Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST • Location: A.M. Lot 3O 3/ Zone of Contribution: In Out V Acreage/Q �j 6 ( Commercial: Residential: '� Street: a C�f G., 1 Xl Village: Floor ` / Plan: f # Bedrooms:_ Owner: Q, ak. r S c C.,,{Cc L Installer: `ems i k.e 30rSel/C., Address: Phone: Phone: Builder: Engineer: A Address: Phone: Phone: N/A YES I NO Required#of copies received Li 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table v 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: v 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: I 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking we11'25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: - 12. System meets all other setback requirements Var.: 7, 13. Uses adjustment for maximum high groundwater Var.:14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 7 15. System not in top or subsoil(A,B horizons)or 5' removal 7 16. Proposed contours are suitable - 7 17. System meets slope requirements-min- 1/8", 1,4"preferred _ 4� 18. System meets breakout requirements PVC liner: Wall: I 1 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal i 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox 47. 24. Manhole covers within 6"of grade, pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes i/,,' 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size 28. Se tic tank/pump chamber to be factory waterproofed f :, 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber _.. -_- 31. Engineer to inspect and certify soils: wall: . commercial: o� 32. Engineer.:Registered Sanitarian and Land Surveyor stamps/signature j 33. H-20 loading is subject to vehicular traffic, groundwater C 34. Title V Application and permit fee, installer signature / 1 35. Foundation footing min. 2 feet above adjusted ground water for new house i #/ 36. Deed Restriction required max. #bedrooms: max. flow: gpd I ✓ / 37. Check area lots for groundwater/Label groundwater in Assessor's Map ' I7 , Plan reviewed by: ✓✓ 3 - 2