Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. caLot ,2 2 - Zone of Contribution: In Out- Acrea_e:I.392 �� �� !7�r�' �� Commercial: Residential: j,�►-- Street: y O Village: / / - Floor Plan: #Bedrooms: 3 Owner: A e w ' ci?)A Bc", /JJr$ Installer: , A i $ Address: Phone: Phone: Builder: Engineer: 113 S C. Address: Phone: Phone: N/A YES/ I NO 1 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years I 1/ 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: / 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: ! I r 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9, $/ 9. Leaching minimum 100 ft from wetlands Var.: I 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well _ Var.: 11. Tank/leaching minimum 10 ft from property line Var.: i 'l 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: /,7, 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable - 1- 17. System meets slope requirements=min. 1/8", 1,4."preferred ...------ 18. System meets breakout requirements PVC liner: Wall: I 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal - / 22. System adequately sized for its intended use / 23. Minimum 6"stone or compacted below tank and dbox ,, 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field V' 26. Electrical permit for pump chamber/Separate meter for duplexes kV 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size 28. Se tic tank/pump chamber to be factory waterproofed L� 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber �/� 31. Engineer to inspect and certify soils: wall: commercial: / /` 32. EncineerRegistered Sanitarian and Land Surveyor stamps/signature j ,,/ / 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature / 35. Foundation footing min. 2 feet above adjusted ground water for new house i 36. Deed Restriction required max. #bedrooms: max. flow: gpd 7 37. Check area lots for groundwater/Label groundwater in Assessor's Map I / Plan reviewed by: 01 01