HomeMy WebLinkAboutC5 Details_NotesROADWAY PAVEMENT SECTION:
LU
z_
J
W
v�
2' (MIN.
1�P�S�Oe
3 GAS MAIN
CABLE/ELECTRIC LINES -
9 1/2" DENSE GRADE CRUSHED STONE BASE ((2) 4 3/4" LIFTS)*
(MIN) 4" CLEAN SAND (SUB -BASE)
ALL ROADWAY FILL SHALL BE CLEAN SAND PLACED IN
(MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS
DETERMINED BY THE MODIFIED PROCTOR TEST
(*SEE BELOW NOTES FOR SPECIFICATIONS ON ROAD CONSTRUCTION
WITHIN ROUTE 6A STATE HIGHWAY LAYOUT)
STATE HIGHWAY LAYOUT PAVEMENT NOTES:
• PROPOSED ROADWAY (WITHIN SHLO) SHALL HAVE AN 8" GRAVEL BASE THAT HAS BEEN MACHINE
COMPACTED THEN PAVED WITH 4" OF HOT MIX ASPHALT (HMA) LAID IN TWO COURSES CONSISTING
OF A 2-1/2" BINDER COURSE AND A 1-1/2" FINISH COURSE.
• ANY EXISTING HMA BERM THAT EXISTS WITHIN THE PROPOSED DRIVEWAY MUST BE SAWCUT AND
REMOVED. THE NEW PAVEMENT MUST TIE INTO, AND NOT OVERLAP, THE EDGE OF THE HARDENED
SURFACE OF THE ROADWAY. ALL ABUTTING EDGES OF THE EXISTING PAVEMENT SHALL BE COATED
WITH A HOT POURED JOINT SEALER IMMEDIATELY PRIOR TO THE PLACEMENT OF THE HMA.
M1 DRAINAGE FACILITY SECTION:
NOT TO SCALE
erm
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
12" DIAM. HDPE @ 1% PITCH
in
4'
9 ,
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
24" Diam. Cast Iron Frame and Cover
- Raised to Grade
Use EJIW LK 110A or Equal
Berm
4'
Solid 4' Dia.
Manhole
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
M2 DRAINAGE FACILITY SECTION:
NOT TO SCALE
erm
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
�� If
12" DIAM. HDPE @ 1% PITCH
rn
irl
4'
4 . ,
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
12" DIAM. HDPE @ 1% PITCH
30'±
24" Diam. Cast Iron Frame and Cover
Raised to Grade
Use EJIW LK 110A or Equal
Berm
RIM=38.6±
LU
z_
J
W
TYPICAL WOODEN GUARDRAIL
t�N C1\11)
4" TOPSOIL
8" WATER MAIN
DRIVEWAY PAVEMENT SECTION:
NOT TO SCALE
REQUIRED ACTACESS PRUNING ZONE
(12' LL X-1 4'WIDE?
10' (ACCESS)
2, 20' (PARKING) 2' Q�l`�o
Seo
1/4" PFR FOOT PITCH Lti.
1" FINISH COVER (ROLLED)
1.5" BINDER COURSE (ROLLED)
4" DENSE GRADE CRUSHED STONE BASE (14' WIDE)
(MIN) 4" CLEAN SAND (SUB -BASE)
ALL DRIVEWAY FILL SHALL BE CLEAN SAND PLACED IN
(MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS
DETERMINED BY THE MODIFIED PROCTOR TEST
HOT MIX ASPHALT NOTES:
• ALL HOT MIX ASPHALT (HMA) PAVEMENT SHALL BE
CONSTRUCTED PER MASSDOT'S 2021 STANDARDS AND
SPECIFICATIONS FOR HIGHWAYS AND BRIDGES,
SUBSECTION 460: HOT MIX ASPHALT PAVEMENT FOR LOCAL
STREETS.
• EACH HMA PAVEMENT COURSE SHALL BE COMPRISED
OF ONE OF THE MIXTURE TYPES LISTED ON TABLE 460.10-1,
SUBSECTION 460.
M2 Dry
Water Quality Swale
SEE SWALE NOTES
RIM=50.0± 1
BOTTOM=48.5±
RIP -RAP SPLASH PAD
SEE RIP -RAP DETAIL
12" DIAM. HDPE @ 1% PITCH
30'±
4'
4 . ,
Solid 4' Dia.
