Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YAMOIITH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot /6 / Zone of Contribution: In Out Acreage Commercial: R idential: C.,,, Street: S5" ik, 4,y / L" Village: - Ci�� Floor Plan: L-- #Bedrooms: Owner: pre5 to b6d; Installer: S Address: Phone: 9 -/ ‘ Phone: Builder: Engineer: � � >> gyp,/ cr/�l //l? Address: K Phone: 7 Phone: Otti,i4V/ ii,,v f"i/(,le// f7 f K g 5 CidS6 N/A 'YES NO V 1.Required#of copies received + ,•-"-- 2. Date of soils exam and percolation test not older than 2 years (./' 3. 4-5 ft of naturally occurring pervious material, above water table ,...._---- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: Lam-' 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: ( 4 ✓ L 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l 2, ' .1/4...------- 9. Leaching minimum 100 ft from wetlands Var.: ___-..- 10. --�10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 1 11. Tank/leaching minimum 10 ft from property line Var.: ‘..------ 12. System meets all other setback requirements Var.: ,.L_/ 13.Uses adjustment for maximum high groundwater Var.; F./V 14. Leaching set 4-5 ft above adj. water or botto -of test hole ar.: 15. System not in top or subsoil(A,B horizons)it 5'remov- 16.Proposed contours are suitable k.-------- 17. l/17. System meets slope requirements-min. 1/8", '/a"preferred iii 18. System meets breakout requirements PVC liner: Wall: .19. Specified tee sizes are proper, gas baffle on outlet tee ,./ 20. Sewage is under 10,000 gpd for parcel L/ 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox L----'- 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed �/ 29. Vent provided if leaching below 3 feet,under driveway/parking /'" 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature �----"*" 35.Foundation footing min. 2 feet above adjusted ground water for new house / 36. Deed Restriction required max. #bedrooms: max. flow: gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by:• PI 6/03/03