Loading...
HomeMy WebLinkAbout4984 2 Buttercup Ln Proposed Sewage Disposal System 06.30.22Existing Dwelling to be Razed EXISTING FLOOR PLAN NOT TO SCALE BENCHMARK Top of Foundation EL=18.3 (NAVD Datum)ExistingGravel DriveSITE PLAN SCALE: 1" = 20' S T D B S A S 8.5' 2.5'2.5'4.83'2.5'9.83'Stone Chambers D-Box SYSTEM DESIGN CALCULATIONS SEWAGE DESIGN FLOW REQUIRED:2 BDRM DWELLING + 1 FUTURE BDRM @ 110 GPD / BDRM = 330 GPD REQUIRED SEWAGE DESIGN FLOW PROVIDED: THREE (3) 500 GALLON LEACH CHAMBERS WITH 2.5' OF STONE ALL AROUND Vt = [(30.5 x 9.83) + 2(30.5 + 9.83) x 2] x .74 = 341.2 GPD PROVIDED 341 GPD PROVIDED > 330 GPD REQUIRED SEPTIC TANK CAPACITY REQUIRED:330 GPD X 200% = 660 GPD REQUIRED SEPTIC TANK CAPACITY PROVIDED:1500 GALLON PROVIDED (MINIMUM ALLOWED) A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW 0 20 40 SCALE 1"=20' 60 SITE LOCUS NOT TO SCALE Yarmouth, MA Existing Septic Components to be Removed (See Note #22) Test Hole #1 (EL=17.3±) Depth 0"-8" 8"-28" 28"-120" Layer A B C1 Soil Class Loamy Sand Loamy Sand Fine-Medium Sand Soil Color 10YR 3/4 10YR 6/8 10YR 8/2 Comments Perc @ 56" TEST HOLE LOGS C:\CSN\SDS-Buttercup\SDS-Buttercup-SDS Plan.dwg Variances: 310 CMR 15.211 Min. Setback Distances: 1.) Septic Tank not 10' from Property line 3' Held 7' Variance Requested 2.) SAS not 10' from SW property line 2' Held 8' Variance Requested 3.) SAS not 10' from SE property line 4' Held 6' Variance Requested 4.) SAS not 10' from Slab Foundation 7' Held 3' Variance Requested Variances: 310 CMR 15.248 Reserve Area: 5.) No Reserve Area Remove and Replace Requested Town of Yarmouth Regulation 3.7 6.) SAS not 100' from Edge of Wetland 94' Held 6' Variance Requested VARIANCES REQUESTED Pl Bk 79 Pg 101Notes: 1.) Assessor's Map 119 Parcel 33 2.) Deed Book 34104 Page 157 3.) Plan Book 79 Page 101 4.) This property is not in a Zone II of a Public Water Supply 5.) Flood Zone: AE(9), X Community Panel: 25001C0583J Dated: 07/16/14 6.) Zoning: R-40 Old Kings Highway Dist., 25% Building Coverage 7.) Prior to final inspection by the engineer, system needs to be complete including buildup for covers. CONSERVATION NOTES: 1.) LIMIT OF WORK SHALL BE AS SHOWN. A ROW OF DOUBLE STAKED HAYBALES SHALL BE CONSTRUCTED ALONG THE LIMIT OF WORK LINE PRIOR TO THE COMMENCEMENT OF ANY WORK. 2.) ALL DISTURBED AREAS SHALL BE LANDSCAPED. PLANTINGS SHALL INCLUDE A MIXTURE OF INDIGENOUS SHRUBS AND GROUNDCOVER FROM THE APPROVED PLANT LIST. 3.) CONTRACTOR, BUILDER, AND OWNER SHALL REVIEW THE ORDER OF CONDITIONS PRIOR TO AND DURING CONSTRUCTION. O U ST DB SAS 24x5 12.3 EXISTING SPOT GRADE PROPOSED SPOT GRADE EXISTING CONTOUR PROPOSED CONTOUR WATER SERVICE LINE OVERHEAD UTILITY LINES UNDERGROUND UTILITY LINES GAS SERVICE LINE EDGE OF CLEARING LIMIT OF WORK TEST HOLE LOCATION SEPTIC TANK DISTRIBUTION BOX SOIL ABSORPTION SYSTEM WATER METER LEGEND 24 24 Prepared for: 2 Buttercup Realty Trust DATE: JOB NO: SCALE:CHECK: DESIGN: 02/11/2022 AS SHOWN Proposed Sewage Disposal System 2 Buttercup Ln., South Yarmouth, MA LJC DCB 2021315 CONSTRUCTION NOTES 1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000): AND THE REGULATIONS OF THE LOCAL BOARD OF HEALTH. 2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20 LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE. 3.) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS SHALL BE INSTALLED ON A STABLE MECHANICALLY-COMPACTED BASE ON SIX INCHES OF CRUSHED STONE. 4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE. LEACHING FIELDS, TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE. 5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK, AND NOT LESS THAN 1% OTHERWISE. 6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40 PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT. UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED AT END OR AS NOTED. 7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO ASSURE EVEN DISTRIBUTION. 8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES IN ORDER TO PROVIDE A WATERTIGHT SEAL. 9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM. 10.) IN ACCORDANCE WITH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE. 11.) THERE ARE NO OTHER KNOWN WELLS WITHIN 100' OF THE PROPOSED SOIL ABSORPTION SYSTEM. 