wetlands Var.: � 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well _ Var.: L 11. Tank/leaching minimum 10 ft from property line Var.: 1 r/ 12. System meets all other setback requirements Var.: q 13. Uses adjustment for maximum high groundwater Var.: • 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ‘,/"- --. 15. System not in top or subsoil (A,B horizons) or 5' removal t..-- 16. Pro.osed contours are suitable mss- 17. System meets slope requirements-nun. 1/8", !4"preferred f/ 18. System meets breakout requirements PVC liner: Wall: f i/ 19. Specified tee sizes are proper, gas baffle on outlet tee , // V/ 20. Sewage is under 10,000 gpd for parcel - 21. No garbage disposal c-, 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox - - j 24. Manhole covers within 6"of grade, pump chamber cover to grade ' L - / 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 7 27. Pump system-2" line,weep hole,check valve, tee in dbox, pump size 28. Se tic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 1,7. 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and Certify soils: wall: commercial: 1 V 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j V 33. H-20 loading is subject to vehicular traffic, groundwater / 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house . 36. Deed Restriction required max. #bedrooms: max. flow: gpd 1 /. 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by:74 - -- 8-? '. --•2 e `; ....., � Z