Manhole
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
M1 STORMWATER LEACHING FACILITY:
SCALE: 1"=20'
M2 STORMWATER LEACHING FACILITY:
SCALE: 1"=20'
WOODEN GUARDRAIL SECTION:
NOT TO SCALE
00 3x9 Wood Railing 00
4' m
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
1`I8" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
M2 Dry
Water Quality Swale
SEE SWALE NOTES
RIM=
34.5±
BOTTOM=33.0±
RIP -RAP SPLASH PAD
SEE RIP -RAP DETAIL
24" Diam. Cast Iron Frame and Cover
Raised to Grade (ALL 5 UNITS)
Use EJIW LK 110A or Equal
EXISTING GRADE
- -
6
- -
E
' O.C.
,
66, O.C.
4' m
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
1`I8" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
M2 Dry
Water Quality Swale
SEE SWALE NOTES
RIM=
34.5±
BOTTOM=33.0±
RIP -RAP SPLASH PAD
SEE RIP -RAP DETAIL
24" Diam. Cast Iron Frame and Cover
Raised to Grade (ALL 5 UNITS)
Use EJIW LK 110A or Equal
1000 Gallon
Leaching Pit (6'x6'0)
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
28' x 14' x 6' Leaching Facility:
(2) Pits, spaced 14' on center with stone
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
18" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH
-_
Ln - -
4'
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
DRIVEWAY NOTES:
• IN ORDER TO ALLOW SAFETY VEHICLE ACCESS TO
DRIVEWAYS, ALL DRIVEWAYS SHALL BE 10' WIDE WITH 2'
GRASSED SHOULDERS ON EACH SIDE (2% MAX. GRADE).
• GRASSED SHOULDERS SHALL BE UNDERLAIN WITH
CRUSHED STONE BASE, AS SHOWN, TO PROVIDE
ADDITIONAL SLOPE STABILITY FOR SAFETY VEHICLE ACCESS.
• VEGETATION SHALL BE PRUNED TO ALLOW A 14' WIDE,
12' TALL ACCESS WAY.
STORMWATER POLLUTION PREVENTION PLAN:
PRIOR TO CONSTRUCTION, A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL BE PREPARED AND
SUBMITTED ALONG WITH THE ACCOMPANYING NOTICE OF INTENT TO THE UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY. THE SWPPP WILL CONTAIN ALL SPECIFICATIONS AND REQUIREMENTS FOR STORMWATER AND
EROSION CONTROL PROTOCOL DURING THE CONSTRUCTION PHASE. CONTRACTOR SHALL REVIEW THE SWPPP PLAN IN
DETAIL IN ADDITION TO THESE PLANS AND DETAILS PRIOR TO START OF CONSTRUCTION.
24" Diam. Cast Iron Frame and Cover
Raised to Grade (ALL 5 UNITS)
Use EJIW LK 110A or Equal
6
- -
6
- -
1000 Gallon
Leaching Pit (6'x6'0)
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
28' x 14' x 6' Leaching Facility:
(2) Pits, spaced 14' on center with stone
24"x24" Cast Iron Frame and Grate
Raised to Grade
Use EJIW LF248-2 OR EQUAL
18" MAX. WATER DEPTH
12" DIAM. HDPE @ 1% PITCH
-_
Ln - -
4'
Solid 4' Dia.
Catch Basin
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
DRIVEWAY NOTES:
• IN ORDER TO ALLOW SAFETY VEHICLE ACCESS TO
DRIVEWAYS, ALL DRIVEWAYS SHALL BE 10' WIDE WITH 2'
GRASSED SHOULDERS ON EACH SIDE (2% MAX. GRADE).
• GRASSED SHOULDERS SHALL BE UNDERLAIN WITH
CRUSHED STONE BASE, AS SHOWN, TO PROVIDE
ADDITIONAL SLOPE STABILITY FOR SAFETY VEHICLE ACCESS.
• VEGETATION SHALL BE PRUNED TO ALLOW A 14' WIDE,
12' TALL ACCESS WAY.
STORMWATER POLLUTION PREVENTION PLAN:
PRIOR TO CONSTRUCTION, A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) WILL BE PREPARED AND
SUBMITTED ALONG WITH THE ACCOMPANYING NOTICE OF INTENT TO THE UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY. THE SWPPP WILL CONTAIN ALL SPECIFICATIONS AND REQUIREMENTS FOR STORMWATER AND
EROSION CONTROL PROTOCOL DURING THE CONSTRUCTION PHASE. CONTRACTOR SHALL REVIEW THE SWPPP PLAN IN
DETAIL IN ADDITION TO THESE PLANS AND DETAILS PRIOR TO START OF CONSTRUCTION.
