HomeMy WebLinkAboutCorrespondence PRO .erties,
INC.
Your COapiPie H Ydloo servk s Company
July 13, 2022
To: Yarmouth Health Division
Attn: Bruce Murphy
Ref: Description of Work
Location: 2 Channel Point Drive, W. Yarmouth, MA.
Bruce,
As requested,the scope of work for the upcoming project located a 2 Channel Point
Drive includes an "out of the ground" addition, consisting of a grade level three car garage with
a grade level 1/2 bathroom. The grade level will also consist of a covered wet bar, opened to
outside facing the back yard.
Above the garage will be a conditioned guest suite with a counter-top and flush mount sink,
full bathroom, and an open deck looking out over the back yard.
The addition will be to the right of the existing main house which contains five bedrooms as
noted within the provided existing house plans.
An inground gunite swimming pool with associated landscaping located in the back yard will
also be part of this project.
The new septic system which will be serving both the existing house as well as this proposed
addition has been designed by BSC Group and will be located in the front yard and running to
the left of the existing house.
If there is any other information necessary, please do not hesitate to contact me.
Sincerely,
7/ Zeal RECEIVED
Mark Leonardi `1,l22
HEALTH DEPT
255 Bear Hill Road, Waltham, MA. 02451 -Tel 781.902.8480, Fax 781.893.9898