HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 9'( Lot /7C. Zone of Contribution: In Out/Acreage /q 9 i 3 r -5F
Commercial: Residential: 1....--
Street: C00 Cv - U t -..0 '-j i..-- V E- /
Village: �v� _ Floor Plan: V #Bedrooms: (-4
�S
Owner: .tet .1-11---T-- ---e-.1-11---T-- ---e-t_ Installer: ,,,,,,„_%_,,,,.....s
Address: _ Phone:
Phone:
Builder: Engineer: K 6-Y6'4--
Address: Phone:
Phone:
N,'A YES/ NO
1. Required#of copies received ✓
2. Date of soils exam and percolation test not older than 2 years V
3.4-5 ft of naturally occurring pervious material,above water table _ V
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: S C.K✓c,-..-� t/
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation,deck Var.: t-k i`ST _ ,i
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 44-4 t/
9. Leaching minimum 100 ft from wetlands Var.: I V
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V
11.Tank/leaching minimum 10 ft from property line Var.: V
12. System meets all other setback requirements Var.: /
13.Uses adjustment for maximum high groundwater Var.: V .
14. Leaching set 4&t above adj. water or bottom of test hole Var.`
15. System not in top or subsoil(A,B horizons)or 5' removal ✓
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/"preferred ✓
18. System meets breakout requirements PVC liner: Wall: V
19. Specified tee sizes are proper, gas baffle on outlet tee V J
20. Sewage is under 10,000 gpd for parcel 7
21.No garbage disposal
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade 7-
25. Inspection port on plastic chambers/leach field _ V
26. Electrical permit for pump chamber/Separate meter for duplexes ,/
27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size /
28. Septic tank/pump chamber to be factory waterproofed /
29. Vent provided if leaching below 3 feet,under driveway/parking /
30. Buoyancy calculations for tank/pump chamber ,/
31. Engineer to inspect and certify wall: commercial:
32. Engineer/Registered Sanitarian . : Land S1tt�e stamps/signature ✓-
33.H-20 loading is subject to vehicular ra fic,groundwater /
34.Title V Application and permit fee,installer signature ,/
35.Foundation footing min.2 feet above adjusted ground water for new house //
36.Deed Restriction required max. #bedrooms: max. flow: gpd I ,/
37. Check area lots for groundwater/Label groundwater in Assessor's Map 1
Plan reviewed by:_ -7"1-34-/ s"_ _ S(2t/ 2.0e-,....t
6 03 03