No preview available
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 1 G/ Lot _ � c _ Zone of Contribution: In Out Acreage /// Commercial: Residential: Street: C l.4rJ A.,e ! D c. Village: Floor Plan: 4./- #Bedrooms: 4 Owner: _ Installer: na f c ' hi y- _ch42 ___ Address: Phone: �� Phone: Builder: Engineer: 13 S C grbL Address: Phone: Phone: NIA - YES I NO I 1. Required#of copies received -- i ---- 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table _ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands it 7. Septic tank minimum 10 ft from foundation, deck Var.: f . Qom. _ __ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: _ j 11. Tank/leaching minimum 10 ft from property line Var.: 1- 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1.------*: 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-nun. 1/8", `,4."preferred 18. System meets breakout requirements PVC liner: Wall: I 19. Specified tee sizes are proper, gas baffle on outlet tee i 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal t� 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox v1-,-- j 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size - L---" 28. Se tic tank/pump chamber to be factory waterproofed !� 29. Vent provided if leaching below 3 feet, under driveway/parking / 30. Buoyancy calculations for tank pump chamber 31. Engineer to inspect and certify / -__ fY soils: wall: commercial: 32. Engineeraegistered Sanitarian and Land Surveyor stamps/signature j C 33. H-20 loading is subject to vehicular traffic, groundwater 1 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/L ... abel groundwater in Assessor's Map I,,,L______,_ Plan reviewed by: _ /� • • (,00: