Loading...
HomeMy WebLinkAboutEngineer PlanTEST HOLE LOGS 1) Them Alla hall fompiy with the State Environmental Code Title V and Town of �. ASSESSORS MAP: ? i Board of Health Regulations. G 2 The septic tic s stem as proposed a ed a this plan shall not be installed until aficensed town PARCEL. f SOIL EVALUATOR: 1 I �j t ' `�Q" " installer receives approval and an installation permit from the applicable town. REFERENCE: 1 0 WITNESS: 'a" Y ,`^ 1 ` 3) Prior to installation, the installer shall verify the location of utilities, sewer inverts, AUKt�� sewer lines and existing septic components prior to installation. J rC� /U GATE' �L}l+ 21 4) All gravity sewer piping is to be 4 inch schedule 40 PVC at 1/8" per foot. The first 2 t 1 feet out of the distribution box shall be level. All piping connections to be glued. 1; IV Jir' Z PERCOLATION RATE: - h) t P'P' g y, 5) This septic design plan is not to be utilized for property line determination or for any T.H11 ELEV. v T.H.#2 ELEV. other purpose other than the proposed septic system installation. LOCATION MAFi M1 .r v; , 5) All Title V components are to meet Title V specifications. ,` ,- fin ,1 - / 7) Parking shall be prohibited over Title V components unless components are H2O d? 11 T�%_-,-_. ------ Y► loaded. ¢®� ,22,0 1 8) The existing leaching or cesspools shall be pumped and filled with material per Title V V6�� _Fft �t k"t f - AP) )Q abandonment procedures. Leaching and cesspool(s) and contaminated soils within t.e.. .._ ---- b r`F,�Iq the proposed SAS shall be removed and replaced with clean sand per Title V I specifications. 9) Septic components are to be 30' from a water service line. Sewer lines crossing a t7-drwater line shall be sleeved with an appropriately sized schedule 40 PVC with ends outed. The water service line or the septic line can be sleeved with the sleeve being g P a g 3� a distance of 10' on bath sides of crossing the line. t D ` 0 ' ► y� 10) if a garbage grinder exists in the structure, it is to be removed if the septic system is G Iw �I 1•.. .. - Z Z?- __ _ . e 1 t i designed o accommodate a garbage grinder. Z--'-� -- 11) The installer is responsible for care of excavation around all utilities on the property and protecting the structural integrity of all structures during the installation process ' SEPTIC SYSTEM DESIGN CALCULATIONS P g g of the septic system. FLOW ESTIMATE: 12) This plan only represents that a septic system can be installed on the property -7 \ � BEDROOMS AT GAL/DAY/BDRM = GAL/DAY meeting Title V requirements. 13 t (�/ � t>nl� -� ) The property owner shall review design criteria to approve the total number of . _ SEPTIC TANK: bedrooms and design flow. Installation of the septic system as proposed and receipt / of payment for the design pp g /)w�i)�f lrn�C� I f o I GAL/DAY BDRMX'2 DAYS = � GALLONS P Y gn shall be deemed approval of the design criteria by the ( 1 I property owner or agent of. 4 A Ta 0 S USE GALLON SEPTIC NK . �Q.-E I � I INiS 14) The validity of this plan shall expire with the expiration of the town installation permit - i 1 I 1 ' I (GARBAGE GRINDER IS PROHIBITED} issued for this plan or the validity of this plan shall expire on the expiration of the I-- 1 Certificate of Compliance issued for the -installation of the proposed system on this I►" --- _ SOIL ABSORPTION SYSTEM: / plan. -F, SWI x 1� to SIDEWALL AREA: - I./C77` �s�%L,/G ) } ,1 Q / l�s BOTTOM AREA: Permit valid for REPAIR <7F SEP'rIC.SYSTEM ONLY, due to. State and Local septic variances. J a•/�D[") % Board of Health review and atipros al is required for h� any future additions/renovatio, slit iterations to \0 sewage facilities and/or structures/dwrihog. _. Yartnoulli Health IDcpsuanent �, SEPTIC SYSTEM SECTION IU11-,I BENCHMARK Name { ' ITOP OF FOUNDATION it)All ►I �- - !°� $ r.Y srrw b, L......._ o - YY ELEV. n t 1 �tt , 1161,3 �� 1 H 1 j l Er j V j (DATUM ASSUMED) �� 1sjCf� � �'�---.' s STONE SASE L� --------- ELEV. H2O D -BOX �-------Z5 X i I G" STONE BASE OR COMPACTED BASE WATER TEST FOR LEVELNESS GALLONS �Z �g LIC) SEPTIC TANK AUG 2$202? SITE AND SEWAGE PLAN y I `� '4 HEALTH DEPT S o`�� DAVID y LOCATION: LOCATION: Icy) PREPARED: ( C SCALE: l'� - DATE:®