Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 9'( Lot /7C. Zone of Contribution: In Out/Acreage /q 9 i 3 r -5F Commercial: Residential: 1....-- Street: C00 Cv - U t -..0 '-j i..-- V E- / Village: �v� _ Floor Plan: V #Bedrooms: (-4 �S Owner: .tet .1-11---T-- ---e-.1-11---T-- ---e-t_ Installer: ,,,,,,„_%_,,,,.....s Address: _ Phone: Phone: Builder: Engineer: K 6-Y6'4-- Address: Phone: Phone: N,'A YES/ NO 1. Required#of copies received ✓ 2. Date of soils exam and percolation test not older than 2 years V 3.4-5 ft of naturally occurring pervious material,above water table _ V 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: S C.K✓c,-..-� t/ 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation,deck Var.: t-k i`ST _ ,i 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 44-4 t/ 9. Leaching minimum 100 ft from wetlands Var.: I V 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11.Tank/leaching minimum 10 ft from property line Var.: V 12. System meets all other setback requirements Var.: / 13.Uses adjustment for maximum high groundwater Var.: V . 14. Leaching set 4&t above adj. water or bottom of test hole Var.` 15. System not in top or subsoil(A,B horizons)or 5' removal ✓ 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/"preferred ✓ 18. System meets breakout requirements PVC liner: Wall: V 19. Specified tee sizes are proper, gas baffle on outlet tee V J 20. Sewage is under 10,000 gpd for parcel 7 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade 7- 25. Inspection port on plastic chambers/leach field _ V 26. Electrical permit for pump chamber/Separate meter for duplexes ,/ 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size / 28. Septic tank/pump chamber to be factory waterproofed / 29. Vent provided if leaching below 3 feet,under driveway/parking / 30. Buoyancy calculations for tank/pump chamber ,/ 31. Engineer to inspect and certify wall: commercial: 32. Engineer/Registered Sanitarian . : Land S1tt�e stamps/signature ✓- 33.H-20 loading is subject to vehicular ra fic,groundwater / 34.Title V Application and permit fee,installer signature ,/ 35.Foundation footing min.2 feet above adjusted ground water for new house // 36.Deed Restriction required max. #bedrooms: max. flow: gpd I ,/ 37. Check area lots for groundwater/Label groundwater in Assessor's Map 1 Plan reviewed by:_ -7"1-34-/ s"_ _ S(2t/ 2.0e-,....t 6 03 03