HomeMy WebLinkAboutCoastal Eng. Transmittal Sheets 260 Cranberry Highway
Orleans, MA 02653 TRANSMITTAL
rnAs-rA i 508.255.6511 P 508.255.6700 F
Orleans I Sandwich I Nantucket
engineering co. coastalengineeringcompany.com
To: Yarmouth Health Department Date: 2/8/2022 Project No. C19814.00
Attn: Bruce Murphy, Health Director, R.S.,
MPH, CHO Via: Class Mail OPick up ®Delivery EFed Ex
Yarmouth Town Hall Phone:
1146 Route 28
South Yarmouth, MA 02664 F=ax.
Subject: Howard Johnson Septic Upgrade Plan No. of pages to follow:
Howard Johnson by Wyndham -- -_ =_
Sia Devang LLC - �_
226 Route 28 FEB 9 2022
Yarmouth, MA 02673
Map 37 Parcel 147.2 HEALTH DEPT.
® Plans ❑ Copy of Letter Ell Specifications [] Other
We are sending the following items:
Copies Date No. Description
1 2/8/2022 2 Sheets Proposed Sewage Disposal System Upgrade Plan, Howard Johnson
1 1/18/2022 2 Sheets Floor Plan for Permitting, Howard Johnson — Mistry Associates
These are transmitted as checked below:
Ifor approval for your use as requested Zfor review & comment ❑
Remarks: Please see enclosed DRAFT septic system upgrade plans. There is no change to the design flow. The
setback distance for the proposed leaching field to wetlands is 57.6 feet which is greater than the
existing leaching pit's 43.1 ft distance to wetlands. It is an improvement from the existing condition.
The upcoming Conservation Commission filing deadline is 2/17/2022 for the 3/3/2022 meeting. We
appreciate any informal review in advance of submitting final plans to the BOH and Conservation
Commission.
If you have any questions, please contact our office.
cc: Nalin Mistry, PE, Mistry Associates By: Bryan Weiner, PE, Coastal Engineering
C:\Users\bweiner\Downloads\2022-02-08 Transmittal Yarmouth Board of Health-Howard Johnson.doc
NOTE:If enclosures are not as noted:please contact us at(508)255-6511
d?b
260 Cranberry Highway
-•` Orleans, MA 02653 TRANSMITTAL
508.255.6511 P 508.255.6700 F
COASTAL Orleans I Sandwich I Nantucket
engineering co. coastalengineeringcompany.com
To: Yarmouth Health Department Date: 4/1/2022 Project No. C19814.00
Attn: Bruce Murphy, Health Director, R.S.,
MPH, CHO Via: Hist Class Mail I Pick up NDelivery nFed Ex
Yarmouth Town Hall Phone:
1146 Route 28
South Yarmouth, MA 02664 Fax:
Subject: Howard Johnson Septic Upgrade Plan No. of pages to follow:
Howard Johnson by Wyndham
Sia Devang LLC _
226 Route 28 � \y^`
Yarmouth, MA 02673 APR u 2022
Map 37 Parcel 147.2
VI Plans n Copy of Letter Specifications Other HL DEPT.
We are sending the following items:
Copies Date No. Description
1 3/31/2022 3 Sheets Proposed Sewage Disposal System Upgrade Plan, Howard Johnson
(24x36)
1 2/11/2022 1 Sheet Plan of Land by PLS (24x36)
1 1/18/2022 2 Sheets Floor Plan for Permitting, Howard Johnson — Mistry Associates (11x17)
These are transmitted as checked below:
Nfor approval Nfor your use Nf as requested for review 5 comment n
Remarks: Please see enclosed septic system upgrade stamped plans for review and approval. We completed the
additional soil testing on 3/9/2022. We enclosed the design plans, property line survey plan, and floor
plan. The Conservation Commission 100-foot buffer zone work for the piping and abandonment was
approved, refer to Mas5DEP File# SE 083-2327.
If you have any questions, please contact our office.
cc: Nalin Mistry, PE, Mistry Associates By: Bryan Weiner, PE, Coastal Engineering
F:\SDSKPROJ\C19000\C19815\C19815-00\Doc Out\2022-04-01 Howard Johnson BOH Submission\2022-02-08 Transmittal Yarmouth Board of Health-
Howard Johnson.doc
NOTE:If enclosures are not as noted,please contact us at(508)255-6511
260 Cranberry Highway
Orleans, MA 02653 TRANSMITTAL
508.255.6511 P 508.255.6700 F
COASTAL Orleans I Sandwich I Nantucket
engineering co. coastalengineeringcompany.com
To: Yarmouth Health Department Date: 4/13/2022 Project No. C19814.00
Attn: Bruce Murphy, Health Director, R.S.,
MPH, CHO Via: Mist Class Mail MPick up MDelivery MFed Ex
Yarmouth Town Hall Phone:
1146 Route 28
South Yarmouth, MA 02664 Fax:
Subject: Howard Johnson Septic Upgrade Plan No. of pages to follow:
Howard Johnson by Wyndham
Sia Devang LLC KRYLEYLD
226 Route 28
Yarmouth, MA 02673 APR i 4 2022
Map 37 Parcel 147.2
HEALTH DEPT.
M Plans Copy of Letter Specifications I ( Other
We are sending the following items:
Copies Date No. Description
3 4/13/2022 3 Sheets Proposed Sewage Disposal System Upgrade Plan, Howard Johnson
(24x36) revl
These are transmitted as checked below:
Mfor approval Mfor your use Eas requested Mfor review 5 comment M
Remarks: Enclosed are three (3) copies of the septic system upgrade stamped plans for review and approval in
accordance with our phone call on 4/12/2022.
• Sheet 1 — slab foundation noted
• Sheet 2 — added Conseal CS-55 waterborne acrylic based coating to pump chamber and septic
tank below elevation 8.0. This will assure coverage at an elevation above the seasonal high
groundwater elevation of 7.28.
• Sheet 2 — added tunnel tank note for pump chamber and septic tank.
• Sheet 3 — slab foundation noted
Please call with any questions, cell 781-962-4498.
cc: Nalin Mistry, PE, Mistry Associates By: Bryan Weiner, PE, Coastal Engineering
FASDSKPROJ\C19000\C19815\C19815-00\Doc Out\2022-04-13 Howard Johnson BOH Submission Revised\2022-04-13 Transmittal Yarmouth Board of
Health-Howard Johnson.doc