Loading...
HomeMy WebLinkAbout2022_09_28 Project Visit Report_FedExC o n s u l t i n g E n g i n e e r i n g S e r v i c e s , L L C 128 Carnegie Row, Suite 204, Norwood, MA. 02062 T 617.261.7161 ceseng.com Field Observation Report Report Date: September 28, 2022 Written To: Kurt Raber – Catalyst Architecture Interiors Project Name: FedEx 225 Whites Path CES Project Number: 2022053.00 Written By: Edward Wellington and Joseph Sacchetti The following report includes items that require completion and or correction for the above mentioned project. These items were noted during our field observation on 9/20/22. Items included in this report are limited to those that were accessible and visible during the time of our field observation. Completion and or correction of those items included in this report does not relieve the contractor of his responsibility to provide complete and operational systems in accordance with the contract documents. General: Site/interior work is progressing. Below are our observations. In general, piping was observed as capped and sufficiently covered to protect the piping from dust and debris. Trench drain vent piping and trap primer piping observed as partially installed. 2 Cleanouts observed as installed. Hub and spigot underground sanitary piping observed as installed. Drains were observed with caps to protect from dust and debris. 3 Sanitary point of entrance for Unit 2 observed as partially installed. Vent piping for trench drain observed as partially installed. Vent piping for sand oil separator and holding tank for Unit 2 observed as partially installed. Trench drains observed on site, not yet installed. 4 Sanitary main and excavating in Unit 3 was observed as progressing. Both sand oil separators were observed on site, not yet installed. Diffusers have been demolished. 5 Mini-split AC units have been demolished. Installation of new HVAC units has not begun.