Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 442- Lot I Z Zone of Contribution: In Out Acreage c".42_ Commercial: Residential: ✓ Street: 22 �-L t_�,:b.�,� L Village: Sc�c..,T Floor Plan: ✓ #Bedrooms: 3 Owner: AA R.- -`'Q Installer: Address: Phone: Phone: Builder: . le---S..o.1-.. Engineer: .3- .4"...-"---` c-As'e Address: Phone: Phone: NIA YES NO � 1.Required#of copies received __ 2.Date of soils exam and percolation test not older than 2 years ✓ 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: / 6. Benchmark indicated and shown-NGVD if near wetlands / 7. Septic tank minimum 10 ft from foundation,deck Var.: S t/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: q' ,/ 9.Leaching minimum 100 ft from wetlands Var.: 41` V- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: • 11.Tank/leaching minimum 10 ft from property line Var.: 1.2''T A.X10- 2.4 SAS V 12. System meets all other setback requirements Var.: ✓ 13.Uses adjustment or maximum high groundwater Var.: I' ./ 14.Leaching set 5 above adj.water or bottom of test hole Var.: ✓ 15. System not in-op or subsoil(A,B horizons)or 5' removal v' 16.Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", 1/4"preferred 18. System meets breakout requirements PVC liner: all ✓ 19. Specified tee sizes are proper,gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ,/ 21.No garbage disposal 22. System adequately sized for its intended use / 23.Minimum 6"stone or compacted below tank and dbox / 24. Manhole covers within 6"of grade,pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size / 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking ,/ 30.Buoyancy calculations for tank/pump chamber V 31.Engineer to inspect and certify soils: wall: commercial: Y ✓ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee,installer signature ✓- 35.Foundation footing min.2 feet above adjusted ground water for new house ✓/ 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: �y/ 2d2TZ 6 0303