24" Diam. Cast Iron Frame and Cover
Raised to Grade (ALL 5 UNITS)
Use EJIW LK 110A or Equal
1000 Gallon
Leaching Pit (6'x6'6)
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
70' x 28' x 6' Leaching Facility:
(10) Pits, spaced 14' on center with stone
TYPICAL CATCH BASIN & MANHOLE SECTION
NOT TO SCALE
PIPE CONNECTIONS TO
Solid 4' Dia. Solid 4' Dia. Solid 4' Dia.
Catch Basin Manhole Catch Basin
USE H-20 USE H-20 USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL
NOTE:
ALL MANHOLE RIM AND INVERT ELEVATIONS ARE CALLED
OUT ON THE C4- GRADING & DRAINAGE PLAN.
DRAINAGE CONSTRUCTION NOTES:
1.) ALL COMPONENTS, SUBJECT TO WHEEL LOADS, SHALL BE RATED H-20.
2.) ALL WORKMANSHIP PROVIDED SHALL BE IN CONFORMANCE WITH THE TOWN OF YARMOUTH
PLANNING BOARD & ENGINEERING SPECIFICATIONS.
3.) ANY MODIFICATIONS AND/OR DEVIATIONS FROM THE PLANS SHALL BE REVIEWED AND
APPROVED BY THE ENGINEERING DEPARTMENT.
CATCH BASIN AND LEACHING NOTES:
1.) ALL PROPOSED CATCH BASINS, LEACHING GALLERIES, AND TRENCHING ACROSS PARKING AREAS AND
SIDEWALKS SHALL BE BACKFILLED, AND COMPACTED IN 6 -INCH LIFTS. COMPACTION SHALL MEET 95%
STANDARD PROCTOR REQUIREMENTS. ALL BACKFILL MATERIAL SHALL BE DENSE GRADED CRUSHED
STONE WITH A MAX SIZE OF 3/4" OR ENGINEERED APPROVED EQUAL.
2.) THE LEACHING CHAMBERS SHALL BE SET FULLY INTO CLEAN SAND. DESIGN ENGINEER SHALL INSPECT
THE SOILS AROUND AND BELOW THE LEACHING FACILITY PRIOR TO FACILITY INSTALLATION.
3.) ALL CAST IRON FRAMES AND SEALS FOR DRAINAGE COMPONENTS SHALL BE FINISHED WITH MORTAR
CEMENT.
4.) CATCH BASIN GRATES SHALL BE PLACED OVER FILTER FABRIC UNTIL SITE IS PAVED WITH BINDER
COARSE. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE FILTER FABRIC SO SEDIMENT DOES NOT GET
INTO CATCH BASINS.
5.) EXISTING CATCH BASIN ON ROUTE 6A SHOULD BE FITTED WITH SILT SOCK SO AS TO PROTECT
DRAINAGE DURING CONSTRUCTION OF THE ROADWAY.
6.) THE TWO CATCH BASINS AT STA 1+95.14 ON FAITH ROAD SHALL BE FITTED WITH CASCADE STYLE
GRATES, IN ORDER TO HANDLE FAST-MOVING RUNOFF IN THE 6% SLOPE AREA OF THE ROAD.
ROOF RUN-OFF:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO LEACHING FACILITIES USING 6"
ADS PIPE.
2.) EACH DWELLING SHALL UTILIZE A TOTAL OF (4) CULTEC RECHARGER 330XLHD
STORMWATER LEACHING UNITS, SPLIT INTO (2) 15.5'X 4.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET FULLY INTO CLEAN SAND. NO STONE REQUIRED
ACCESS ROAD:
1.) DURING CONSTRUCTION, A 20' WIDE STONE APRON SHALL BE CONSTRUCTED AT THE
PROPOSED ENTRANCE FOR DUST/SILT CONTROL.
2.) STONE APRON SHALL REMAIN IN PLACE UNTIL THE ENTRANCE HAS BEEN PAVED.
SWALE NOTES:
1.) ALL (7) SWALE SOIL BEDS AND LOWER SLOPED AREAS SHALL BE A MINIMUM OF 18" DEEP AND
COMPOSED OF APPROXIMATELY 50% SAND AND 50% LOAM. UPPER SLOPED SWALE AREAS SHALL
BE COVERED WITH A MINIMUM OF 4 INCHES OF LOAM. SEE SWALE DETAIL BELOW.
2.) ALL SLOPED SWALE AREAS SHALL BE COVERED WITH JUTE NETTING EROSION CLOTH, SECURED
IN PLACE.
3.) SOIL BED AND SIDE SLOPES SHALL BE SEEDED WITH MEADOW / WILDFLOWER SEED MIX.
