HomeMy WebLinkAboutLandscaper Letter
September 8, 2022
Brittany DiRienzo, Administrator
Yarmouth Conservation Commission
1146 Route 28Orleans Town Hall
South Yarmouth, MA 02664
Re: Request for Cert of Compliance SE 83-2162 and SE 83-2192
Dear Ms. DiRienzo:
On Thursday September 1, 2022, the property owner, Paul Lucey, contacted our office and sent
photographs of the project areas subject to the Orders of Conditions referenced above (photos
attached).
After reviewing these photographs, I recommended planting 6 additional bayberry shrubs on the slope
to replace some vegetation that succumbed to this summer's drought conditions. These shrubs were
provided to Mr. Lucey by BlueFlax Design LLC and were planted by him. Photos of these planted
bayberry shrubs are attached.
With this additional planting, and after reviewing the As-Built report provided by Dan Ojala at Down
Cape Engineering and the monitoring report completed by you for BlueFlax Design LLC in January
2022, I believe the slope stabilization and restoration planting and stair installation projects are
substantially in compliance with their related Orders of Conditions, and feel confident that a Certificate
of Compliance can be issued for this project.
Sincerely,
Theresa Sprague
BlueFlax Design LLC
Photos of site dated 9/1/22 provided by Paul Lucey
Photos of newly planted bayberry shrubs provided by Paul Lucey 9/2/22