Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 6 7 D Lot / 3 _ Zone of Contribution: In Out '"Acreage ///S Fd Commercial: Residential: i ---' Street: c0 LXd P1L Village: Floor Plan: 1/'--- #Bedrooms: 3 Owner: Po ro y c'w a.rel Installer: D r Address: Phone: Phone: Builder: Engineer: �4),5/ iv ee r,.4. ) 4.3p / Address: _ Phone: Phone: N/A YES I NO i 1. Required#of copies received �- 1 2. Date of soils exam and percolation test not older than 2 years V 3. 4-5 ft of naturally occurring pervious material, above water table f' 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 1, 6. Benchmark indicated and shown-NGVD if near wetlands ✓l - 7. Septic tank minimum 10 ft from foundation, deck Var.: ! 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: t - • 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal ! . 16. Proposed contours are suitable - I. • 17. System meets slope requirements-min. 1/8", !!"preferred 18. System meets breakout requirements PVC liner: Wall: i 19. Specified tee sizes are proper, gas baffle on outlet tee 1 . 20. Sewage is under 10,000 gpd for parcel I/ 21. No garbage disposal j 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox 1 .. 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes i.. , 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size 28. Se tic tank/pump chamber to be factory waterproofed K" 29. Vent provided if leaching below 3 feet,under driveway/parking r�� / 30. Buoyancy calculations for tank/pump chamber V 31. Engineer to inspect and certify soils: wall: commercial: I {� 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature i 33. H-20 loading is subject to vehicular traffic, groundwater I v 34. Title V Application and permit fee, installer signature / 35. Foundation footing min. 2 feet above adjusted ground water for new house • 36. Deed Restriction required max. Al bedrooms: max. flow: gpd �j 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: r' O 711 7.aq- a--z.