Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH 6 SEWAGE PLAN REVIEW CHECKLIST Location: AM 'C LOT ✓9-7-4 Date of Subdivision Approval Street ` 'ZZone of Contribution: In Out_ / Village �j. _-,' t-itl Commercial Residential Owner: iauWl/�li�il�/L Installer i� I !'� ,,, 62_ - it?&O Builder: Engineer d 1 i�% I1 --.i77 N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. c/ 5. Water availability letter from Water Department for new construction. ✓ 6. Benchmark indicated and shown - NGVD if near wetlands. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. ✓ 9. Leaching a minimum of 20 feet from house and 10 feet from deck. c 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. �/ 16. Proposed contours are suitable. ✓ 17. System meets slope requirements - min. 1/8". 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper. gas baffle on outlet tee. ✓� 20. Sewage flow under 10.000 gpd for parcel. 21. No garbage disposal. ` 22. System adequately sized for its intended use. / 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit 27. Septic tank and pump chamber to be Factory waterproofed. / 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : A. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. ..-/ 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: