Loading...
HomeMy WebLinkAboutLandscaper Letter September 8, 2022 Brittany DiRienzo, Administrator Yarmouth Conservation Commission 1146 Route 28Orleans Town Hall South Yarmouth, MA 02664 Re: Request for Cert of Compliance SE 83-2162 and SE 83-2192 Dear Ms. DiRienzo: On Thursday September 1, 2022, the property owner, Paul Lucey, contacted our office and sent photographs of the project areas subject to the Orders of Conditions referenced above (photos attached). After reviewing these photographs, I recommended planting 6 additional bayberry shrubs on the slope to replace some vegetation that succumbed to this summer's drought conditions. These shrubs were provided to Mr. Lucey by BlueFlax Design LLC and were planted by him. Photos of these planted bayberry shrubs are attached. With this additional planting, and after reviewing the As-Built report provided by Dan Ojala at Down Cape Engineering and the monitoring report completed by you for BlueFlax Design LLC in January 2022, I believe the slope stabilization and restoration planting and stair installation projects are substantially in compliance with their related Orders of Conditions, and feel confident that a Certificate of Compliance can be issued for this project. Sincerely, Theresa Sprague BlueFlax Design LLC Photos of site dated 9/1/22 provided by Paul Lucey Photos of newly planted bayberry shrubs provided by Paul Lucey 9/2/22