Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 3 7 Lot 1-I . Z Zone of Contribution: In Out "Acreage Commercial: )` Residential: Street: 22 c, P'- --c �- 2 e Village: ,..,)CI5.7- Floor Plan: ✓ #Bedrooms: 6,( f /000 s Owner: l-10,5s-.rte ,--1ea T 5a,,.) Installer: Address: Phone: Phone: Builder: Engineer: CO r4-'5. 'C- Address: Phone: Phone: N/A YES NO 1. Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table ,/ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5.Water line 10 ft from septic components Var.: V 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation,deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓ 9.Leaching minimum 100 ft from wetlands Var.: ,/ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ' k/ 11.Tank/leaching minimum 10 ft from property line Var.: V 12. System meets all other setback requirements Var.: 7 13.Uses adjustment for maximum high groundwater Var.: V 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: V 15. System not in top or subsoil(A,B horizons)or 5' removal ,, 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/,"preferred 18. System meets breakout requirements PVC liner: Wall: / 19. Specified tee sizes are proper, gas baffle on outlet tee ,/, 20. Sewage is under 10,000 gpd for parcel J 21.No garbage disposal 22. System adequately sized for its intended use 1/ 23.Minimum 6"stone or compacted below tank and dbox V, 24.Manhole covers within 6"of grade, pump chamber cover to grade ,/,- 25.Inspection port on plastic chambers/leach field V 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed Al 1( 29.Vent provided if leaching below 3 feet,under driveway/parking c/ 30. Buoyancy calculations for tank/pump chamber r/ 31. Engineer to inspect and certify soils: wall: commercial: \/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t/ 33. H-20 loading is subject to vehicular traffic,groundwater 17 34.Title V Application and permit fee,installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house ✓ 36.Deed Restriction required max. #bedrooms: max.flow: gpd 37. Check area lots for groundwater/Label groundwater• Assessor's Map Plan reviewed by: cv' ` �'T K [2- 2G 2Z 6 03 03