HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. G 7 Lot 3 Zone of Contribution: In Out_ Acreage/i 27b
Street: Commercial: Residential:� jLe f r Pt C�l4�
Village: /Floor Plan: ✓ #Bedrooms:
Owner: _ Installer: 0c)t----
Address:
-�Address: Phone:
Phone:
Builder: Engineer: Datti J ( C2 '€
Address: Phone:
Phone:
-
N/A YES I NO
1. Required#of copies received - --_ ( ----
2. Date of soils exam and percolation test not older than 2 years I J
3. 4-5 ft of naturally occurring pervious material, above water table '
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: `�
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: ir
--
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1.7
15. System not in top or subsoil(A,B horizons)or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8". 14"preferred
18. System meets breakout requirements PVC liner: Wall: d
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel r -
21. No garbage disposal
22. System adequately sized for its intended use !/
23. Minimum 6"stone or compacted below tank and dbox I ,
24. Manhole covers within 6"of grade, pump chamber cover to grade v
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber,-Separate meter for duplexes
27. Pump system-2" line,weep hole,check valve, tee in dbox,pump size , /
28. Sestic tank/pump chamber to be factory waterproofed �/
29. Vent provided if leaching below 3 feet,under driveway/parking r-
30. Buoyancy calculations for tank/pump chamber V 4......,........:
- -
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j C
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house i /
36. Deed Restriction required max. #bedrooms: max. flow: gpd I .--7/
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: