HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 442- Lot I Z Zone of Contribution: In Out Acreage c".42_
Commercial: Residential: ✓
Street: 22 �-L t_�,:b.�,� L
Village: Sc�c..,T Floor Plan: ✓ #Bedrooms: 3
Owner: AA R.- -`'Q Installer:
Address: Phone:
Phone:
Builder: . le---S..o.1-.. Engineer: .3- .4"...-"---` c-As'e
Address: Phone:
Phone:
NIA YES NO
�
1.Required#of copies received __
2.Date of soils exam and percolation test not older than 2 years ✓
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: /
6. Benchmark indicated and shown-NGVD if near wetlands /
7. Septic tank minimum 10 ft from foundation,deck Var.: S t/
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: q' ,/
9.Leaching minimum 100 ft from wetlands Var.: 41` V-
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: •
11.Tank/leaching minimum 10 ft from property line Var.: 1.2''T A.X10- 2.4 SAS V
12. System meets all other setback requirements Var.: ✓
13.Uses adjustment or maximum high groundwater Var.: I' ./
14.Leaching set 5 above adj.water or bottom of test hole Var.: ✓
15. System not in-op or subsoil(A,B horizons)or 5' removal v'
16.Proposed contours are suitable ✓
17. System meets slope requirements-min. 1/8", 1/4"preferred
18. System meets breakout requirements PVC liner: all ✓
19. Specified tee sizes are proper,gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel ,/
21.No garbage disposal
22. System adequately sized for its intended use /
23.Minimum 6"stone or compacted below tank and dbox /
24. Manhole covers within 6"of grade,pump chamber cover to grade V
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size /
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking ,/
30.Buoyancy calculations for tank/pump chamber V
31.Engineer to inspect and certify soils: wall: commercial: Y ✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee,installer signature ✓-
35.Foundation footing min.2 feet above adjusted ground water for new house ✓/
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: �y/ 2d2TZ 6 0303