Loading...
HomeMy WebLinkAboutEngineer Plan30 32 28 \ 24 26 \ \A, \\ 120.04' \ \ A, `\ `\ LOT 9 V A \ AREA = 20.500 0 \ �as_rs ion M_ 090 L 032 z Ln \ \ LLJ N \ \ W \ \ IL o ~ 23.5 ` `\ m 32 I 14 A-- 2G --24 22 20 \ 18 IG LEGEND PROPOSED CONTOUR ® PROPOSED SPOT GRADE -- gg -- EXISTING CONTOUR + 96.52 EXISTING SPOT GRADE —W— EXISTING WATER SERVICE im TEST PIT SCALE: 1"=30' AUG 312022 HEALTH DEPT. Yarmouth Health Department SURVEY BY: WELLER & ASSOC. SOUTH YARMOUTH LILY POND 3 REFLECT WAY ae o o '��� LOCUS = C ^ 43 REFLEMION WAY LOCUS MAP LOCUS INFORMATION PLAN REF: LCC 34479 TITLE REF: 8104/0274 PARCEL ID: MAP 090 PAR. 032 PROPERTY IS NOT WITHIN ZONE II FLOOD ZONE: NOT IN FLOOD ZONE COMMUNITY PANEL: 25001CO591J DATED:07/16/14 SEPTIC SYSTEM REPAIR PLAN LOCATED AT: 43 REFLECTION WAY SOUTH YARMOUTH, MA PREPARED FOR WILLIAM McDONALD/ R Y ROOTER EXC. AUGU REVISED: AUGUST 30, 2022 SRU" yq. .t�OF 4a< ` MEYER & SONS, INC. P.O. BOX 981 EAST SANDWICH, MA. 02537 PH: (508)360-3311 FAX: (774)413-9468 meyerandsonstitle5®gmail.com SHEET 1 OF 2 J#2262 TOP OF FND. EL.= 24.50 T.n nM '.G.EL: 23.50 1 F.G.EL, 23.50 TEE'S ARE To BE 4" SCH 40 RVC INV. 21.20) a EXIST. 1,000 GAL GAS BAFFLE TO I OUTLET TEE AS P NOTES: TUF-TITE, ZABEL, 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS PRIOR TO CONSTRUCTION 2) D -BOX SHALL BE SET LEVEL AND TRUE TO GRADE ON A MECHANICALLY COMPACTED SIX INCH CRUSHED STONE BASE, AS SPECIFIED IN 310 CMR 15.221(2) 3) REPLACE EXISTING 1,000 GALLON SEPTIC TANK WITH 1,500 GALLON SEPTIC TANK IF FAILED, DAMAGED OR UNDERSIZED. 4) INSTALL INLET & OUTLET TEES W/ GAS BAFFLE AS REQUIRED GENERAL NOTES: 1. ALL CHANGES TO THIS PLAN .MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE V. AND ANY APPLICABLE LOCAL RULES AND REGULATIONS. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. 5. ALL ELEVATIONS BASED ON ASSUMED DATUM. 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 8. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TOA CONDITION AGREED UPON BETWEEN OWNER AND CONTRACTOR. 9. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY. THE THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION. 10. EXISTING LEACHING TO BE PUMPED, CRUSHED AND FILLED PER TITLE 5. 11. 48 HOUR NOTICE FOR ENGINEER CERTIFICATION 12. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY 13. NO PRIVATE WELLS WITHIN 150' OF PROPOSED LEACHING. 14. NO WETLANDS WITHIN 100' OF PROPOSED LEACHING. 15. ALL PIPING TO BE 4" SCH 40 O 1/8"/FT (UNLESS SPECIFIED) GAS BAFFLE NOTE: PLACE MAGNETIC MARKING TAPE OVER ALL COVERS BRING ALL COVERS TO WITHIN 3" OF FINISH GRADE F.G. EL: 22.50 FINISHED GRADE MAINTAIN 2% MIN SLOPE OVER LEACHING AREA 2" OF 3/8- DOUBLE WASHED STONE OR FILTER FABRIC 4" SCH 40 PVC 1% (MIN. INV. 19.70/,"2' E�F. DEPTH INV: 20.95 INV. 19.50 PROPOSED DB -3 DISTRIBUTION BOX q SEPTIC TANK INSTALLED ON UFACTURED BY 2 EQUAL SEPTIC SYSTEM HNUHLt (H2O) INV. ELEV.= 18.50 0 2 X 8.5' 3/4• - 1-1./2" DOUBLE WASHED STONE 4' I / EFFECTIVE LENGTH = 25' 1 TOP CONC. ELEV.= INV. ELEV.= 1 BOTTOM EL.= 1 19.50 SEPARATION 5.30 FT. OTTOM OF TESTHOLE EL: 11.20 SOIL LOGS DATE: JULY 7, 2022 SOIL EVALUATOR: DARREN M. MEYER, RS, CES 1614 WITNESS: JAY GARDINER, YARMOUTH HEALTH DEPT Eley. TP -1 Depth 22.20 0" A LOAMY SAND I' 10YR 3/2 20.78 17" (� C%j B LOAMY SAND ;rte eU 10YR 5/8 ,)In�l 1 Q Owl 18.87 40" i C W MEDIUM L SAND PERK O 2.5Y 7/4 17.53 .11.20 1 1132" PERC RATE <2 MIN/IN. ("C" HORIZON) NO GROUNDWATER OBSERVED • I, Darren M. Meyer, R.S., CSE, hereby certify that I am currently approved by MADEP pursuant to 310 CMR 15.017 to conduct soil evaluations and that the above analysis has been performed by me consistent with the requirements of 310 CMR 15.017. 1 further certify that I have passed the Soil Eval. Exam in October, 1999. BREAKOUT ELEV.= 19.50 SOIL ABSORPTION SYSTEM (SECTION) (500 GALLON LEACH CHAMBER) DESIGN CRITERIA NUMBER OF BEDROOMS: 3 BEDROOM DESIGN SOIL TEXTURAL CLASS: CLASS 1 (0.74 GPD/SF) DESIGN PERCOLATION RATE: <2 MIN/IN DAILY FLOW: 110 G.P.D. X 3 BR = DESIGN FLOW: 330 G.P.D. GARBAGE GRINDER: NO (not designed for gorbage grinder) SEPTIC TANK: 330. gpd x 200% = 660 gpd USE EXIST. 1,000G SEPTIC TANK LEACHING AREA REQUIRED: (330)/0.74 = 445.94 S.F. USE TWO (2) 500 GALLON PRECAST LEACH CHAMBERS W/ 4' STONE ON ENDS & 3.75' STONE ON SIDES: 25' L x 12.5' W x 2'D BOTTOM AREA: 25 x 12.5 = 312.5 SF SIDE AREA: (25 + 12.5)X 2 X 2 = 150 SF TOTAL SQUARE FEET PROVIDED = 462 vs. 445.94 REQ'D DESIGN FLOW PROVIDED: 0.74(462 S.F.) = 342.25 G.P.D. vs. 330 G.P.D. req'd PROPOSED SEPTIC SYSTEM UPGRADE PLAN 43 REFLECTION WAY, SOUTH YARMOUTH, MA Prepared for: McDonald/ ady Rooter Exc. Design and Site Plan by: SCALE I DRAWN DATE MEYER & SONS, INC N.T.S. DMM 08/08/2 PO BOX 981 REV DATE EASTSANDWICH, MA 02537 CHECKED SHEET NO. 506-362-2922 08/30/22 1 DMM 2 of 2