Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH C ' b1:00 SEWAGE PLAN REVIEW CHECKLIST Location: AM 5c< LOT /6 e) Date of Subdivision Approval Street o2/ # GC /M I Zone of Contribution: In Out t Village �£ /24'l Commercial Residential Owner: h.i.Gd 6€% Installer 776/9- Builder: Engineer aN7 Ca4ieela.,e 77c- 9'7&6 N/A YES NO 1. Required number of copies received. ,/ 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) LZ 4. Foundation 2 feet above high point of fronting road for new construction. , 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown- NGVD if near wetlands. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. f 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. ,/ 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. t . 15. System not in top or subsoil or 5 foot removal. 1/ 16. Proposed contours are suitable. 17. System meets slope requirements - min. 1/8", 1/4" preferred. (/ 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. / / 19. Specified tee sizes are proper. gas baffle on outlet tee. L� _ 20. Sewage flow under 10,000 gpd for parcel. ;� 21. No garbage disposal. ,/ 22. System adequately sized for its intended use. a_/ 23. Minimum 6" stone or mechanically compacted below the tank and d-box. ,/ 24. Manhole covers within 6" of grade - septic tank and pump chamber. ✓" 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit. 7. Se tic tank and um chamber t be Factory wate f d ✓ 28. Vent provided i leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a, clay removal i' b. wall construction schedule J c. commercial system 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April_7, 1989 - Phosphorus Zone 300'. Plan reviewed by: 6.9A... J