HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. _2t, Lot r;30 Zone of Contribution: In Out '✓Acreage D./�
Commercial: Residential:
Street: �-.e-
Village: Floor Plan:
Bedrooms:
Owner: i .e., Va yr LJ 2 i r�/...) Installer: B f 3
Address: Phone:
Phone:
Builder: Engineer: /6A.e,r1
Address: Phone: •
Phone:
NIA YES I NO 1
1. Required#of copies received ✓
2. Date of soils exam and percolation test not older than 2 years I :, __
3. 4-5 ft of naturally occurring pervious material, above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands v-
7. Septic tank minimum 10 ft from foundation, deck Var.: e-----
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: i
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: a�
i 11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓
15. System not in top or subsoil(A,B horizons)or 5' removal _ I ! --
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", `,%<"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel ' �/
21. No garbage disposal ,4
�/
22. System adequately sized for its intended use I
23. Minimum 6"stone or compacted below tank and dbox I / j
24. Manhole covers within 6"of grade, pump chamber cover to grade
_25. Inspection port on plastic chambers/leach field t-I
26. Electrical permit for pump chamber/Separate meter for duplexes •
-
27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size ./
28. Se tic tank/pump chamber to be factory waterproofed /
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber , /
31. Engineer to inspect and certify soils: wall: commercial: 18✓ e
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature j 1 V I
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min..2 feet above adjusted ground water for new house i 'Io
36. Deed Restriction required max. #bedrooms: max. flow: gpd f
37. Check area lots for groundwater/Label groundwater in Assessor's Map '
Iv
Plan reviewed by: _ '-
/ - 27 40'0;