Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. G 7 Lot 3 Zone of Contribution: In Out_ Acreage/i 27b Street: Commercial: Residential:� jLe f r Pt C�l4� Village: /Floor Plan: ✓ #Bedrooms: Owner: _ Installer: 0c)t---- Address: -�Address: Phone: Phone: Builder: Engineer: Datti J ( C2 '€ Address: Phone: Phone: - N/A YES I NO 1. Required#of copies received - --_ ( ---- 2. Date of soils exam and percolation test not older than 2 years I J 3. 4-5 ft of naturally occurring pervious material, above water table ' 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: `� 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: ir -- 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1.7 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8". 14"preferred 18. System meets breakout requirements PVC liner: Wall: d 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel r - 21. No garbage disposal 22. System adequately sized for its intended use !/ 23. Minimum 6"stone or compacted below tank and dbox I , 24. Manhole covers within 6"of grade, pump chamber cover to grade v 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber,-Separate meter for duplexes 27. Pump system-2" line,weep hole,check valve, tee in dbox,pump size , / 28. Sestic tank/pump chamber to be factory waterproofed �/ 29. Vent provided if leaching below 3 feet,under driveway/parking r- 30. Buoyancy calculations for tank/pump chamber V 4......,........: - - 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j C 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house i / 36. Deed Restriction required max. #bedrooms: max. flow: gpd I .--7/ 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: