HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot - Zone of Contribution: In Out Acreage c2a ,j O 0
/ L Commercial: Residential: ,/Street: c�/ C/` e jJ en,d
Village: loor Plan: ✓ #Bedrooms: '3
V t r 4 V t
Owner: 3,o 1�1 C,�wn Installer: C2?e C ool .cc'/ ��� C.
Address: Phone:
Phone:Builder: Engineer: R • CO c/!jr/f4-
c C.
Address: - Phone:
Phone:
N/A YES I NO 1
1. Required#of copies received I -----
2. Date of soils exam and percolation test not older than 2 years I
1_, .
3. 4-5 ft of naturally occurring pervious material, above water table -
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: /
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
. 7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l/
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: .
11. Tank/leaching minimum 10 ft from property line Var.: rj'"0 ✓-
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: k .
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons) or 5' removal I v
16. Proposed contours are suitable I t�
17. System meets slope requirements-min. 1i 8", 14."preferred i'
18. System meets breakout requirements PVC liner: Wall: f
19. Specified tee sizes are proper, gas baffle on outlet tee �
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal I t7„/
22. System adequately sized for its intended use i. '
23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade "I
25. Inspection port on plastic chambers/leach field / L .
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2" line,weep hole,check valve,tee in dbox,pump size 7
28. Se tic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber t� __
31. Engineer to inspect and certify soils: wall: commercial: I 7
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j
33. H-20 loading is subject to vehicular traffic, groundwater I t/
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd 1
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by 9 a o:
7/
^Y /'� 2 ^� fir. - �� -� 1-