12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM. 13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE DESIGNER. 14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT AND THE APPROVED PLANS. 48 HOURS ADVANCE NOTICE IS REQUESTED. 15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT. 16.) CONTRACTOR SHALL VERIFY THAT ALL WASTELINES ARE CONNECTED BY WATER TESTING WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS. 17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY SEPTIC SYSTEM COMPONENTS. 18.) INSTRUMENT SURVEY CONDUCTED FOR PROPOSED WORK ONLY. SITE PLAN SHALL NOT BE USED FOR STAKING, OR ANY OTHER PURPOSES. NOR SHALL IT BE USED AS A MORTGAGE PLOT PLAN OR TITLE SURVEY. CONFORMANCE TO LOCAL BYLAWS SHALL BE DETERMINED BY THE OWNER PRIOR TO CONSTRUCTION. 19.) THIS PLAN DOES NOT CERTIFY, GUARANTEE OR WARRANTY COMPLIANCE WITH DEEDED OR ZONING BYLAWS, SPECIFICALLY, BUT NOT LIMITED TO, SIDELINE SETBACKS AND BUILDING HEIGHT RESTRICTIONS. OWNER IS RESPONSIBLE FOR OBTAINING SUCH A DETERMINATION FROM THE APPROPRIATE AUTHORITY. 20.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS. 21.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND ABANDONED IN PLACE. AREA TO BE COMPACTED TO MINIMIZE SETTLING. 22.) EXISTING SEPTIC COMPONENTS TO BE REMOVED. ANY CONTAMINATED SOIL SHALL BE REMOVED FOR A DISTANCE OF FIVE (5) FEET LATERALLY FROM THE SOIL ABSORPTION SYSTEM AND REPLACED WITH CLEAN SAND. AREA TO BE COMPACTED TO MINIMIZE SETTLING. 23.) INSTALL A 40 mil HDPE LINER FROM EL=15.0± TO EL=11.0± AS SHOWN ON PLAN (SEE PLAN VIEW). SURVEY BY: DATE OF TESTING: 11/29/2021 SOIL EVALUATOR: D. BENNETT, R.S., S.E. BOARD OF HEALTH AGENT:CAROL EASTMAN, BARN. CNTY HEALTH DEPT PERCOLATION RATE: LESS THAN 2 MIN/INCH IN "C" LAYER NO GROUNDWATER ENCOUNTERED PLAN VIEW SCALE: 1" = 10' N 4 7 ° 3 0 ' 5 0 " W 8 2 . 2 0 E d g e o f P a v e m e n t B U T T E R C U P L A N E Dec k H O U S E # 6 C O A S T A L B A N K F L O O D Z O N E " A E " ( 9 ) F L O O D Z O N E " X " C O A S T A L B A N K P.O. Box 201 Brewster, MA 02631 Phone: (508) 896-1783 CSN ENGINEERING Bdrm Bdrm Bth Kitchen Living Test Hole #2 (EL=17.5±) Depth 0"-8" 8"-26" 26"-108" Layer A B C1 Soil Class Loamy Sand Loamy Sand Fine-Medium Sand Soil Color 10YR 3/4 10YR 6/8 10YR 8/2 Comments Perc @ 52" Test Hole #3 (EL=17.2±) Depth 0"-10" 10"-28" 28"-120" Layer A B C1 Soil Class Loamy Sand Loamy Sand Fine-Medium Sand Soil Color 10YR 3/4 10YR 6/8 10YR 8/2 Comments Test Hole #4 (EL=16.3±) Depth 0"-10" 10"-24" 24"-120" Layer A B C1 Soil Class Loamy Sand Loamy Sand Fine-Medium Sand Soil Color 10YR 3/4 10YR 6/8 10YR 8/2 Comments 3 4 . 2 ' 19 . 1 ' 18 . 0 '14.3'27.6' TOP OF FOUNDATION 48"14.7515.00 15.8± 16.2± 14.30 14.00 15.0± 12.00 16.00 2'1500 GALLON (H-20 Rated) SEPTIC TANK DB-3 (H-20 Rated) D-BOX THREE (3) SHOREY PRECAST 500 GALLON LEACH CHAMBERS WITH 4' OF STONE ALL AROUND (H-20 Rated) LEACH CHAMBERS10"14"14.47 GEOTEXTILE FABRIC 3/4" - 1-1/2" STONE 5.7'± EL=6.3± (Bottom of Test Hole) 3'FLOW PROFILE NOT TO SCALE 15'19' Longest Run 12' EL=18.3± EL=17.1±EL=17.2±EL=17.2± 24" DIAMETER CONCRETE COVERS RAISED TO WITHIN 6" OF FINISH GRADE (OR AS NOTED) GAS BAFFLE 9"min - 36" max(IN PLACE OF 1/4"-1/2" PEASTONE)2"3"12. 1 ' 10' m i n 20'min3.2'2'SAS 8.5'8.5' 2.5' Relocate Water Service Line 30.5' 4" PVC VENT 36"MIN & CAP BY "SWEETAIR" Vent Vent E D G E O F S A L T M A R S H W12.6'10'min10'min 1 0 " M a i n REVISION 03/02/2022: Added Riverfront Designation, abutting SAS & Water, Relocated SAS, Revised Slab Foundation area, variance requests. Existing SAS ( R I V E R F R O N T A R E A ) 100' from Riverfront 100' from Coastal Bank 5 0 . 8 ' 4' 21.3'94.0'11.0' 10 ' m i n W 12 . 8 ' W REVISION 06/30/2022: Revised Dwelling 11 . 0 ' Masonry Steps 2 n d S t o r y ( T y p . ) 5 0 ' F R O M F u l l F o u n d a t i o n Sl a b F o u n d a t i o n P r o p o s e d 3 B d r m D w e l l i n g T o p o f F n d n E L = 1 8 . 3 ±10.4'10'min7.6'2 2 . 7 '18.4'18.3'19.5'>2 0 ' f r o m S A S