HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 3 a Lot f Zone of Contribution: In Out Acreage �j 6 O tJ
/ / N\ b // R C Commercial: Residential:
Street: `� �
Village: l Floor Plan: r #Bedrooms: 0
Owner: Installer:Co P e L 6,1 &P1; C. cc--r 1,l'el rs
Address: _ Phone:
Phone:
Address:Bud lder: Engineer: �N c,I I., c t� % 1
Phone:
Phone:
N/A YES NO
1. Required#of copies received V
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: '_
6. Benchmark indicated and shown-NGVD if near wetlands 4�
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t�
9. Leaching minimum 100 ft from wetlands Var.: 1
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: r/,
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: 1/
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.`
15. System not in top or subsoil(A,B horizons)or 5' removal Z
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", Y."preferred
18. System meets breakout requirements PVC liner: Wall: <,..„
19. Specified tee sizes are proper, gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal ,---
22. System adequately sized for its intended use L�
23.Minimum 6"stone or compacted below tank and dbox G�
24. Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes ! L/
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: „/
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house /
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by_ 60301
/0 ' � '� 2