The following report includes items that require completion and or correction for the above mentioned
project. These items were noted during our field observation on 9/20/22. Items included in this report are
limited to those that were accessible and visible during the time of our field observation. Completion and or
correction of those items included in this report does not relieve the contractor of his responsibility to provide
complete and operational systems in accordance with the contract documents.
General: Site/interior work is progressing. Below are our observations. In general, piping was observed
as capped and sufficiently covered to protect the piping from dust and debris.
Trench drain vent piping and trap primer piping
observed as partially installed.
2
Cleanouts observed as installed.
Hub and spigot underground sanitary piping observed
as installed.
Drains were observed with caps to protect from dust
and debris.
3
Sanitary point of entrance for Unit 2 observed as
partially installed. Vent piping for trench drain
observed as partially installed.
Vent piping for sand oil separator and holding tank for
Unit 2 observed as partially installed.
Trench drains observed on site, not yet installed.
4
Sanitary main and excavating in Unit 3 was observed as
progressing.
Both sand oil separators were observed on site, not yet
installed.
Diffusers have been demolished.
5
Mini-split AC units have been demolished.
Installation of new HVAC units has not begun.