APPLICATION RATE SHALL BE PER MFG'S SPECIFICATIONS. SIDE SLOPED AREAS SHALL BE PLANTED
WITH NORTHERN BAYBERRY AND WINTERBERRY SHRUBS. SEE C9- LANDSCAPE PLAN.
SWALE DETAIL:
NOT TO SCALE
VARIES
�~ (2' MIN.) ~�
I I
18"(min)
PERMEABLE SOIL 6�"(min)
(50% SAND, 50% LOAM) ------�
FILTER FABRIC
3/4" TO 1-1/2" STONE
NATIVE SOIL SUB -BASE -
FREE FROM LOAM / ORGANIC MATERIAL
STRAW WATTLE/EROSION CONTROL DETAIL:
(4) 3/4" Galvanized TYPICAL SECTION
Bolt & Nut Fasteners, per post Fill
3" Height /-Wood Stake
FLOW DIRECTION
raw Wattle
�Existin2 Grade
x6 Wood Posts 1.) LIMIT OF WORK SHALL BE MADE UP OF A 9" DIAMETER STRAW WATTLE INSTALLED PER THE
MANUFACTURERS SPECIFICATIONS.
2.) CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING EROSION/ RUNOFF DURING
CONSTRUCTION.
3.) LIMIT OF WORK SHALL BE INSTALLED PRIOR TO ANY WORK BEING STARTED.
RIP -RAP DETAIL FOR OUTFALL PIPE:
LOW PIPE
G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A -YARMOUTH PORT\DWG\Definitive Site Plans.dwg
12'
RIPRAP NOTES:
1.) RIP -RAP SHALL BE PLACED INTO CLEAN SAND, FREE
OF SILT AND DEBRIS.
2.) RIP -RAP STONE SHALL BE 6" TO 8" STONE PLACED IN
RANDOM PATTERN WITH UNEVEN SURFACE SO AS TO
REDUCE DISCHARGE ENERGY.
3.) THE BED OF RIP -RAP SHALL BE 1.5 FEET THICK.
4.) RIP -RAP STONE SHALL BE LAID ON A DOUBLE LAYER
OF FILTER FABRIC.
AIRED END SECTION
UTLET GUARD
e
- -
6
- -
1000 Gallon
Leaching Pit (6'x6'6)
USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL
70' x 28' x 6' Leaching Facility:
(10) Pits, spaced 14' on center with stone
TYPICAL CATCH BASIN & MANHOLE SECTION
NOT TO SCALE
PIPE CONNECTIONS TO
Solid 4' Dia. Solid 4' Dia. Solid 4' Dia.
Catch Basin Manhole Catch Basin
USE H-20 USE H-20 USE H-20
AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL AS MANUFACTURED BY SHOREY OR EQUAL
NOTE:
ALL MANHOLE RIM AND INVERT ELEVATIONS ARE CALLED
OUT ON THE C4- GRADING & DRAINAGE PLAN.
DRAINAGE CONSTRUCTION NOTES:
1.) ALL COMPONENTS, SUBJECT TO WHEEL LOADS, SHALL BE RATED H-20.
2.) ALL WORKMANSHIP PROVIDED SHALL BE IN CONFORMANCE WITH THE TOWN OF YARMOUTH
PLANNING BOARD & ENGINEERING SPECIFICATIONS.
3.) ANY MODIFICATIONS AND/OR DEVIATIONS FROM THE PLANS SHALL BE REVIEWED AND
APPROVED BY THE ENGINEERING DEPARTMENT.
CATCH BASIN AND LEACHING NOTES:
1.) ALL PROPOSED CATCH BASINS, LEACHING GALLERIES, AND TRENCHING ACROSS PARKING AREAS AND
SIDEWALKS SHALL BE BACKFILLED, AND COMPACTED IN 6 -INCH LIFTS. COMPACTION SHALL MEET 95%
STANDARD PROCTOR REQUIREMENTS. ALL BACKFILL MATERIAL SHALL BE DENSE GRADED CRUSHED
STONE WITH A MAX SIZE OF 3/4" OR ENGINEERED APPROVED EQUAL.
2.) THE LEACHING CHAMBERS SHALL BE SET FULLY INTO CLEAN SAND. DESIGN ENGINEER SHALL INSPECT
THE SOILS AROUND AND BELOW THE LEACHING FACILITY PRIOR TO FACILITY INSTALLATION.
3.) ALL CAST IRON FRAMES AND SEALS FOR DRAINAGE COMPONENTS SHALL BE FINISHED WITH MORTAR
CEMENT.
