Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 1 , �i Lot Zone of Contribution: In Out / Acreage 46 f!� Commercial: Residential: Street: 807 j 017Ek Der- s Village: Floor Plan: #Bedrooms: 3 Owner: a'ea .'- 1\1_04/__ - Installer: A24, S /3 r-O Address: Phone: Phone: Builder: Engineer: \(\( ,q S 0" Phone: Address: ` Q.�G Phone: N/A YE\>7. NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years ,,d 3.4-5 ft of naturally occurring pervious material,above water table ✓ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: / ft 8.Leaching minimum 20 ft full, 15 ft crawl, 10 slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: / 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 577 11.Tank/leaching minimum 10 ft from property line Var.: V 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: /� l 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: V 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred Var. I'_18. System meets breakout requirements PVC liner: ll r� 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel v 21.No garbage disposal V.� / 22. System adequately sized for its intended use ._ I 23.Minimum 6"stone or compacted below tank and dbox ✓ 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes 12V 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed V/ 29. Vent provided if leaching below 3 feet,under driveway/parking ✓/ 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 1/: 34.Title V Application and permit fee,installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house / 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: .� .r. 1 e -i0 - 16 03 03 2