HomeMy WebLinkAboutVarriance Approval Letter 11%
TOWN OF YARMOUTH Board of
4 Health
1146 ROUTE 28,SOUTH
Tele YARMOUTH,MASSAext.CHUSETTS1241 02664-24451 Health
hone 508 398-2231 Division
P ( ) ,
Fax(508)760-3472
VARIANCE APP :OVAL
May 2,2022
OWNER. VARIANCE APPROVAL FROM B.O.H.
Arena Johp SEWAGE DISCHARGE REGULATION:
1 Lampliglter Way Minimum Requirements for Subsurface
Mount Heiman;MA 01354 Disposal of Sanitary Sewage: Title 5
Section(s): 15.405 (1 a),(lb)& (1h)
15.555 (5)
TOWN OF YARMOUTH AMENDMENTS
LOCATION: 22 Willow Lane TO TITLE 5: Section: 3.7
South Yarmouth, MA 02664
Map 42 Parcel 125
Dear Mr. john Arena:
The Yarmouth Board of Health, having reviewed your application on May 2, 2022 for a variance from the
provisions of Title 5 of the State Environmental Code, Section 15.405 (I a), (lb)&(lh)- 15.555 (5)and/or from
the Town of Yarmouth Amendments to Title 5,Section 3.7,for a Sewage Disposal System and,having determined
strict enforcement of these regulations in this instance would do manifest injustice and,further,that your requested
variance does not conflict with the spirit of the State Environmental Code nor the Town of Yarmouth
Amendments,has hereby granted the variance(s). The variance(s)granted are as follows:
SEE ATTACHED SHEET FOR VARIANCES.
Variances are shown on an engineered plan prepared by Down Cape Engineering,Inc. dated January 13,2022,&
revised, February 18, 2022 and March 17, 2022.
The . 'ance(s) granted herein shall expire on July 1,2023.
Bruce G. Murphy, R.S., 0, MPH, Health Director Date
Variances Approved by the Board of Health at
Meeting of May 2, 2022 cc: Down Cape Engineering, Yarmouth Port, M,
File
Page 1 of 2
BOARD OF HEALTH HEARING HELD
May 2,2022
LOCATION: 22 Willow Lane, South Yarmouth
OWNER1 Arena John
APPROVIED VARIANCES:
Title 5 V4riances:
Section 11.405
la. Redudtion in setback, SAS to lot line(10' to 7.8').
la. Redu4tion in setback, septic tank to lot line(10' to 6.5').
lb. Redu4tion in setback, septic tank to foundation(10' to 7.3').
lh. ReduItion in groundwater separation, 5' to 4'.
Section 1 .555
5. Redu tion in lateral removal of unsuitable material, 5' to 1'.
Town of Yarmouth Amendments to Title 5:
Section 3.7
Reduction in setback, SAS to BVW(100' to 55.1').
Reduction in groundwater adjustment(2.05' to 1.05').
Order of conditions:
1. Engineer to inspect septic system installation and provide As-Built.
2. Variances will expire on July 1,2023. (Work needs to be completed by July 1,2023)
Page 2 of 2