4.) CATCH BASIN GRATES SHALL BE PLACED OVER FILTER FABRIC UNTIL SITE IS PAVED WITH BINDER
COARSE. CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE FILTER FABRIC SO SEDIMENT DOES NOT GET
INTO CATCH BASINS.
5.) EXISTING CATCH BASIN ON ROUTE 6A SHOULD BE FITTED WITH SILT SOCK SO AS TO PROTECT
DRAINAGE DURING CONSTRUCTION OF THE ROADWAY.
6.) THE TWO CATCH BASINS AT STA 1+95.14 ON FAITH ROAD SHALL BE FITTED WITH CASCADE STYLE
GRATES, IN ORDER TO HANDLE FAST-MOVING RUNOFF IN THE 6% SLOPE AREA OF THE ROAD.
ROOF RUN-OFF:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO LEACHING FACILITIES USING 6"
ADS PIPE.
2.) EACH DWELLING SHALL UTILIZE A TOTAL OF (4) CULTEC RECHARGER 330XLHD
STORMWATER LEACHING UNITS, SPLIT INTO (2) 15.5'X 4.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET FULLY INTO CLEAN SAND. NO STONE REQUIRED
ACCESS ROAD:
1.) DURING CONSTRUCTION, A 20' WIDE STONE APRON SHALL BE CONSTRUCTED AT THE
PROPOSED ENTRANCE FOR DUST/SILT CONTROL.
2.) STONE APRON SHALL REMAIN IN PLACE UNTIL THE ENTRANCE HAS BEEN PAVED.
SWALE NOTES:
1.) ALL (7) SWALE SOIL BEDS AND LOWER SLOPED AREAS SHALL BE A MINIMUM OF 18" DEEP AND
COMPOSED OF APPROXIMATELY 50% SAND AND 50% LOAM. UPPER SLOPED SWALE AREAS SHALL
BE COVERED WITH A MINIMUM OF 4 INCHES OF LOAM. SEE SWALE DETAIL BELOW.
2.) ALL SLOPED SWALE AREAS SHALL BE COVERED WITH JUTE NETTING EROSION CLOTH, SECURED
IN PLACE.
3.) SOIL BED AND SIDE SLOPES SHALL BE SEEDED WITH MEADOW / WILDFLOWER SEED MIX.
APPLICATION RATE SHALL BE PER MFG'S SPECIFICATIONS. SIDE SLOPED AREAS SHALL BE PLANTED
WITH NORTHERN BAYBERRY AND WINTERBERRY SHRUBS. SEE C9- LANDSCAPE PLAN.
SWALE DETAIL:
NOT TO SCALE
VARIES
�~ (2' MIN.) ~�
I I
18"(min)
PERMEABLE SOIL 6�"(min)
(50% SAND, 50% LOAM) ------�
FILTER FABRIC
3/4" TO 1-1/2" STONE
NATIVE SOIL SUB -BASE -
FREE FROM LOAM / ORGANIC MATERIAL
STRAW WATTLE/EROSION CONTROL DETAIL:
(4) 3/4" Galvanized TYPICAL SECTION
Bolt & Nut Fasteners, per post Fill
3" Height /-Wood Stake
FLOW DIRECTION
raw Wattle
�Existin2 Grade
x6 Wood Posts 1.) LIMIT OF WORK SHALL BE MADE UP OF A 9" DIAMETER STRAW WATTLE INSTALLED PER THE
MANUFACTURERS SPECIFICATIONS.
2.) CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING EROSION/ RUNOFF DURING
CONSTRUCTION.
3.) LIMIT OF WORK SHALL BE INSTALLED PRIOR TO ANY WORK BEING STARTED.
RIP -RAP DETAIL FOR OUTFALL PIPE:
LOW PIPE
G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A -YARMOUTH PORT\DWG\Definitive Site Plans.dwg
12'
RIPRAP NOTES:
1.) RIP -RAP SHALL BE PLACED INTO CLEAN SAND, FREE
OF SILT AND DEBRIS.
2.) RIP -RAP STONE SHALL BE 6" TO 8" STONE PLACED IN
RANDOM PATTERN WITH UNEVEN SURFACE SO AS TO
REDUCE DISCHARGE ENERGY.
3.) THE BED OF RIP -RAP SHALL BE 1.5 FEET THICK.
4.) RIP -RAP STONE SHALL BE LAID ON A DOUBLE LAYER
OF FILTER FABRIC.
AIRED END SECTION
UTLET GUARD